PLANNING l~ETING

0800 4/12./79

1. Review Action Items from 4/11/79 Technical Revie\i lo!eeting.

2. Review •Top Priorities• list • .

3. Review •oaoo, April 12, 1979 Tasks Lists".

4. Review April 12, 1979 "7~-Hour List".

2005 340

..

.- .. _ .... ________ ..... ·-- ····------- ... . ·--------·------..o-.--0800 4/12/79 .·

Top Priorities

1. Install filters in air ejector diacharg, .

Status: Double teea are installed. Duct work haa been tactvelded and welding ia proceeding. Should be complete on 4/12 and be ready for teat.

2. Ch3nge out charcoal filter• in one SO% train in Auxiliary Building.

Status: Filters on-aite. Procedure complete .and available. Trainin~ ia complete. Filter change delayed due to procedure aprroval .delay. EstiQate 3 to 4 daya to coaplete change.

, . I •

No fire hazard exists from expended charcoal. Filters will be double wrapped in poly and shipped in wooden crates.

3. Ch3nge out charcoal filters in one 50% train of nt Bldg.

Status ~ Fllt~rs are avoidable. Work scheduled to begin upon completion of AB filters.

4. Install liquid waste tank farm in spent fuel pool A.

Status: Steel for racks will be on-site on 4/12. The tanks are being modified and will be back on-site in time to be put in pool. All pipe is on-site; valves and instruments are on order. Con­crete shield slabs will be fabricated on-&ite. Will retain capability to flood pool if desired. Foreman has been assigned and ia lining up personnel. Estimated completion is 4/22 to 4/26.

5. Install Cap-Gun syst~ in Chemical Cleaning Building to process Unit 2 water.

Status: Building is being cocooned on inside and monorail to remove cask is being installed. 20-ton hoist is being flown in from Wlscon­si~ on 4/12. Eaticated completion. is 4/23 but schedule is being reviewed.

6. Decay Heat Removal System (Support of Base Plan).

Status: Upgrading of existing system being held up by AB contamination. Decontaminat!on to begin 4/13. The skid ayste= will be installed in pit outside building. May be some interference with buried pipe.

7. P/V Control Sys tem (Support of Base Plan).

Status: Crit~ria being established for N2 pressurized passive system. Schedule to bo established.

2005 341

Technical Review Meeting

1800, 4/11/79

1. Sample of MO tank could not be obtained at 5 psi . Isolate tank, let pressure build up to 10 psi and attempt to get a sample.

2. Criteria has been established to get into long­term using natural circulation.

a. Provide schedule for using both "A" and "B" OTSG in a solid condition.

b. Write procedures for initiating natural circulation based on criteria.

3. B&W has looked at the Reflux method of cooling as a back- up to natural circulation. It looks promising, but tw.. ~tems require additional study.·

a . Study effects of noncondensibles.

b. Study how to m~asure water level in reactor vessel.

4. Provide results of primary sample analysis of the Bettis, ORNL, and Savannah River.

5. Determine ~~thod of getting pressurized primary sample by shielding the 250 mil bomb or modifying rig for 30 mil bomb.

6. Provide rationalization for proceeding to Point B (reduced temperatu~e) on Base Case summary Rev. 2 . To be revi ewed by NRC before proceeding.

1. Determine what documentation for SER and tech. spec. changes must be transmitted to NRC under a Met-Ed signature.

B. Prepare submittal to NRC for Long-Term Cooling using Natural Circulation.

1. Submit to NRC by 4/12 .

2. Review by 4/13.

Action

Herbein

Harper (Cobean)

Crimmins (Wilson)

J-tcMillan

McMillan

NRC

Levy/ Wilson

Crimmins (Wilson)

NRC

Crimmins (W1.lson)

NRC

2005 342

RC Pressure

(psi)

/DOD

TMI-2 Recovery IASE CASE SUMMARY (Revision 6}

RC "Temp F).

'4/11/79 1700

(1) Degas at A. Lower pressure (A~A') while degassing, then return to A.

(2) Continue design/installation of sta"tic & active systems for primary rnakeup,'lcvcl control and secondary cooling system for S/G "B".

(3) n~duce temperatur~ (A_.B) by stea~ing on "A" S/G. Verify operability of se•ondary cooling system for "B" S/G. .

(4) At B, establish st lid cooling to "B" S/G, and when stable, isolate "A .. S/G. •

• (5) Reduce temperaturt (B~C) with S/G "B". As soon as possible, start solid operation with "A" S/G, with modification pkg to be determined.

(6) At c, trip RC Pump "A" and establish natural circulation in •A" and •a .. loops.

