2 central institutionscentral institutions dlh dg land transport land transport dgcommunication...
TRANSCRIPT
REPUBLIC OF TURKEYMINISTRY OF TRANSPORT AND COMMUNICATION
DG CONSTRUCTION OF RAILWAYS, PORTS AND
AIRPORTS
2
Centra l Inst i tut ions
DLHD G
L a n d Tr a n s p o r t
D GC o m m u n i c a ti o n
Investment Body
REPUBLIC OF TURKIYEMINISTRY OF TRANSPORT AND COMMUNICATION
DG CONSTRUCTION OF RAILWAYS, PORTS AND AIRPORTS
Railway Sector
ARDAHAN
EREĞLİ
MÜRŞİTPINAR
KARASU
AKSARAY
REPUBLIC OF TURKEY MINISTRY Of TRANSPORT And COMMUNICATIONDG CONSTRUCTION OF RAILWAYS, PORTS AND AIRPORTS
HIGH SPEED
1. Ankara-İzmir High Speed Railway Project (L:624 km)
2. Halkalı Kapıkule High Speed Railway Project (L:230 km)
3. Ankara-Sivas High Speed Railway Project (L:466 km)
4. Sivas-Kars High Speed Railway Project (L:714 km)
5. Eskişehir-Antalya High Speed Railway Project (L:426 km)
6. Konya-Karaman-Ulukışla-Mersin High Speed Railway Project (L:341 km)
7. Bandırma-İzmir High Speed Railway Project (L:245 km)
8. Bandırma-Bursa High Speed Railway Project (L:186 km)
9. Yerköy-Şefaatli-Kayseri High Speed Railway Project (L:142 km)
10. Kırıkkale-Çorum-Samsun High Speed Railway Project (L:285 km)
11. Trabzon-Erzincan High Speed Railway Line Project (L:337 km)
12. Sincan-Çayırhan-İstanbul High Speed Railway Project (L:409 km)
13. Antalya-Konya-Aksaray-Nevşehir-Kayseri High Speed Railway Project (L: 550 km)
Total Length: 4955 km
1. Tekirdağ-Muratlı –Buyukkarıstıran Railway Line (L:48 km)
2. Kemalpaşa OSB Railway Line (L:27,22 km)
3. Kars-Tiflis Railway Line (L:76 km)
4. Adapazarı- Karasu, Ereğli, Bartın Port Railway Line (L:285 km)
5. Samsun -Çarşamba-Terme-Ünye-Fatsa Railway Line (L:102,3km)
6. Toprakkale-Habur Railway Line (L:731 km)
7. Aydın-Çine-Yatağan-Güllük Port Railway Line (L:159 km)
8. Kars-Iğdır-Aralık-Dilucu Railway Line (L:223,6 km)
9. Tokat-Turhal Railway Line (L:42 km)
10. Kırşehir- Yerköy Railway Line (L:90 km)
CONVENTIONAL
11. Van Lake North Pass Railway Line (L:237 km)
12. Şanlıurfa-Mürşitpınar Railway Line (L:63 km)
13. Kars-Çıldır-Ardahan Railway Line (L:67 km)
14. Erzincan-Muş Railway Line (L:210 km)
15. Erzincan-Diyarbakır-Mardin Railway Line (L:500 km)
16. Diyarbakır-Urfa Railway Line (L:250 km)
17. Kemalpaşa-Torbalı ve Alsancak Ports Railway Link (L:70 km)
18. Displacement of Sinan-Batman Railway Line (L:6,5 km)
19. Kırşehir-Aksaray-Ulukışla Railway Line (L:220 km)
Total Length: 3407,62 km
1. Sabiha Gökçen and Atatürk Airports Light Rail Link (L:12,8 km)
2. Çukurova Regional Airport Light Rail Link (L:10km)
Total Length: 22,8 km
LIGHT RAIL LINK
Marmaray Project
REPUBLIC OF TURKEY
MINISTRY OF TRANSPORT AND COMMUNICATIONSGeneral Directorate of Railways, Harbors and Airports
