2 pearl river delta & nansha guangzhou huangpu xintang dongguan lianhuashan taiping nansha panyu...
TRANSCRIPT
2
Pearl River Delta & NanshaPearl River Delta & Nansha
GuangzhouHuangpu
Xintang
Dongguan
Lianhuashan
Taiping
Nansha
Panyu
Zhaoqing
Gaoyao
Foshan
Lanshi
Rongqi Beijiao
Chiwan
Shekou
Hong Kong
Yantian
Heshan
Gaoming
Xialan
Jiangmen
Xinhui
Zhuhai
DoumenTaishan
Zhongshan
Macau
3
The first phase of the Nansha portThe first phase of the Nansha port
4
The first phase of the Nansha portThe first phase of the Nansha port
5
The first phase of the Nansha port consists of four 50,000-ton multi-purpose berths with a total of 1,400m in length
The depth of the harbor basin is –13m The total area is 1,820,000m2 and the CY is 900,000m2
It is equipped with 12 post-Panamax quayside container cranes, 36 rubber-tyred gantry cranes and a batch of mobile equipment
The first phase of the Nansha portThe first phase of the Nansha port
6
The second-phase-expansion project will have four 100,000-ton berths with an annual total capacity of 1.2-1.5 million twenty-foot equivalent units (TEUs)
The second-phase-expansion project will cost more than 2.65 billion yuan (US$320 million) and it is expected to be completed before the end of 2007 or early 2008.
Second-phase expansion projectSecond-phase expansion project
7
28th Sept, 2004Xin Yang Zhou
V.15E first calling
at Nansha Port
28th Sept, 2004Xin Yang Zhou
V.15E first calling
at Nansha Port
8
AAS and ANW1 Services Both Call NanshaAAS and ANW1 Services Both Call NanshaAAS and ANW1 Services Both Call NanshaAAS and ANW1 Services Both Call Nansha