1second review meeting iter got ppe07/12/09 tore supra association euratom-cea second review meeting...

7
1 Second review meeting ITER GOT PPE 07/12/09 TORE SUPRA Association Euratom-Cea Second review meeting EFDA ITER Goal Oriented Training Programme Port Plug Engineering (PPE) Participants ITER-PPE training management board EFDA: Malaquias Artur CEA: Doceul Louis, Martins Jean-Pierre, Delphine Keller, Salasca Sophie FZJ : Neubauer Olaf KIT : Neuberger Heiko (remote) , Scherer Theo (remote) HAS : Bede Otto PPE euro-trainees CEA:Miguel Dapena, Julien Wagrez FZJ : Romaric Voinchet KIT : Gaetano Aiello, Zeile Christian HAS : Nemeth Joszef Observers CEA:Commin Lorelei, Madeleine Sylvain FZJ: Krimmer Andreas

Upload: baldwin-boone

Post on 25-Dec-2015

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1Second review meeting ITER GOT PPE07/12/09 TORE SUPRA Association Euratom-Cea Second review meeting EFDA ITER Goal Oriented Training Programme Port Plug

1Second review meeting ITER GOT PPE 07/12/09

TORE SUPRAAssociationEuratom-Cea

Second review meeting EFDA ITER Goal Oriented Training Programme

Port Plug Engineering (PPE)Participants

ITER-PPE training management board

EFDA: Malaquias Artur

CEA: Doceul Louis, Martins Jean-Pierre, Delphine Keller, Salasca Sophie

FZJ : Neubauer Olaf

KIT : Neuberger Heiko (remote) , Scherer Theo (remote)

HAS : Bede Otto

PPE euro-trainees

CEA:Miguel Dapena, Julien Wagrez

FZJ : Romaric Voinchet

KIT : Gaetano Aiello, Zeile Christian

HAS : Nemeth Joszef

Observers

CEA:Commin Lorelei, Madeleine Sylvain

FZJ: Krimmer Andreas

Page 2: 1Second review meeting ITER GOT PPE07/12/09 TORE SUPRA Association Euratom-Cea Second review meeting EFDA ITER Goal Oriented Training Programme Port Plug

2Second review meeting ITER GOT PPE 07/12/09

TORE SUPRAAssociationEuratom-Cea

9h welcome coffee

9h30 Status of the PPE program (L. Doceul)

10h00 Work performed in the frame of WP1 (M. Dapena)

10h30 Work performed in the frame of WP2 (J. Wagrez)

11h00 Work performed in the frame of WP3 (G. Aiello)

11h30 Work performed in the frame of WP4 (C. Zeile)

12h Lunch

13h Work performed in the frame of WP5 (J. Németh)

13h30 Work performed in the frame of WP6 (R. Voinchet)

14h Work performed in the frame of EUROBREED program (L. Commin)

14h30 Open discussion on PPE program (sharing, conference, training session,….) (All participants, coffee at 15h included )

15h15 Presentation of Tore-Supra (L. Doceul)

15h30 Visit of Tore-Supra

17h End of Monday meeting

Agenda

Page 3: 1Second review meeting ITER GOT PPE07/12/09 TORE SUPRA Association Euratom-Cea Second review meeting EFDA ITER Goal Oriented Training Programme Port Plug

3Second review meeting ITER GOT PPE 07/12/09

TORE SUPRAAssociationEuratom-Cea

Brief recall of the PPE Work Programme:

The thematic of the PPE WP is in the field of Engineering Design and Construction, this training program is associated to the procurement of the ITER Port Plug including: design, structural analysis, neutronics, material requirement, nuclear requirement, safety, manufacturing aspect, assembly aspect, maintainability.

The official starting date of the ITER GOT PPE is 1st september 2008 established for 4 years the first year being devoted to the recruitment of the trainees.

Six work packages of three years duration are identified: 2 CEA, 1 FZJ, 2 KIT, and 1 HAS

The starting date of each work package being the official date of each euro-trainee recruitment.