Construction (DLH)
Year 2010 Sarayburnu - Üsküdar
A dream of 150 years
Marmaray Project
Year 1860 Engineer S.Preault Sarayburnu - Üsküdar
The Background (or history)
Year 1902 Strom, Lindman and Hilliker Sarayburnu - Üsküdar
The Marmaray Project
• Total length of Commuter Rail is app. 77 km:– At grade, European side 19.6 km – At grade, Asian side 43.4 km– Bored tunnels 12.2 km– Immersed tube tunnel 1.4 km
From Halkali to Gebze
4 separate Contracts• The Consulting Services (ENG)• The Bosphorus Crossing (BC1)
– Immersed Tube Tunnel under the Bosphorus– Bored Tunnels under the City on both sides– 4 new Stations (Yenikapı, Sirkeci, Uskudar and Kazliçeşme)
• The Upgrading of the Commuter Rail (CR1/CR3)– A third track (for IC and freight) on surface and full upgrading of existing
tracks and Stations– New Signaling, Communication, Fare collection, Operations Control Centre
etc.• New Rolling Stock (CR2)
– 34 set of 10 car and 20 set of 5 car (totally 440 car) trains– their Special Equipment
From Halkali to Gebze
CONTRACTS PRICESConsulting 12.208.901.938
JPYBC1 153.496.046.658
JPYCR2 585.038.104 €
REPUBLIC OF TURKIYEMINISTRY OF TRANSPORT AND COMMUNICATION
DG CONSTRUCTION OF RAILWAYS, PORTS AND AIRPORTS
Ports Sector
ÇANDARLI PORT
Capacities; • Phase I : 2.000.000 TEU/Year• Phase II : 2.000.000 TEU/Year• Total : 4.000.000 TEU/Year• Phase III (with revision): 12.000.000
TEU/Year
FILYOS
RiIVER
FILYOS PORT
Varna
Köstence SivastopolNovorossijsk
Batum
Odessa
m2
FİLYOS
KARADENİZ’DE ÖNEMLİ LİMANLAR
Capacities: 25.000.000 ton/year
MERSIN PORT
Capacites:
12.000.000 TEU/Year
Completed Project (BOT)
Turgutreis Yacht Marina
Didim Yacht Marina
Çeşme Yacht Marina
Sığacık Yacht Marina
Yalova Yacht Marina
Alanya Yacht Marina
Turgutreis Yat Limanı
Çeşme Yat Limanı
Under Constructıon (BOT)
Mersin Yacht Marina
Kaş Yacht Marina
Gazipaşa Yacht Marina
Kumkuyu Yacht Marina
Muğla Ören Yacht Marina
Datça Yacht Marina Dalaman Yacht Marina and
berth for Seabus
Mersin Yat Limanı
Kaş Yat Limanı
Will be tendered (BOT)
İzmir Karaburun Yacht marina
İzmir Yenifoça Yacht marina
Balıkesir Avşa Adası Türkeli Yacht marina
Silivri Yacht marina
Trabzon Yacht marina
İzmir Seferihisar Ürkmez Yacht marina
İzmir Çeşme Şifne Yacht marina
Tekirdağ Yacht marina Trabzon Yat Limanı
REPUBLIC OF TURKIYEMINISTRY OF TRANSPORT AND COMMUNICATION
DG CONSTRUCTION OF RAILWAYS, PORTS AND AIRPORTS
Airport Sector
TO BE TENDERED
3RD AIRPORT OF ISTANBUL (REGIONAL)
Two Independent Runways : 3500x60m. Two Parallel Taxiways : 3500x45m Aprons Superstructures
Planned two Independent Runways : Phase I: A runway 3500x60m. Phase II: two runways 3500x60m. A Parallel Taxiways : 3500x45m Aprons Superstructures
CUKUROVA REGIONAL AIRPORT