2000 revelstoke bridge re-hab 2000 meeting presentation

69
Columbia River Bridge Rehabilitation Dario Gnoato

Upload: dario-gnoato

Post on 20-Feb-2017

120 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

Columbia River Bridge Rehabilitation

Dario Gnoato

Page 2: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

Presentation Outline

■  Job Overview ■ Traffic Management ■ Deck Demolition & Surface Preparation ■ Concrete Paving ■  Steel Installation ■ Conclusion

Page 3: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

Job Overview ■  Job Location: Revelstoke, BC

■  Job Start: Sept 7, 1999

■  Job Value: $1.16 Million

■  Job Consisted of:

■  Removing 125m3 of road surface overlay

■  Repairing Subsurface Concrete Cracks

■  Batching and Placing 125m3 of SFRC Overlay

■  Installing 120,000lbs of miscellaneous steel

Page 4: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

Elevation

308m (1010)

General Arrangement

P1 P2

P3 P4

Elevation and Plan Views

7.3m deck width = 2 - 12ft wide lanes

Page 5: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

Traffic Management

■ Ministry advised Kiewit that the Traffic Management Plan was EXTREMELY Important

■  600 vehicles/hr

Page 6: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

Principle Traffic Concerns

■  Safety ■  Emergency preparedness ■ Motorist advisories ■  ZERO full bridge closures ■ Minimize impact on local businesses ■ Minimize wide load advisories

Page 7: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

Experienced Traffic Personnel

Page 8: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

Traffic/Worker Proximity ■  Min. paving width = 12ft

■  Max. allowable lane closure width = 13 ft

Page 9: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

Deck Demolition

■ Remove 125m3 of existing overlay ■  2 stages

■  scarify top 40 mm

■  hydro demo the last 15 mm

Page 10: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

Existing Deck Detail

Page 11: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

Stage 1 - Scarifying CAT PR-453

Page 12: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

Stage 2 - Hydro Demolition

Page 13: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

German made WOMA Pump

700hp Cummins Generator

Page 14: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 15: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 16: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 17: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 18: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

Peak Flow

Page 19: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 20: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 21: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 22: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 23: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 24: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

Concrete

■ Batching ■ Grouting ■ Deck Paving

Page 25: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

Batch Plant ■ 125m^3

Page 26: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

1 YD^3 bags

opening

Page 27: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

Grouting

Page 28: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 29: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 30: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

Concrete Paving Paver - Bidwell OF-500

Page 31: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

Rail on 2x6

Rail on cups

Page 32: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 33: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 34: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 35: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 36: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 37: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

Steel

■ Deck Joints ■  Inspection Panels ■ Girder Drains ■  Suspended Span Drains ■ Drain Troughs ■ Bearings

Page 38: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

Deck Joints ■  3 total

■  7.3m (28ft) each

Page 39: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 40: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 41: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 42: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

Inspection Panels

■  378 total

■  92 support struts

Page 43: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

Gouging

Torching

Page 44: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

3,100 - 3/4” holes

Page 45: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 46: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 47: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 48: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 49: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

Girder Drains ■ 14 total

■ 300# each

■ 1/2 over water

■ 1/2 over land

Page 50: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

Over Water Access - 40ft swing stage

Page 51: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 52: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

1st 2nd

3rd 4th

Page 53: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

Suspended Span Drain

■  70 total

■  300# each

Page 54: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

1st 2nd

3rd

Page 55: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 56: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

Drain Troughs ■  3 total

■  24 pcs. each

Page 57: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 58: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 59: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 60: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

Bearings

■  8 total

■  1500# each

Page 61: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 62: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 63: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 64: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 65: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

1st 2nd

3rd 4th

Page 66: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 67: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation

The Crew

Page 68: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation
Page 69: 2000 Revelstoke Bridge Re-Hab 2000 meeting presentation