Page 4: 1Second review meeting ITER GOT PPE07/12/09 TORE SUPRA Association Euratom-Cea Second review meeting EFDA ITER Goal Oriented Training Programme Port Plug

4Second review meeting ITER GOT PPE 07/12/09

TORE SUPRAAssociationEuratom-Cea

Work programmes description:

WP1 (CEA) Tutor: Sophie SalascaTrainee: Miguel Dapena

Nuclear Requirements in different phases from the engineering design to decommissioning (particular application on ITER diagnostic port plug equatorial 1)

Starting date: 05/01/09

WP2 (CEA) Tutor: Jean Pierre Martins and Delphine KellerTrainee: Julien Wagrez

Maintainability associated to ITER Component Lifecycle (particular application on ITER diagnostic port plug equatorial 1)

Starting date: 03/06/09

WP3 (KIT) Tutor: Theo SchererTrainee:Gaetano Aiello

Materials, manufacturing and assembly of upper port plug structures (particular application on ITER ECRH upper port plug)

Starting date: 01/09/08

WP4 (KIT) Tutor: Heiko NeubergerTrainee: Christian Zeile

Design, manufacturing and integration of ITER relevant structural components (particular application on ITER TBM equatorial port plug)

Starting date: 05/06/09

 WP5 (HAS)Tutor: Otto Bede Trainee: Jozsef  Németh

Thermo mechanical Engineering of In-Vessel Components (particular application on ITER diagnostics)

Starting date: 06/07/09

WP6 (FZJ)Tutor: Olaf Neubauer Trainee: Romaric Voinchet

Feasibility of manufacturing in the design of ITER in-vessel components (particular application on ITER CXRS diagnostic port plug)

Starting date:05/01/09

ITER GOT PPE WEBSITE

Page 5: 1Second review meeting ITER GOT PPE07/12/09 TORE SUPRA Association Euratom-Cea Second review meeting EFDA ITER Goal Oriented Training Programme Port Plug

5Second review meeting ITER GOT PPE 07/12/09

TORE SUPRAAssociationEuratom-Cea

Trainee sharing:

Sharing between association

To be consolidated at the end of the meeting

Sharing with industrial partner

To be consolidated at the end of the meeting

Course and events :

Table to be discussed

To be consolidated at the end of the meeting

Page 6: 1Second review meeting ITER GOT PPE07/12/09 TORE SUPRA Association Euratom-Cea Second review meeting EFDA ITER Goal Oriented Training Programme Port Plug

6Second review meeting ITER GOT PPE 07/12/09

TORE SUPRAAssociationEuratom-Cea

Deliverable

Deliverables description for 2009 :

•All Contract have already started and all the trainees have been recruited during the first year, the ITER GOT PPE training program will run from the 01 September of 2008 to the 07 july of 2012

•First deliverable (3 month) ‘’Personal Career Development Plan’’ (EFDA form to be filled). Completed for each wp

•At the end of 2009, progress report are required (progress made, activity status, skill obtained, corrective action if any, …) See EFDA recommendations

EFDA recommendations:

•For this meeting one shall discuss the deliverables on the Task Agreement and produce the minutes (this is responsibility of the leading Association).

•For later a detailed report is due (by January or beginning of February 2010) which is a gathering of the individual reports from the associations and a summary report from the leading association mentioning the activities performed and the relation between the due deliverables and expenditures at date.

•A template will be sent later as EFDA is preparing one possible format at the moment.

TASK AGREEMENT WP08-GOT-ITER_PPE

Page 7: 1Second review meeting ITER GOT PPE07/12/09 TORE SUPRA Association Euratom-Cea Second review meeting EFDA ITER Goal Oriented Training Programme Port Plug

7Second review meeting ITER GOT PPE 07/12/09

TORE SUPRAAssociationEuratom-Cea

Training on Nuclear engineeringDates: From Tuesday 8/12/09 to Friday 11/12/09

Location: Cadarache Training Building n°143

Training organisation: AREVA TA

Objectives: Understanding the basic nuclear phenomena, radiation protection, safety and approach the

specificities of a basic nuclear installation. Program:

Tuesday

            Presentation of the training on nuclear engineering and its objectives

            Nuclear physics: (Neutronics, Fission/fusion reaction, particle, matter interaction)

Wednesday

            Radiological risk

            General rules on radiation protection

            Risk prevention and protection rules

            The ALARA principle: design and operating applications

Thursday

            Review of the french approach to nuclear safety

            Visit of nuclear installations on the AREVA TA site: RNG reactor and associated installations

Friday

            Review of safety objectives of ITER

            Visit of nuclear installations on the CEA/Cadarache site: BNI LECA/STAR

            Course overview and debriefing