(7) Reduce primary pressure to value to be determined (C-•D).

(8) T"ke primary system solid - activate new MU/pressure control systel.\.

END POINT Primary: Natural circulation, solid water, long term P/V control Secondary: Solid water, long term heat dump system

APPROVED FOR ISSUE:

· .. · ..

R. c. Arnold 2005 343

Task

LS.l.

LS.2.·

TP.l.

TP.l2.

TP.l3.

TP.20.

TP.22.

TP. J8.

TP.40.

TM.l.

TM.2.

TM.S.

0800 4/12/79

Technical CPU Support Croup

Description

Plan for near term NRC interaction

Tech. Spec. deletions; chaages to those left & additions Plan for normal transition to natural circulation -provide analysis procedure

Fire in plant areas proce­dure

Evacuation of Control Room procedure

Loss of letdown flov train

Procedure for loss of SC heat sink

Plan for establishing solid system OTSC A & R

Procedure for determing gas level in RCS by M/U tank pressure increase

.,B" SG Closed Cooling System. Criteria/ approval

Back-up reactor pressure control system (active). Criteria/approval

System to measure veter level in Reactor Build­ing. Criteria/approval

1

1

1

1

1

1

1

1

1

1

1

Status/Date Due

4/11 mel!IO docu­menting report­ing agreement with NRC.

NRC interactions

Task Coord.

L. W. Harding

under negotiation L. W. Harding

1st draft being reviewed

P.ev. 0 - out Rev. 1 in review

Draft out for review 4/10 14:30

Final Issue 4/11. 12:00

4/11

Status being checked.

Keaten/ Crimmins

Edwards

Pope/ Keaton

c. Broughton Dye

Broughton/ Pope

Brewer

Broughton/ Lowe

Criteria out for Slear review 4/10, 19:00

Criteria out for review Slear

Criteria out for review Sl.ear

2005 344

0800 4/12/79

Technical CPU su22ort Croup

Task Task Descri2tion Prioriti Status/Date Due Coord.

M.2. Boron concentration recom-mendation in Reactor Awaiting sample Coolant System 1 results

M.J. Relative to B&W recommends-tion H2 gas measurement in primary. Coolant - assess total H2 data 1 4/11 Bachofer

AA.l7 • Determine methodology for measurement of dissolved Think Tank, and suspended noncon- B&W densible gas in main Continuing 2 Cri11111ins/ coolant system 1 procedures Cunningham

M.20. Provide criteria !or deter-mining if natural circula-tlon is not achieved from Crimmins/ results of instrumentation Cunningham

2005 345

. . . THURSDAY. APRIL 12. 1979 .

TASK DESCRIPTION

PLANT OPERATIONS STAFF

PRIORITY

11 Obtain RCS de-pressurized sample results

•2 Obtain RCS pressurized sample­write procedure to incl . lead pig for shielding the sample bomb

3 Loss of pzr. level programs -Test Heise Gauge for 2nd press. 1vl. ind. - put in service

4 Sample HU tank gas space.

5 Degas RCS - reduce plant pressure in 50 psig increments to 300 psig

6 A- Review RB cooling methods (RR sys . vs. industrial cooling-RB sys.) 8-RR pumps require run-in -~~nitor and report any added leakage on AB floor due to emerg. RR pumps

8 Emergency plan -A - Unit 1 cont. rm. B - Unit 2 cont. rm. C - Unit 2 evacuation total 0 - Site evacuation

9 Restore pressuriter heaters -920 kw of total 1638 available

10 Estab . spill-control proc. for control of 'samples

11 Get Geli setup at S. Bridge

12 Issue master organizational plan

13 Provide list of by-passed interlocks and normal plant trips to command center (Trailer '23)

14 Check at1110s. dump on OTSG "8" for L~akage to H20 area or stack

(1" valve has Body{Bonn~t 1u1t • )

1

1

1

1

1

1

2

2

2

2

2

2

2

STA11JS/DUE DATE

4/10-Sent off: site Bettis/Oak Ridge/ Savannah/Bai~/~IEC for analysis

Need proc. -Review for minimal exposure - 4/13

: .

Fillin~ Reference Le~ 1:./12 . .,._. Place in serv. 4/12

Awaiting & Proc. Preparation 4/12 On-~oing, pressure/ vent-Evolution in progress. 4/10

(maintain .c.s psig neg.)

Procedures Should incl.: criteria/who remains behind/ ops. functions prior to leaving

Low priority

Being developed

Use jumper log -4/12

No WOTk started

7ft f.. + l

TASK CO-ORD.

