1st progress meeting eldas the eldorado surface radiation system bart vd hurk & dirk meetschen...

11
1st Progress meeting ELDAS The ELDORADO surface radiation system Bart vd Hurk & Dirk Meetschen et al (see ELDAS web-page)

Upload: carmel-clark

Post on 02-Jan-2016

213 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 1st Progress meeting ELDAS The ELDORADO surface radiation system Bart vd Hurk & Dirk Meetschen et al (see ELDAS web-page)

1st Progress meeting ELDAS

The ELDORADO surface radiation system

Bart vd Hurk & Dirk Meetschen et al

(see ELDAS web-page)

Page 2: 1st Progress meeting ELDAS The ELDORADO surface radiation system Bart vd Hurk & Dirk Meetschen et al (see ELDAS web-page)

1st Progress meeting ELDAS

Principle

• Generating 3-hrly LW & SW surface downward radiative fluxes

• ELDAS grid resolution• Combining METEOSAT data and RT

calculations from the ECMWF model• Simplified data assimilation

technique• Brief verification using routine SW

stations in The Netherlands

Page 3: 1st Progress meeting ELDAS The ELDORADO surface radiation system Bart vd Hurk & Dirk Meetschen et al (see ELDAS web-page)

1st Progress meeting ELDAS

ELDORADO steps (1)1. Create initial field of cloud cover & liquid water

profile• Continuous simulation using LAM version of

ECMWF model at 0.5, started daily from interpolated ECMWF analysis

• Interpolate cloud fields at 3hrly intervals to ELDAS 0.2 grid

2. Create METEOSAT-derived cloud cover field at ELDAS grid

• METCLOCK cloud mask product• Cloud cover = average mask of 53

METEOSAT pixels surrounding target location

Page 4: 1st Progress meeting ELDAS The ELDORADO surface radiation system Bart vd Hurk & Dirk Meetschen et al (see ELDAS web-page)

1st Progress meeting ELDAS

ELDORADO steps (2)3. Create METEOSAT net TOA SW radiation at

ELDAS resolution• Sensor irradiance net TOA flux• Extra time/space/month-dependent

calibration factor, derived from monthly averaged clear sky TOA SW flux generated by LAM6UTC 9UTC 12UTC

Page 5: 1st Progress meeting ELDAS The ELDORADO surface radiation system Bart vd Hurk & Dirk Meetschen et al (see ELDAS web-page)

1st Progress meeting ELDAS

ELDORADO steps (3)4. Reshuffle model columns for relocation of

cloudy/cloud-free atmospheric columns• For each target location, select model

column with the smallest value of:J = a distance + b albedo + c SWnetTOA

5. Adjust total cloud cover to METCLOCK value by scaling cloud cover profile

Cumulative cloud cover

MetClock obs

First guessScaled

scaling factor

heig

ht

Page 6: 1st Progress meeting ELDAS The ELDORADO surface radiation system Bart vd Hurk & Dirk Meetschen et al (see ELDAS web-page)

1st Progress meeting ELDAS

ELDORADO steps (4)6. Adjust liquid water content similarly in

order to match SWnetTOA

• Non-linear relation: 2 iterations applied• Only applied to cloudy model gridpoints

7. Store and interpolate resulting downward LW and SW surface fluxes as best estimate

• When either METCLOCK or SW-obs are absent: use first guess

• Archived METEOSAT/METCLOCK data covers only part of the ELDAS domain

Page 7: 1st Progress meeting ELDAS The ELDORADO surface radiation system Bart vd Hurk & Dirk Meetschen et al (see ELDAS web-page)

1st Progress meeting ELDAS

Total cloud cover

Page 8: 1st Progress meeting ELDAS The ELDORADO surface radiation system Bart vd Hurk & Dirk Meetschen et al (see ELDAS web-page)

1st Progress meeting ELDAS

TOA SWnet

Page 9: 1st Progress meeting ELDAS The ELDORADO surface radiation system Bart vd Hurk & Dirk Meetschen et al (see ELDAS web-page)

1st Progress meeting ELDAS

Surface verification

30 Routine stations in Netherlands

• Only downward shortwave• Daily totals• First guess affected by erroneous daily reset

to cloudfree conditions at 0 UTC: probably little cloud spin-up in morning hours

Page 10: 1st Progress meeting ELDAS The ELDORADO surface radiation system Bart vd Hurk & Dirk Meetschen et al (see ELDAS web-page)

1st Progress meeting ELDAS

Statistics

April/May 2000this dataset:• first guess: 37 W/m2• ELDORADO: 12 W/m2

Bias of ERA40 overSGP ARM observations(April-May 1999):• clear sky: 31 W/m2• overcast: 26 W/m2• all cond.: 17 W/m2

Page 11: 1st Progress meeting ELDAS The ELDORADO surface radiation system Bart vd Hurk & Dirk Meetschen et al (see ELDAS web-page)

1st Progress meeting ELDAS

Still to do

• Further validation– BSRN stations (hardly available via www-

service, but Lindenberg-data are ordered)– Validation plan

• Cleaning the archive– Replace missing time slots by first guess– Fill area outside METEOSAT domain with

first guess

• Interpolation to ELDAS grid