1Second review meeting ITER GOT PPE 07/12/09
TORE SUPRAAssociationEuratom-Cea
Second review meeting EFDA ITER Goal Oriented Training Programme
Port Plug Engineering (PPE)Participants
ITER-PPE training management board
EFDA: Malaquias Artur
CEA: Doceul Louis, Martins Jean-Pierre, Delphine Keller, Salasca Sophie
FZJ : Neubauer Olaf
KIT : Neuberger Heiko (remote) , Scherer Theo (remote)
HAS : Bede Otto
PPE euro-trainees
CEA:Miguel Dapena, Julien Wagrez
FZJ : Romaric Voinchet
KIT : Gaetano Aiello, Zeile Christian
HAS : Nemeth Joszef
Observers
CEA:Commin Lorelei, Madeleine Sylvain
FZJ: Krimmer Andreas
![Page 2: 1Second review meeting ITER GOT PPE07/12/09 TORE SUPRA Association Euratom-Cea Second review meeting EFDA ITER Goal Oriented Training Programme Port Plug](https://reader036.vdocuments.mx/reader036/viewer/2022081811/56649e025503460f94aed5e4/html5/thumbnails/2.jpg)
2Second review meeting ITER GOT PPE 07/12/09
TORE SUPRAAssociationEuratom-Cea
9h welcome coffee
9h30 Status of the PPE program (L. Doceul)
10h00 Work performed in the frame of WP1 (M. Dapena)
10h30 Work performed in the frame of WP2 (J. Wagrez)
11h00 Work performed in the frame of WP3 (G. Aiello)
11h30 Work performed in the frame of WP4 (C. Zeile)
12h Lunch
13h Work performed in the frame of WP5 (J. Németh)
13h30 Work performed in the frame of WP6 (R. Voinchet)
14h Work performed in the frame of EUROBREED program (L. Commin)
14h30 Open discussion on PPE program (sharing, conference, training session,….) (All participants, coffee at 15h included )
15h15 Presentation of Tore-Supra (L. Doceul)
15h30 Visit of Tore-Supra
17h End of Monday meeting
Agenda
![Page 3: 1Second review meeting ITER GOT PPE07/12/09 TORE SUPRA Association Euratom-Cea Second review meeting EFDA ITER Goal Oriented Training Programme Port Plug](https://reader036.vdocuments.mx/reader036/viewer/2022081811/56649e025503460f94aed5e4/html5/thumbnails/3.jpg)
3Second review meeting ITER GOT PPE 07/12/09
TORE SUPRAAssociationEuratom-Cea
Brief recall of the PPE Work Programme:
The thematic of the PPE WP is in the field of Engineering Design and Construction, this training program is associated to the procurement of the ITER Port Plug including: design, structural analysis, neutronics, material requirement, nuclear requirement, safety, manufacturing aspect, assembly aspect, maintainability.
The official starting date of the ITER GOT PPE is 1st september 2008 established for 4 years the first year being devoted to the recruitment of the trainees.
Six work packages of three years duration are identified: 2 CEA, 1 FZJ, 2 KIT, and 1 HAS
The starting date of each work package being the official date of each euro-trainee recruitment.