Hetrid/ Rogers

Hetrick/ Graber/ Devine

Shift sup. Devine

Hetrick

Devine

Devine/ Floyd Shovlin/ Shift Sup •

Criu.ins

Porter

Graber

Poner

Colitz/ Christman

Porter

Shift Sup .

.......

WASTE P.IANACEHENT CROUP

TASK DESCRIPTIO.~ PRIORITY

1 A-Set-up to change AB/FH bldg: vent. filters 1 (ensure zero leakage - QC to follow)

2 Vacuum pump - condenser off-gas filter sys. - 1

3

4

s

6

7

8

9

cut in using blank and hose - run (1) HR test w/fire hose for protection ·

A-Design and construct high level liq. waste 1 storage vessels using spent fuel storage pool "A" systeo dc~lgn not fin~l, ste~l not ordered.

D-Empty water from (2) lSK gal . tanks for return to VDR. and test - total (4) req'd.

Oecon water in AB using cap-gun ion exchanger process - prepare chem. cln. bldg.

WDL-T-88 requires sample results - transfer of A/B Neut. Tk. to Unit 1 held up p~nding approval by WH Group.

Develop redundant AB/FH air filter system

Vent stack monitor HP -R219 recovery system­additional monitor due on site.

Decon DC Bld&.

Pump Bleed T3nks-Unit 2 to Unit 1

1

1

1

2

2

2

2

0800 4/12/79

STATUS/DATE DUE

Need addl . !Dan­power - 18 people in training/work to start 4/11

Install - 4/11 Test Pending Compl.

Need HP survey in Pool

3 shipped 1 to pWIIp

Design • 90% 4/23 .

4/11 Need Procedure

Design est. 4/13

Design 4/11 Xunkel expedit'g parts

Hold pending: 1. No Space Avail . 2. NRC Questions

2005 .7..4 7

TASK CO-ORD.

Shovlin/ Futril/ Bitel

Gunn/ Toole

Thorpe/ Bitel/ Co bean Gunn

~Iiller/ Cunn

Co bean/ Gunn/ McCutcheo

Shift Sup Hetrick Bitel

Cobean/ Gunn

Porter/ Co bean/ Gunn

Gunn/ Bitel

Shift Supt.

Task

WG-2

TS-3

'IS-4

TS-10

TS-11

WC-6

WC-8

1063

2002

TS-6

WG-1

TS-9

Plant Modifications

Description Priority

Decon. water in AB using Cap-Gun ion exchange process 1

Develop complete packege for short-te~ cooling of "r~~ 1

Develop complete package for measuring water level inside Reactor Building ' 1

Decide location & design 2-2500 kW diesel generators 1

Develop electrical distri­bution system. Install cabling and switchgear from DG's to current BOP loads requiring loss of off-site power protection 1

Install storage vessels in Fuel Pool "A" 1

Install roll-t•p door airlock to Fuel Handling Building 1

Condenser vacuum pump filters 1

RC loop passive pressure control system 1

RC loop active pressure control system 1

Install AB/FHB Filter System 2

Provide augmented instru-ment air system 2

0800 4/12/79

Status/Date Due

Complete procure­ment - 4/14 Equip. avail. 4/21 Install. ~p. 4/22

Install. Coop. "B" 4/30

Equip. avail. 4/11 Install 4/12 Completed

Equip. avail. 4/11

Equip. avail. 4/10 Install comp. 4/20

Equip. avail. 4/12 lnst. comp. 4/15

Included w/WG-6

Installation com­plete except for pipe tie-in 4/11

Schedule avail. 4/12

Schedule avail. 4/12

Equip. avail. -4/16, Install. Comp. - 4/16

Equip. avail. -4/14. install. comp. - 4/16

Task Coord .

2005 348

0800 4/12/79

Plant Modifications

Task ~ Descri2tion Priorit::i: Status/Date Due Coord.

TS-1 Study methods to improve plant ~le-ctrical supply reliability 2 4/11

WG-3 Vent stack monitor HPR-219 Equip. avail.-recovery system 2 4/12, install.

comp. 4/13

TS-5 Method for containment flooding with 106 ftl . of water 3 4/13

TS-8 Install housing for two (2) long-term HP DHR Design - 4/20 systems 3 Install. - 5/31

TS-13 Install and complete turn-over package of electrical heaters in supply side of Aux. Bldg. 2 Sched. avail. 4/12

TS-14 Shield for decay heat pump pits 1 Sched. lP

2005 349

Industry Advisory Croup

Task

1

2

3

4

s

6

7

Description Priority

Determine method of finding leak in vent header 1+

Provide recommendation for alternative methods of P/V control

Evaluate fire in containment

t fnit 7 Containment Bldg. a . P~ssible causes of

'.hange of state b. ~/T suitable for 30 days c. Cleanup options for

cont. atmosphere

Current assessment of core

1

1

1

1 1

2

status - 1 a. From thermal-hydraulics

instrument data b. Sequence of events and

core description from event understanding

Provide documentation of com-pleted items 2

8 Surveillance of Waste Mat.

9

Croup

TMI Unit 1 start-up criteria or securing criteri:l.

