2-3 april 2009pds mc rapid-prototyping tools. 2-3 april 2009pds mc rapid-prototyping tools legend:...

3
2-3 April 2009 PDS MC Rapid-prototyping tools Rapid-prototyping tools L egend: Gray – E xisting tool effort; White – Proposed tool effort Note: Asterisk indicates task pulled from E d’ s list. The list contains tool development actively underway from E N and ARC . Tool (* from E d’s list) PD S3 Effort PD S4/PD S2010 Proposed Plan Prototype C andidate Should w ait for PD S4/PD S 2010? Com m ents V olum e(dataset) V alidator* (A RC) Expand to include release? In Beta D ependenton repository/dataset structure in PD S4 standard EN :Y ES EN :The organizational structure ofa data setin PD S 4.0 w illchange. Likew ise, releasestend to vary by node. ThisrequiresPD S-w ide coordination thatm ay m ake it difficultforrapid prototyping. Data productlocation using Google* (A RC)N ote:Ed at O D E reportsnew ODE m akesK M L filesforM ercury, M ars(+M oon) In Beta Migrate EN :Y ES Data Extraction (Table Slicer)* (A RC) In Beta Migrate EN :Y ES Sm allB odies Google-like Search (A RC) In D evelopm ent Migrate EN :Y ES Catalog Ingestion Tool(EN ) In D evelopm ent to im prove catalog ingestion in PD S3 Integrate/upgrade for online capability in PD S 2010 EN :The firstphase ofthe Catalog IngestToolw illbe delivered to EN data engineers in the nextfew w eeks;longer term,itcan be delivered to nodesto stream line catalog ingestion acrossPD S V Tool(EN ) In Production Migrate

Upload: lenard-atkins

Post on 27-Dec-2015

212 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 2-3 April 2009PDS MC Rapid-prototyping tools. 2-3 April 2009PDS MC Rapid-prototyping tools Legend: Gray – Existing tool effort; White – Proposed tool

2-3 April 2009 PDS MC

Rapid-prototyping toolsRapid-prototyping tools

Legend: Gray – Existing tool effort; White – Proposed tool effort Note: Asterisk indicates task pulled from Ed’s list. The list contains tool development actively underway from EN and ARC. Tool (* from Ed’s list)

PDS3 Effort PDS4/PDS2010 Proposed Plan

Prototype Candidate

Should wait for PDS4/PDS 2010?

Comments

Volume (data set) Validator* (ARC) Expand to include release?

In Beta Dependent on repository/dataset structure in PDS4 standard

EN: YES EN: The organizational structure of a data set in PDS 4.0 will change. Likewise, releases tend to vary by node. This requires PDS-wide coordination that may make it difficult for rapid prototyping.

Data product location using Google* (ARC) Note: Ed at ODE reports new ODE makes KML files for Mercury, Mars (+Moon)

In Beta Migrate EN: YES

Data Extraction (Table Slicer)* (ARC)

In Beta Migrate EN: YES

Small Bodies Google-like Search (ARC)

In Development Migrate EN: YES

Catalog Ingestion Tool (EN)

In Development to improve catalog ingestion in PDS3

Integrate/upgrade for online capability in PDS 2010

EN: The first phase of the Catalog Ingest Tool will be delivered to EN data engineers in the next few weeks; longer term, it can be delivered to nodes to streamline catalog ingestion across PDS

VTool (EN)

In Production Migrate

Page 2: 2-3 April 2009PDS MC Rapid-prototyping tools. 2-3 April 2009PDS MC Rapid-prototyping tools Legend: Gray – Existing tool effort; White – Proposed tool

2-3 April 2009 PDS MC

Rapid-prototyping toolsRapid-prototyping tools

Legend: Gray – Existing tool effort; White – Proposed tool effortNote: Asterisk indicates task pulled from Ed’s list.

Tool (* from Ed’s list)PDS3 Effort PDS4/PDS2010

Proposed PlanPrototype Candidate

Should wait for PDS4/PDS 2010?

Comments/Recommendation

World Wide Telescope Product Search*

In Development? EN: YES EN: Not aware of the development status for this effort

Data Submission (web-based)*

Proposed EN: YES EN: Given standards and software services changes for PDS4/PDS 2010, recommend minimal effort on ingestion redesign for PDS3. The catalog ingestion tool under development will provide improvement until then (including some online capabilities).

SPICE Geometry Engine* Proposed EN: YES EN: Recommend this be a PDS 2010 node service that is built using the service standards (e.g., RESTful interfaces, etc).

Data Set Preparation (works with LTDT)*

Proposed See migration note under LTDTool below

EN: Recommend this be a phase II of LTDTool if this is a high priority. However, MC should determine the investment between extensions for PDS3 vs preparing it to be migrated to PDS4.

Data Set Design Workbench (works with LTDT and DSP)*

Proposed See migration note under LTDTool below

EN: Recommend this be a phase II of LTDTool if this is a high priority. However, MC should determine the investment between extensions for PDS3 vs preparing it to be migrated to PDS4.

Page 3: 2-3 April 2009PDS MC Rapid-prototyping tools. 2-3 April 2009PDS MC Rapid-prototyping tools Legend: Gray – Existing tool effort; White – Proposed tool

2-3 April 2009 PDS MC

Rapid-prototyping toolsRapid-prototyping tools

Streamline Archiving Process*

Proposed Replace with online capability in PDS 2010; planned for FY 2010 start per PDS schedule

EN: YES EN: Recommend minimal effort on ingestion redesign for PDS3. The Catalog Ingest Tool will provide a short term improvement in PDS

Metrics Generation #1* (uniform reporting)

Proposed A PDS-wide reporting service is being planned by the distributed infrastructure team (target release: Oct 09)

EN: YES EN: Recommend this become an early deliverable from PDS 2010

Metrics Generation #2*(Node holdings)

Proposed A PDS-wide reporting service is being planned by the distributed infrastructure team (target release: Oct 09)

EN: YES EN: Recommend this become an early deliverable from PDS 2010

PDS 2010 – data format conversion of the fly; online ingestion/visualization*

Proposed Supporting capabilities for online services and ingestion are planned

EN: YES EN: This encompasses several tools and services. Recommend these capabilities be further defined, separated, and delivered as part of PDS 2010

Generalized web-based delivery tracking (missions to PDS) based on existing CATS capability

EN: Proposed Delivery tracking will be part of PDS 2010 so a generic capability could be leveraged

EN: YES EN: This could be a good prototype opportunity. Will need to integrate into tracking in PDS4/PDS 2010