2007 – 2011 plan of work (pow) january 2006 things we will cover background information –the...

15
2007 – 2011 Plan of Work (POW) January 2006

Upload: isabela-block

Post on 29-Mar-2015

215 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2007 – 2011 Plan of Work (POW) January 2006 Things We Will Cover Background Information –The 2000 – 2006 Plan of Work cycle –Plans for the next Plan

2007 – 2011 Plan of Work (POW)

January 2006

Page 2: 2007 – 2011 Plan of Work (POW) January 2006 Things We Will Cover Background Information –The 2000 – 2006 Plan of Work cycle –Plans for the next Plan

Things We Will Cover

• Background Information– The 2000 – 2006 Plan of Work cycle– Plans for the next Plan of Work cycle

• Structure of the next Plan of Work

• What we will do with this data

Page 3: 2007 – 2011 Plan of Work (POW) January 2006 Things We Will Cover Background Information –The 2000 – 2006 Plan of Work cycle –Plans for the next Plan

AREERA

• Plan of Work

• Annual Report of Accomplishments and Results

• Multistate Extension

• Integrated Research and Extension

• Multistate Research name

Page 4: 2007 – 2011 Plan of Work (POW) January 2006 Things We Will Cover Background Information –The 2000 – 2006 Plan of Work cycle –Plans for the next Plan

Improving Data

• President’s Management Agenda

• OMB PART

• One Solution– Streamlined Data Entry System– Plan of Work is part of Phase 1

Page 5: 2007 – 2011 Plan of Work (POW) January 2006 Things We Will Cover Background Information –The 2000 – 2006 Plan of Work cycle –Plans for the next Plan

Current 2000-2004 5-Year Plan of Work

• Arranged around the 5 GPRA goals established by USDA when the 5 year Plan of Work began

• Unstructured text driven by the states’ perceived need for maximum flexibility and an aversion to a database driven template

• Annual Reports began using Key Themes as a means to try to gain some order to the unstructured text data

Page 6: 2007 – 2011 Plan of Work (POW) January 2006 Things We Will Cover Background Information –The 2000 – 2006 Plan of Work cycle –Plans for the next Plan

2005 – 2006 Plan of Work Update

• Submitted to CSREES by April 1, 2004

• Extended the current Plan of Work Cycle to include FY 2005 & 2006

• 5 – 10 page document – States could add any relevant information not

included in 2000 – 2004 Plan of Work– Outlined changes in focus over two year period

from the original Plan

Page 7: 2007 – 2011 Plan of Work (POW) January 2006 Things We Will Cover Background Information –The 2000 – 2006 Plan of Work cycle –Plans for the next Plan

Plans for Next Plan of Work Cycle

• 2007 – 2011 (Rolling 5 Year Plans)

• New plan will be due June 1, 2006

• Proposed written guidance published for next POW Cycle in June 2005 in Federal Register

• 30 Day Comment Period

• Final Guidelines to be published

Page 8: 2007 – 2011 Plan of Work (POW) January 2006 Things We Will Cover Background Information –The 2000 – 2006 Plan of Work cycle –Plans for the next Plan

Plans for Next Plan of Work Cycle

• Need to structure the Plan of Work and Annual Report Data to allow for timely analysis of the data

• Need for some standardized measures

Page 9: 2007 – 2011 Plan of Work (POW) January 2006 Things We Will Cover Background Information –The 2000 – 2006 Plan of Work cycle –Plans for the next Plan

Plans for Next Plan of Work Cycle

• Ease the burden on the States

• Easier to review

• Easier to track progress

• Easier to analyze the data

Page 10: 2007 – 2011 Plan of Work (POW) January 2006 Things We Will Cover Background Information –The 2000 – 2006 Plan of Work cycle –Plans for the next Plan

The Plan of Work Software• Web-based and database driven• Pilot testing in three phases

– September– October

• Released on November 16, 2005– “Sandbox” version

• Production Version to be Released in January

Page 11: 2007 – 2011 Plan of Work (POW) January 2006 Things We Will Cover Background Information –The 2000 – 2006 Plan of Work cycle –Plans for the next Plan

Structure of 2007-2011 POW

1. Plan Overview Section

2. Planned Programs Section

3. Multistate Extension and Integrated Research and Extension (Sections 105 & 204 of AREERA)

Page 12: 2007 – 2011 Plan of Work (POW) January 2006 Things We Will Cover Background Information –The 2000 – 2006 Plan of Work cycle –Plans for the next Plan

Structure of 2007-2011 POW

1. Plan Overview Section• Contact Information• Plan Overview Text and Overall FTEs/Sys• Stakeholder Input• Merit Review (Program Review)• Evaluation of the Multis & Joint Programs

Page 13: 2007 – 2011 Plan of Work (POW) January 2006 Things We Will Cover Background Information –The 2000 – 2006 Plan of Work cycle –Plans for the next Plan

Structure of 2007-2011 POW

2. Planned Programs Section• Name of State Defined Program Unit

• Knowledge Area Classification

• Program Duration

• Basic Logic Model Format

• Evaluation Strategy

Page 14: 2007 – 2011 Plan of Work (POW) January 2006 Things We Will Cover Background Information –The 2000 – 2006 Plan of Work cycle –Plans for the next Plan

Structure of 2007-2011 POW

3. Multistate Extension and Integrated Research and Extension (Sections 105 & 204 of AREERA)

• Base Percentage• Target Percentage for All Future Years• Plan Target Dollars for Duration of Plan

Page 15: 2007 – 2011 Plan of Work (POW) January 2006 Things We Will Cover Background Information –The 2000 – 2006 Plan of Work cycle –Plans for the next Plan

End of Module 1

• Bart Hewitt– [email protected]– 202-720-0747