2

2

Status/Date Du10

ASAP

Working

Being restudied

Co~~~plete

Present 4/11

4/li 4/11

Ongoing

0800 4/12/79

Task Coord.

H. Lavborski

Thiesing

J. Thiesing

s. Levy S. Levy

To .be assigned

s. Levy

Solbrig

Dietrich Paladina

To be assigned

To be assigned

2005 350

,---1

. ~.

Taalc

I.A. 3.

I.A.J.

I.B.1.

l.B.2.

I.B.4 .

I. B. 5,

II.A.l

II.A.l.

II.A.l.

1I.A.2.

It. B.

Westinghouse

Descri2tion Prioriti

Define Aux. Bldg. T.V. monitor needs for exist-ing DRR system. 1

Define DHR remote operation (pump & valve) needs. 1

Decotttaminate Aux. Bldg. for DHR Sys. checkout . 1

Install Aux. Bldg. T.·. V. ~onitor for existing DHR system. 1

!~stall DHR remote opera-tion equipment. 1

DIIR flo11/pressure tests 1

ADHR (nO!w) system design & appr. val 1

ADHR final test procedure 1

Fina4 ADHR installation prccedure 1

ADHR procurement 1

I~HR installation 1

0800 4/12/79

Task StatuslDate Due Coord.

Ongoing/4-13 M. Siano

Ongoing 1200/4-12 M. Siano

4/13 M. Sian~

After dec:on. M. Siano

After decon. M. Siano

"After dec on. M. Siano

Ongoing 4/13 M. Siano

Ongoing M. Siano

Ongoing M. Siano

Ongoing tl. Siano

No .status M. Siano

20 05 351

1

2

3

4

5

6

7

8

9

10

11

Descripticn

Analysis of gas cone. in Primary System

Provide list of critical systems for present conditions

Provide noise analysis of

Priority

1

1

pressure during degassing 1

Develop procedure to deter­mine pressurizer level using Heise Gauge 1

Develop guide for cooldown using OTSG's on natural circulation 1

Provide safety analysis show-ing long-term cooling is safe. maintainable. etc. (NRC Review) 1

Review lAG analysis of long­term reactor cooling con­sidering flow leakage paths

Resolve iss~ea on boration to 3000 ppm

Determine minimum primary system pr~ssure (point D. Ba:;e Plan}

Core analysis program: a. thermocouples from

incores b. ..neutron signals from

incores

Document of sequence of plant conditions in base plan

1

1

2

2

3

0800 4/12/79

Task Status/Date Due Coord.

Working 4/12 Kulynych

Continuing

Worldng

Co:~~pleted

Completed delivered in

4/11 mtg,

Rogers

Rogers

Kulynych

Kulynycb

P.relim. 4/10. 1600 Final 4/13 l:ulynycb

Resolved by RC sample

Working 4/12

Described at 4/11 mtg.

Still Working

Colllpleted

Kulynycb

Kulynych

-Kulynych

2005 352

--!--. ...;.,;.,..---;--: - ---:---~ -- ·!--~ . --i -~-- . ~ _ -~-~-:--------~--.:..~'-..;l--~-------~~--,-~1;--~_-:-_ -lj-~;1--:-. -~1-lt:--il --:---:~--7-'i -t----:--,.~-f-1 --:-, _!..7~2:.:-J~lO~U~R:.._L~I~S~'I~·~--l--·.-...:.1 __ 1

1 Description ! ' 1 4 12 1

4 13 ' ! 4 14 l 4 15 I 1 : ; • I : I ' I ' ! I I I L 1

1'~- -= tPLANTOPERATIONS ·--~----1-·--:._ . .:.. .. .. ; __ ;_,_ _ __ j_ ,_ • • I ' . . : : : i . ' I 1 ; i · : , · r· · L. ( ·- -· ~ -- I

· -~Pre·s~u-ri~ed-Fooiiint ~ampie--r--.-· - ·t--~-- ·· - -- · -f- - ' .l ,·- . -~ ~---;- --: ·; · ! --i --~-' 1! --L,· .:__ IL_ · L. .. ,._._ • ; -,. . -- ~- --J.. . ··~-r~ _ _[ I

' ; i l ; I t Ongoin1 · - ~-f-· ___ I Rea~t?r.t~?l!Jown to ~20 ~. st;eaming I I : . 1 • 1 "' 1

I ! ! l I I ' ,-=+- .. -r-~-· -...- r·-- ··-t·-+-- --~- --·l'MiTntairi-co~taTriiiienrlt~t&-~--l .... -1 j Ongoin ' j L .

