1992_sondir pondok cabe udik tangerang selatan
DESCRIPTION
DCCTRANSCRIPT
AGUSTUS 2014
LAPORAN
AKHIR
PEKERJAAN PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM. MODERNHILL, BLOK EI/16, PONDOK CABE UDIK – TANGERANG SELATAN
PT. BAHANA TEHNIK RAYA Topography-Hydrography-Soil Investigation-Drilling- Bore Pile-
Geologi Mapping-Engineering-Construction Telp.84312336, Fax.84309580 Email. [email protected]
BAPAK ADRIN
DAFTAR ISI
PENGANTAR 1
BAB I PENYELIDIKAN TANAH 2
1.1 Program Penyelidikan Tanah di Lapangan 2
1.2 Pengujian Sondir/DCPT 2
1.3 Pengamatan Muka Air Tanah 3
BAB II KONDISI LAPISAN TANAH 4
2.1 Berdasarkan Pengujian Sondir 4
2.2 Muka air Tanah 4
BAB III REKOMENDASI GEOTEKNIK 5
3.1 Daya Dukung Ijin Pondasi Dangkal 5
3.2 Daya Dukung Ijin Pondasi Dalam 5
3.3 Saran dan Analisa 6
LAMPIRAN I. GRAFIK SONDIR/DCPT
LAMPIRAN II. SKETSA LOKASI TITIK PENYELIDIKAN TANAH
LAMPIRAN III. DOKUMENTASI
LAPORAN AKHIR PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM MODERN HILL BLOK E.1/16 PONDOK CABE UDIK, TANGERANG SELATAN
1
LAPORAN AKHIR PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL
DI PERUM MODERN HILL BLOK E.1/16 PONDOK CABE UDIK, TANGERANG SELATAN
PENGANTAR
Laporan ini memaparkan hasil akhir penyelidikan tanah proyek Rumah Tinggal di Perum
Modern Hill Blok E.1/16, Pondok Cabe Udik, Tangerang Selatan. Penyelidikan tanah ini
dilakukan untuk mendapatkan data teknis/parameter tanah yang dapat mewakili kondisi tanah
setempat untuk digunakan didalam perencanaan pondasi.
Ruang lingkup pekerjaan penyelidikan tanah untuk memenuhi tujuan tersebut adalah sebagai
berikut :
1. Melakukan pengujian Dutch Cone Penetrometer Test (DCPT)/Sondir dengan kapasitas
2.5 ton sebanyak 3 (tiga) titik. Percobaan dihentikan bila tahanan konus telah mencapai
200 kg/cm² atau kedalaman pengujian telah mencapai 25.0 meter.
2. Pengamatan muka air tanah pada seluruh titik uji lapangan.
3. Menyusun laporan untuk menyajikan hasil penyelidikan tanah serta diskusi kondisi tanah.
4. Melakukan analisa dan rekomendasi daya dukung ijin pondasi.
LAPORAN AKHIR PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM MODERN HILL BLOK E.1/16 PONDOK CABE UDIK, TANGERANG SELATAN
2
BAB I.
PENYELIDIKAN TANAH
1.1 Program Penyelidikan Tanah di Lapangan
Program penyelidikan tanah yang telah dilakukan meliputi pekerjaan-pekerjaan sebagai berikut :
� Melakukan pengujian sondir di 3 (tiga) titik, yaitu : S-1, S-2, dan S-3.
� Memonitor muka air tanah pada setiap titik sondir.
Seluruh pekerjaan dimulai dan selesai pada tanggal 13 Agustus 2014, dengan ringkasan sebagai
berikut:
Titik Sondir Tanggal Pelaksanaan Kedalaman Maksimum (meter)
S-1 13 Agustus 2014 15.8
S-2 13 Agustus 2014 22.4
S-3 13 Agustus 2014 21.6
1.2 Pengujian Sondir/Dutch Cone Penetration Test
Percobaan ini menggunakan alat sondir tipe Dutch Cone Penetrometer yang dilengkapi dengan
bikonus, dan dipasang diujung pipa sondir. Selama percobaan sondir, alat dipertahankan vertikal
dengan memasang angkur dikaki sondir. Konus kemudian ditekan masuk ke dalam tanah dengan
kecepatan konstan tidak lebih dari 2 cm/dtk.
Konus mempunyai sudut 60 derajat dan luas conenya 10 cm². Pembacaan tekanan konus
dilakukan dengan interval 20 cm yaitu pembacaan tekanan konus dan tekanan total + friksi dari
selimut konus.
Percobaan ini dihentikan jika tahanan konus telah mencapai 200 kg/cm² atau mencapai
kedalaman 25.0 meter. Hasil percobaan dipresentasikan dalam grafik hubungan antara
kedalaman terhadap tahanan konus, tahanan total, dan friction ratio.
LAPORAN AKHIR PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM MODERN HILL BLOK E.1/16 PONDOK CABE UDIK, TANGERANG SELATAN
3
1.3 Pengamatan Muka Air Tanah
Muka air tanah diamati pada semua titik sondir selama penyelidikan lapangan dilakukan.
