2009-08-07
DESCRIPTION
• Receiving and unloading reinforcing and tightening form systems • Start demo of approaches off of John Kimbrough. • Forming shear walls and crawlspace walls is ongoing • Forming, reinforcing, and poring pile caps and shear walls • Drilling and pumping auger cast piles • Installation of electrical primary manholes complete. • Finished sanitary sewer lines F • Backfilling west side of building to sub grade • Site fills and grading ongoing Storm Sewer LineTRANSCRIPT
![Page 1: 2009-08-07](https://reader036.vdocuments.mx/reader036/viewer/2022081908/568bd5ce1a28ab203499c5d7/html5/thumbnails/1.jpg)
• Forming, reinforcing, and poring pile caps and shear walls
• Drilling and pumping auger cast piles
• Backfilling west side of building to sub grade
• Receiving and unloading reinforcing and tightening form systems
• Installing 30” storm sewer on the east side of the site.
• Finished sanitary sewer lines F
• Installation of electrical duct bank started
• Installation of electrical primary manholes complete.
• Forming shear walls and crawlspace walls is ongoing
• Start demo of approaches off of John Kimbrough.
• Site fills and grading ongoing
Texas A&M University Agriculture Headquarters
Week ly Repor t : 8 /3 / 09 -8 /7 / 09
South View Pile Caps
Crawlspace Walls South View East View
Storm Sewer Line