' : _1_ i : ! r· 1 • 1 1 1 I i 1 1

'

--r-;- - j _;__I f • rrr·-~ I +----, 0 -:--1 - - __ _I_ -! -~ .. _ _i!les+~ a1s - 1to l:oo p ig J i · nlto n • 1

I i i I . .i .-+ ' '±I _=r-1 I- __ I -~-·-:-sl -:r,le/*unJ:r--::'~ :: Hte-·Neutral izur'· - -- -·-+· _..:. __ 1__ : 1 1

T~nk : ! j 1 I I 1 - • ' .. --~· •

: . l ; I I I I I ' --:- • 1 - .--: --· r-c--~-;--r- ·-r-·1 -r-.-- 1 -- ·f-r· . ...:.Core An3ly£is.- ;_ __ ... .! .. . ,.. · -~ . I _

1

_. ~- _ i ___ --- -~~~1~ . ~ . I __ ' ; . ; j : ! ! I i I ! I : . ' I -. : ·- ,--·-

--~a ... ~ lnc.or~~~C~s. -~.-4 - --~--·- -~-. - __ _ J ___ , __ .L I I L : 1

j b . : Neutron signal froo incores 1 l ! 1 · I····;--· --·-i--,-- ·: .. -i __ · '!" ~: ~~!;e~!i~:is ~ .. -,---f--j--·r : .. ·· !· - t-·- · -t--~- __ _l_l- .. --~ --1 -

_1

!!.: l.E~-i<?.!'.!.l!~.!.~~~mthl~~--'--'r- i I i I I ! -+ I i r : ; 1 i · i I I ! i ----, -r- · ·T·-··r- ~ ·--r-- ·

--:a..e~o~.""·~heac ... ;-=-_,.,.k-:-l- -s,J~ak --1L--I- tt -H· ! for l eakage I 1 • I I I : I ' I

--T--·-- ·t-- -- --'--+- ·--~---·- --~- ·- I I I

! Rei~e C~uge ~ j i I l I I Ref heck at hig~e-;;,res£~;~ze~l~ - 1 11 .. --!- i- ! ; ...,.--., -r--,. --CI' - ' 11 ---~- '! l I -

• I ' • • I I I ; i I i . I -.-- - L- - ----- • --r----!..·-· . - ··- _.__ · I I I ; ; l 't : l I i ; i-- --.-·, -- -T-.- - -- i I

-- ~- ~-- ------· -· -L-:._: ...... ;._1_ ·- -·-l--- ---L . ! i I : : ; • : ! ! , I ·· -:---· .. l-rl·-.. -- ~ ··--t-··--· -~---- _ _ _ _:_ __ , __ , ____ _ :_ _!._ .. _ .. ;_ . I j I • : ; ' ; . 1 • j I - - j-·-;--- --,· i ·- i---l--

.:.... . -~---· ~ - . -~ - ~ _.J.. __ _ : ·-+-- ,. -tl . I I I I - , - ; ... - l t • I ' : ·-· ·- · --·!-·--,--...--- - --

1 : 1 : ! : : I 1 1.

- -'- . --~-· - · ·-- ' i . i I I • I I -- .,-·- ·-·-r· . ~- --· , -r~ ·-----·; - -- ·~-~-i--i- · ---·-··-~ .. ·-- -~. __ : __ l. __ :_ ___ t_L - ·_I__ . I I

l i ! ; ! i . II. T ' -:- --.. 1 . -;·-·- - ·:-- -1-.-. .. t 1 r J : ! II I

i. ~-·- · ·--·--~- .! .. ,- ·-~_(·· r- :·-;-- · , -~ : - 21ao·?- s)'---r·-. I - ! : I . - --: .. - I i . r--· -[ .. ~ ...

., • ~· 1 t· .. . ! - . ! i

I .. . ~ I . - • ! -•! -·i ; . j' •. j -.

l i· • I

' . • ! .. .

: .. i -

I · ' i ! ..._ ... .... _ .. ,. _ ;--, ~

•'

t t I I

, · Description

: ! --.'"":-- .. .

! ! 4 12

._....;:;__-:-~ _l --·----.~- ! t----"-: --72-l:tOUR LIST

4 13 I

4 14 ; I I 4 5