![Page 4: 1Second review meeting ITER GOT PPE07/12/09 TORE SUPRA Association Euratom-Cea Second review meeting EFDA ITER Goal Oriented Training Programme Port Plug](https://reader036.vdocuments.mx/reader036/viewer/2022081811/56649e025503460f94aed5e4/html5/thumbnails/4.jpg)
4Second review meeting ITER GOT PPE 07/12/09
TORE SUPRAAssociationEuratom-Cea
Work programmes description:
WP1 (CEA) Tutor: Sophie SalascaTrainee: Miguel Dapena
Nuclear Requirements in different phases from the engineering design to decommissioning (particular application on ITER diagnostic port plug equatorial 1)
Starting date: 05/01/09
WP2 (CEA) Tutor: Jean Pierre Martins and Delphine KellerTrainee: Julien Wagrez
Maintainability associated to ITER Component Lifecycle (particular application on ITER diagnostic port plug equatorial 1)
Starting date: 03/06/09
WP3 (KIT) Tutor: Theo SchererTrainee:Gaetano Aiello
Materials, manufacturing and assembly of upper port plug structures (particular application on ITER ECRH upper port plug)
Starting date: 01/09/08
WP4 (KIT) Tutor: Heiko NeubergerTrainee: Christian Zeile
Design, manufacturing and integration of ITER relevant structural components (particular application on ITER TBM equatorial port plug)
Starting date: 05/06/09
WP5 (HAS)Tutor: Otto Bede Trainee: Jozsef Németh
Thermo mechanical Engineering of In-Vessel Components (particular application on ITER diagnostics)
Starting date: 06/07/09
WP6 (FZJ)Tutor: Olaf Neubauer Trainee: Romaric Voinchet
Feasibility of manufacturing in the design of ITER in-vessel components (particular application on ITER CXRS diagnostic port plug)
Starting date:05/01/09
ITER GOT PPE WEBSITE
![Page 5: 1Second review meeting ITER GOT PPE07/12/09 TORE SUPRA Association Euratom-Cea Second review meeting EFDA ITER Goal Oriented Training Programme Port Plug](https://reader036.vdocuments.mx/reader036/viewer/2022081811/56649e025503460f94aed5e4/html5/thumbnails/5.jpg)
5Second review meeting ITER GOT PPE 07/12/09
TORE SUPRAAssociationEuratom-Cea
Trainee sharing:
Sharing between association
To be consolidated at the end of the meeting
Sharing with industrial partner
To be consolidated at the end of the meeting
Course and events :
Table to be discussed
To be consolidated at the end of the meeting
![Page 6: 1Second review meeting ITER GOT PPE07/12/09 TORE SUPRA Association Euratom-Cea Second review meeting EFDA ITER Goal Oriented Training Programme Port Plug](https://reader036.vdocuments.mx/reader036/viewer/2022081811/56649e025503460f94aed5e4/html5/thumbnails/6.jpg)
6Second review meeting ITER GOT PPE 07/12/09
TORE SUPRAAssociationEuratom-Cea
Deliverable
Deliverables description for 2009 :
•All Contract have already started and all the trainees have been recruited during the first year, the ITER GOT PPE training program will run from the 01 September of 2008 to the 07 july of 2012
•First deliverable (3 month) ‘’Personal Career Development Plan’’ (EFDA form to be filled). Completed for each wp
•At the end of 2009, progress report are required (progress made, activity status, skill obtained, corrective action if any, …) See EFDA recommendations
EFDA recommendations:
•For this meeting one shall discuss the deliverables on the Task Agreement and produce the minutes (this is responsibility of the leading Association).
•For later a detailed report is due (by January or beginning of February 2010) which is a gathering of the individual reports from the associations and a summary report from the leading association mentioning the activities performed and the relation between the due deliverables and expenditures at date.
•A template will be sent later as EFDA is preparing one possible format at the moment.
TASK AGREEMENT WP08-GOT-ITER_PPE
![Page 7: 1Second review meeting ITER GOT PPE07/12/09 TORE SUPRA Association Euratom-Cea Second review meeting EFDA ITER Goal Oriented Training Programme Port Plug](https://reader036.vdocuments.mx/reader036/viewer/2022081811/56649e025503460f94aed5e4/html5/thumbnails/7.jpg)
7Second review meeting ITER GOT PPE 07/12/09
TORE SUPRAAssociationEuratom-Cea
Training on Nuclear engineeringDates: From Tuesday 8/12/09 to Friday 11/12/09
Location: Cadarache Training Building n°143
Training organisation: AREVA TA
Objectives: Understanding the basic nuclear phenomena, radiation protection, safety and approach the
specificities of a basic nuclear installation. Program:
Tuesday
Presentation of the training on nuclear engineering and its objectives
Nuclear physics: (Neutronics, Fission/fusion reaction, particle, matter interaction)
Wednesday
Radiological risk
General rules on radiation protection
Risk prevention and protection rules
The ALARA principle: design and operating applications
Thursday
Review of the french approach to nuclear safety
Visit of nuclear installations on the AREVA TA site: RNG reactor and associated installations
Friday
Review of safety objectives of ITER
Visit of nuclear installations on the CEA/Cadarache site: BNI LECA/STAR
Course overview and debriefing