20 YEARS IN THE MAKING

AGENDA

Minim ize Im pact s

Const ruct ion

Com m unicat ion

All information presented is preliminary and subject to revision.

MINIMIZING IMPACTS

November/December

LIMITED LANE CLOSURES

March - October

January/February

LIMITED RAMP CLOSURES

SCHEDULE

CONSTRUCTION PHASING

June 2016 - March 2018

March 2018 - November 2018

CONSTRUCTION PHASING

November 2018 - July 2019

CONSTRUCTION PHASING

CONSTRUCTION IMPACTS

WEST OF MLK BLVD BETWEEN PINTO & FIRE STATION 10

Traf f ic Im pact s: MINIMAL Built mostly outside existing roadways Some night closures on Charleston Access to Ellis from Shadow Lane

Charleston

Ellis

GRAND CENTRAL PKWY, CHARLESTON BLVD AND WESTERN

Grand Central

Traf f ic Im pact s: MINIMAL Maintain two lanes of traffic on Grand Central Parkway at all t imes

Traf f ic Im pact s: MINIMAL Traffic to use new connection at Western/Charleston

WALL STREET CLOSED

MLK AND I-15 AT BONNEVILLEMLK

Bonneville

W. Sym

phony Center

Traf f ic Im pact s: MINIMAL Access to businesses maintained at all t imes Night closures of Bonneville and W. Symphony during bridge construction Lane restrictions on MLK during curb work

BETWEEN I-15 AND LOCH LOMAND, OAKEY BLVD & MLK BLVD

Traf f ic Im pact s: MINIMAL Work near neighborhoods performed during daytime hours only Temporary lane restrictions at MLK/Oakey intersection

Loch Lomand

RANCHO EXIT FROM US 95 SB

Traf f ic Im pact s: MODERATE Left turn to NB Rancho will

be closed for approximately 30 days

MLK BLVD ON-RAMP TO US 95 NORTH

Traf f ic Im pact s: MODERATE Alternate access from MLK Blvd to NB US 95 required

DETOUR: MLK BLVD TO US 95 NB

I-15 RAMP TO MLK BLVD

Traf f ic Im pact s: SIGNIFICANT Detours for I-15 NB to MLK, I-15 NB to US 95 NB

DETOUR: I-15 NB TO US 95 NB

DETOUR: I-15 NB TO MLK BLVD

DETOUR: I-15 SB TO MLK BLVD

JULY 2016 – EARLY 2017

NEW CONNECTION: GRAND CENTRAL PARKWAY TO WESTERN

NO IMPACTS TO I-15 MAINLINE

NO IMPACTS TO US 95 MAINLINE

MINIMAL IMPACTS ON LOCAL STREETS

RAMP RESTRICTION

‒ RAMP FROM I-15 NORTH TO US 95 NORTH REDUCED TO ONE-LANE

2 RAMP CLOSURES

‒ MLK ON-RAMP TO US 95 NORTH

‒ RAMP FROM I-15 NORTH TO MLK BLVD

SUMMARY OF IMPACTS

Hot line702-293-NEON

NDOT Project Neon

COMMUNICATION

LinkedInNDOT Project Neon

Em [email protected]

WEBSITENDOTprojectneon.com

Local media

Tw it t er@ndotprojectneon

WEBSITE

NDOTProjectNeon.com

COMMUNITY OUTREACH

PUBLIC OUTREACH OFFICE

320 Wall StreetLas Vegas, NV 89102

Office Hours: M-F 9 a.m. to 6 p.m.Saturdays: 9 a.m. to NoonClosed: Sundays & Holidays

Hotline: 702-293-NEON (6366)

DALE KELLER, P.E.NDOT PROJECT [email protected]

QUESTIONS

Next Public Information Meeting – Early 2017

OPEN COMMENT PERIOD

Please state your full name prior to your question or statement

Three-minute verbal comment per individual