2 21-12 meeting

29
Pinehurst Greens Committee Meeting Tuesday, February 21, 2012

Upload: ssarro

Post on 14-May-2015

268 views

Category:

Sports


2 download

DESCRIPTION

Power point presentation on the February 2012 greens committee meeting for Pinehurst Country Club

TRANSCRIPT

Page 1: 2 21-12 meeting

Pinehurst Greens Committee MeetingTuesday, February 21, 2012

Page 2: 2 21-12 meeting

Pinehurst Country Club Greens Committee Meeting

• Chairperson Report – Erich Tiepel– Update from the Board of Directors and approval of minutes– Master Plan implementation update/plans for 2012

• General Manager’s Report – Cheryl Rook and Loren Pippin• Grounds Report – Steve Sarro

– Dog Policy at Pinehurst Country Club:• Option 1: Denver Police involvement• Option 2: Postings and member/employee policing

– Construction Update:• Current: 5, 9 and 17 tees• Progress/plans for other tees (18, 15)• 9 Hole Diner

– On-course Recycling– DuPont Imprelis update– Water Update: Don DeSchepper and Dr. Paul Motzkus

• Schedule

Page 3: 2 21-12 meeting

Pinehurst Dog PolicyOption 1

Police Involvement:

Pro: Sets an example and precedence

Con: Creates a bad relationship with member or neighbor

Page 4: 2 21-12 meeting

Pinehurst Dog PolicyOption 2

Consistent and Persistent: • Write letter to members and neighbors.• Post letter to message boards in residential communities.• Members and staff police areas throughout each day.• Encourage members to police their own property and not allowdog owners to cut through yards.• Message to members through PCC newsletters, emails, blog, etc.

Page 5: 2 21-12 meeting

Pinehurst Dog Policy

Goose Dogs: Lucy, Cirrus and Mick

Page 6: 2 21-12 meeting

New Projects for 2012

• 9 Tee– New One Cone Tee– Adds 30 Yards

• 17 Tee– New One Cone Tee– Adds 7-10 Yards

• 5 Tee– New One Cone Tee– Adds 10-15 Yards

• Practice Bunker– Lower lip improves visual of shot– Used excess dirt on construction of 9 tee

Page 7: 2 21-12 meeting

Site of new 1 Cone Tee

Page 8: 2 21-12 meeting

Removed three trees and one shrub

Page 9: 2 21-12 meeting

Dirt in place for teeing grounds

Page 10: 2 21-12 meeting

Picture taken at eye-level. The site still needs a couple of more inches of fill. The fairway bunker on the right is currently visible.

Page 11: 2 21-12 meeting

Adding 7-10 yards on this hole

Page 12: 2 21-12 meeting

This is a separate tee, slightly higher in elevation than the tee in front.

Page 13: 2 21-12 meeting

Large mounding from years of sand splashing.Players can not see how the ball releases

from the shot on the green.

Page 14: 2 21-12 meeting

Green sod to be removed and replaced

Sandy soil removed

Page 15: 2 21-12 meeting

Stacked greens sod to be replaced

Page 16: 2 21-12 meeting

Till soil to promote proper rooting and plant health

Page 17: 2 21-12 meeting

Replacing the green

Page 18: 2 21-12 meeting

Sod replaced and new sod from the nurseryto be added in the spring.

Page 19: 2 21-12 meeting

Lowered lip and the green surface can be seen by the golfer.

Page 20: 2 21-12 meeting

Turf cover put on for winter health

Page 21: 2 21-12 meeting

Projects for Consideration

• 18 Tee– Add 10-15 yards– 5:1 slope– Requires 6 feet of walls (or three 2 foot walls)– Aproximate price of project is $17,000

• 15 Tee– Increase up to 30 yards in length– Remove 4,500 cubic yards of material– Estimate is $67,000

Page 22: 2 21-12 meeting

Extensive construction required

1:5 slope attee location

Page 23: 2 21-12 meeting

Requires three 2 foot walls ($10K)

Page 24: 2 21-12 meeting

Tee Renovation$67K from LUI

Page 25: 2 21-12 meeting

Cut and remove 4,500 CY of materialto lower the teeing grounds. Adding

up to 30 yards in length.

Page 26: 2 21-12 meeting

Remove Trip Hazards

Page 27: 2 21-12 meeting

Add dirt to replace asphalt

Page 28: 2 21-12 meeting

Improving our Recycling Efforts At Pinehurst Country Club

Installed at the clubhouse, tennis, pool9 hole diner and 1st tees

(proposed capital)

Installed on every ball washer on 27 holes (black)

Page 29: 2 21-12 meeting

Water Update

• Harriman Reservoir:– Construction has begun– Contract talks have begun

• Ft. Logan Ditch Company Annual Meeting