2010 3. clarksville, brandon brummett, army corps …...commander and district engineer 502 315 6102...
TRANSCRIPT
The Louisville Engineer DistrictThe Louisville Engineer District
CORPS 101
Brandon R Brummett P E PMPBrandon R. Brummett, P.E., PMPOutreach Coordinator
Louisville District
07 May 2010
US Army Corps of EngineersBUILDING STRONG® BUILDING STRONGSM
Corps MissionsCorps Missions
• Disaster Response• Hydropower
• Regulatory Program • Facilities Design &
• Water Supply• Recreation
Construction• Environmental
I f t t• Shore Protection • Flood and Storm
Infrastructure • Ecosystem Restoration
Damage Reduction• Navigation
• Installation Support• Watershed Planning
BUILDING STRONG®
Civil Works BoundariesSALAMONIE J. EDWARD ROUSH
INOH
MISSISSINEWA
CLARENCE J. BROWN
CECIL M. HARDEN
Olmsted Locks and Dam
IL
INCAESAR CREEK
CAGLES MILL MONROE
WILLIAM H. HARSHA
WEST FORK MILL CREEK
BROOKVILLE
IL
KY
PATOKA
MARKLAND L&D
CANNELTON McALPINE L&D
�KY
LouisvilleT
CAVE RUN
BUCKHORNNOLINROUGH
RIVER
1
2
JOHN T. MYERS
L&D 53T
L&D
NEWBURGH L&D
L&D 52
TAYLORSVILLE
T
T
T
TENN
BUCKHORN CARRCREEKGREEN
RIVERBARREN RIVER
RIVER
OLMSTED L&D
SMITHLAND L&D
T
BUILDING STRONG®
TENN
It Takes Two to TangoAuthorization► Study, program, or project► Study, program, or project► Water Resources Development Act
(WRDA)(WRDA) ► Committee resolution
AppropriationA l t bli t d d► Approval to obligate and expend funds for an authorized study, program, or
j tproject► Annual Energy & Water Development
A i ti A t (EWDA)BUILDING STRONG®
Appropriation Act (EWDA)
Key Policy and Lawsy y
Flood Control & WRDAFlood Control & WRDA► 1936 FCA – benefits exceed costs (benefit cost
ratios))► 1986 WRDA – cost sharing required for most
projects
Laws Statutes and Executive OrdersLaws, Statutes and Executive Orders► National Environmental Policy Act► Clean Water Act► Clean Water Act► National Historic Preservation Act► EO 11988 Flood Plain Management
BUILDING STRONG®
► EO 11988 – Flood Plain Management
General Investigations ProjectStudy Authority
General Investigations ProjectStudy AuthorityRecon Phase► Letter of Intent► Letter of Intent► Recon Report - 905 (b)F ibilit PhFeasibility Phase► Feasibility Cost Sharing Agreement► Chief’s ReportPreconstruction Engineering and DesignProject Authorization Project Construction
BUILDING STRONG®
Project Construction
Continuing Authorities ProjectFeasibility Phase
g jy
► Preliminary Assessment Report► Feasibility Cost Sharing Agreement► Feasibility Cost Sharing Agreement► Detailed Project Report
Plans & Specifications PhaseP j t C ti A t E ti► Project Cooperation Agreement Execution
► Real Estate Acquisition
Project Construction
BUILDING STRONG®
j
Continuing Authorities ProgramContinuing Authorities Program Overview
Annual perSection Description Per Project ProgramSection Description Per Project Program
($M) ($M)14 Streambank/Shore protection 1.5 15p
107 Navigation 7 35205 Flood Damage Reduction 7 55g208 Flood Snagging/Clearing 0.5 7.5206 Aquatic Restoration 5 40206 Aquatic Restoration 5 401135 Ecosystem Restoration 5 25
BUILDING STRONG®
Other AuthoritiesOther Authorities
• Environmental Infrastructure (Section 219)
• Planning Assistance to States (Section 22)
• Flood Plain Management Services Program
Emergency Management (PL 84 99)• Emergency Management (PL 84-99)
• Major Rehabilitation (O&M)Major Rehabilitation (O&M)
BUILDING STRONG®
HQ Provides Budget Guidance ( Mar )
HQ Review & Approval
( May -Jun )( y )
Field Offices DevelopP R i tOMB Provides Budget Program Requirements
( Mar - Apr )OMB Provides Budget
Guidance ( Jan )
Funding Alloc. To Field Offices
Budget Presented
To Field Offices( Oct - Dec )
Budget Presented to Sec. Army(Jul - Aug )
Budget Submitted to OMB ( Sep )
OMB Passback( Nov )President Signs
Approp Bill ( )President’s Budgetto Congress ( Feb )
Appropriations Bills( Jul - Sep )
Approp. Bill ( Sep - Oct )
Budget Resolutions
For Further InformationFor Further Information
COL Keith A. Landry, P.E., Ph.D.Commander and District Engineer
502 315 6102
Mr. David F. Dale, P.E., PMPDeputy District Engineer
502 315 6104502.315.6102
M Sh M B d
502.315.6104
M Li d R M h P E Ms. Sharon M. BondChief, Planning Branch
502.315.6857
Ms. Linda R. Murphy, P.E. Chief, Civil Project Mgt. Branch
502.315.6784
Mr Brandon R Brummett P E PMPMs Susan M Toutant P E PMP Mr. Brandon R. Brummett, P.E., PMPOutreach Coordinator
502.315.6883
Ms. Susan M. Toutant, P.E., PMPExecutive Liaison Officer
502.315.6105
BUILDING STRONG®
https //155 80 93 240/congress/ sace/https://155.80.93.240/congress/usace/
BUILDING STRONG®
BUILDING STRONG®