1jd e01 6103 a temporary cofferdam - slurry wall paneling - western and downstream dykes- 250 y12
DESCRIPTION
Temporary CofferdamTRANSCRIPT
-
2.80
2.80
OUTE
ROV
ERCU
T
OUTE
ROV
ERCU
T IN
NER
OVER
CUT
INNE
ROV
ERCU
T
Intrado
Extrado
INNER
OVER
CUT
OUTE
ROV
ERCU
T
Theoretical slurry wall axis
431A432
SW10
A433A434A435A436A437A438A439A440A441A442A443A444A445A446A447A448A449A450A451A452A453A454A455A456A457A458A459A460A461A462A463A464A465A466A467A468A469
SW09
376 AC377C378C379C380C381C382C383C384C385C386C387C388C389C390C391C392C393C394C395C396C397C398C399C400C401C402C403C404C405C406C407C408C409C410C411C412C413C414
364 D365366367368369370371372373374375 AAAAAAAAAAA
SW08SW09
376 AC
324
SW07
325 D326 D327 D328 D329 D330 D331 D332 D333 D334 D335 D336 D337 D338 D339 D340 D341 D342 D343 D344 D345 D346 D347 D348 D349 D350 D351 D352 D353 D354 D355 D356 D357 D358 D359 D360 D361 D362 D
R80
R200
R200
R300 R96
R150
SEC. 1SEC. 3
SEC. 4
SEC.
6
SEC.
7
SEC.2
SEC.
8
SEC. 9SEC. 10
SEC. 11
SEC. 12
SEC.
14
SEC.
5
SEC. 13
???????
261262263264265266267268269270271272273274275276277278279280281282283284285286287288289290291292293294295296297298 DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD D 260
SW06
298299300301302303304305306307308309310311312313314315316317318319320321322323324 DDDDDDDDDDDDDDDDDDDDDDDDDDD
SW07
D
362 D363 D364 DA
SW08
C414C415C416C417C418C419C420C421C422C423C424C425C426C427C428C429C430C431A
SW10
A469A470A471A472A473A474A475A476A477A478A479A480A481A482A483A484A485A486A487A488A489A490A491A492
SW11
E530
SW12
E531D
A492E493E494E495E496E497E498E499E500E501E502E503E504E505E506E507E508E509E510E511E512E513E514E515E516E517E518E519E520E521E522E523E524E525E526E527E528E529E530
SW11
SW12
531532533534535536537538539540541542543544545546547548549550551552553554555556557558559560561562563564565566567568569 DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD
569570571572573574575576577578579580581582583584585586587588589590591592593594595596597598599600601602603604605606 DDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDDD
606607608609610611612613614615616617618619620621622623624625626627628629630631632 DDDDDDDDDDDDDDDDDDDDDDDDDDDD001
SW01
? REFERENCE DRAWINGS:- 1JD E01 3004 C TEMPORARY COFFERDAM - GEOMETRICAL DEFINITION
- 1JD K00 0001 A PRELIMINARY GUIDE DRAWING LAYOUT AXIS - 1JD E01 6001 A TEMPORARY COFFERDAM - GUIDE WALL DEFINATION
TYPICAL DETAIL OF OVERCUT
DEVELOPED PLAN VIEW OF SLURRY WALL PANELING FROM SW01 TO SW06
STAR
T
OVER
CUT
TYPE
SW08SW07 DSW07SW06 D
OUTER & INNER OVERCUT
POIN
T
END
POIN
T
SW09SW08 ASW10SW09 CSW11SW10 A
SECTION 8
SECTION 9
SECTION 11
SECTION 12
SECTION 13
SEC.
9101112
OUTE
ROV
ERCU
TMI
N(CM
)
INNE
ROV
ERCU
TMA
X(CM
)
3030303030
313130
3032
LAYOUT VIEW
SECTION 14
8
SW12SW11 ESW01SW12 D
1314
3330 31
33
Name
A
DateRGBS / ABDC Document Review
Checked
Approved
The approval of the drawings will not exonerate the Contractor fromany responsability in connection with the works.
ApprovedAN Approved except as NotedRR Returned for correction and Resubmission
Status of approval
Ref letter number:
Drawing No.:
Date:
Approval Sheet No.:
NEW ASSIUT BARRAGE AND HYDROPOWER PLANTLOT 1 - CIVIL WORKS
Type Scale FormatIssuer
Originator Div Type Element Number Ind
KEY PLAN
EGYPTIAN - FRENCHNEW ASSIUT BARRAGEJOINT VENTURE
StatusAmendmentsReviewedCheckedPreparedDateInd
INTERNATIONALLAHMEYER
in association with:ASSIUT BARRAGE DEVELOPMENT CONSULTANTS (ABDC)
EGYPTIAN - FRENCH NEW ASSIUT BARRAGEJOINT VENTURE
ARAB REPUBLIC OF EGYPTMinistry of Water Resources and IrrigationReservoirs and Grand Barrage Sector (RGBS)
EFNAB
EFNAB
TEMPORARY COFFERDAMSLURRY WALL PANELING
WESTERN & DOWNSTREAM DYKES
Black 1/2000,1/100,1/25 A0
1 J D E 0 1 6 1 0 3 A
A 2012-10-24 A. RENAUX R. JACQUET ROUSSIN FOR APPROVAL APR
SECTION 10