Kedalaman muka air tanah yang diperoleh pada waktu penyelidikan lapangan diperoleh dalam
waktu yang singkat atau hanya dilakukan pada saat pekerjaan lapangan dilaksanakan, sehingga
perlu dilakukan pengujian lapangan lainnya untuk mendapatkan kedalaman muka air tanah yang
lebih pasti dan stabil.
LAPORAN AKHIR PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM MODERN HILL BLOK E.1/16 PONDOK CABE UDIK, TANGERANG SELATAN
4
BAB II.
KONDISI LAPISAN TANAH
2.1 Berdasarkan Pengujian Sondir
Pengujian sondir dilakukan pada 3 (tiga) titik. Berdasarkan hasil pengujian DCPT / sondir yang
diplot dalam grafik hubungan antara qc (tahanan konus) dan fr (friction ratio) terhadap
kedalaman pengujian, diperoleh data sebagai:
Titik Sondir Kedalaman Pengujian Sondir Nilai Tahanan Konus (qc)
S-1 15.8 250 kg/cm²
S-2 22.4 250 kg/cm²
S-3 21.6 250 kg/cm²
2.2 Muka Air Tanah
Muka air tanah diamati pada semua titik sondir selama penyelidikan lapangan dilakukan. Untuk
mendapatkan muka air tanah yang lebih pasti disarankan untuk melakukan pengujian lapangan
lainnya. Adapun hasil pengamatan dan pengukuran selama pekerjaan lapangan dirangkum
sebagai berikut:
Titik Sondir Kedalaman Muka Air Tanah
S-1 3.0m
S-2 3.0m
S-3 2.0m
LAPORAN AKHIR PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM MODERN HILL BLOK E.1/16 PONDOK CABE UDIK, TANGERANG SELATAN
5
BAB III.
REKOMENDASI GEOTEKNIK
3.1 Daya Dukung Ijin Pondasi Dangkal
Pondasi dangkal dapat digunakan untuk memikul beban rencana struktur ringan. Daya dukung
ijin pondasi dangkal dihitung berdasarkan nilai tanahan konus dengan menggunakan formula
Skempton. Daya dukung ijin pondasi dangkal pada beberapa kedalaman berdasarkan nilai qc
adalah sebagai berikut:
Kedalaman Pondasi Dangkal Daya Dukung Ijin
1.0m 0.20 kg/cm²
2.0m 0.22 kg/cm²
3.0m 0.25 kg/cm²
3.2 Daya Dukung Ijin Pondasi Dalam
Pondasi dalam digunakan jika pondasi dangkal tidak mampu memikul beban struktur yang telah
direncanakan. Pemilihan jenis pondasi dalam yang digunakan tergantung dari faktor lingkungan
di sekitar lokasi proyek, kondisi tanah, dan faktor ekonomis. Berikut daya dukung ijin pondasi
dalam pada masing-masing titik uji sondir.
a. Daya dukung ijin pondasi dalam pada titik S-1 yang ditempatkan hingga kedalaman
16.0m.
Dimensi Pondasi Dalam Daya Dukung Ijin (ton)
Tiang Pancang Segiempat 20cmx20cm 31
Tiang Pancang Segiempat 25cmx25cm 40
Tiang Pancang Segitiga 28cm 32
Tiang Pancang Segitiga 32cm 37
LAPORAN AKHIR PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM MODERN HILL BLOK E.1/16 PONDOK CABE UDIK, TANGERANG SELATAN
6
Dimensi Pondasi Dalam Daya Dukung Ijin (ton)
Tiang Bor Diameter 30cm 36
Tiang Bor Diameter 40cm 51
Tiang Bor Diameter 50cm 68
Tiang Bor Diameter 60cm 85
b. Daya dukung ijin pondasi dalam pada titik S-2 dan S-3 yang ditempatkan hingga
kedalaman 22.0m.
Dimensi Pondasi Dalam Daya Dukung Ijin (ton)
Tiang Pancang Segiempat 20cmx20cm 50
Tiang Pancang Segiempat 25cmx25cm 63
Tiang Pancang Segitiga 28cm 51
Tiang Pancang Segitiga 32cm 59
Dimensi Pondasi Dalam Daya Dukung Ijin (ton)
Tiang Bor Diameter 30cm 56
Tiang Bor Diameter 40cm 78
Tiang Bor Diameter 50cm 100
Tiang Bor Diameter 60cm 125
3.3 Saran dan Analisa
• Pada pelaksanaan pekerjaan pondasi dalam disarankan untuk melakukan pengujian beban
statis (static loading test) atau uji beban lainnya dengan beban uji 2x beban rencana.
Pengujian ini akan menghasilkan daya dukung tiang tunggal yang lebih optimal dan
besarnya penurunan yang terjadi akibat uji pembebanan.
• Permasalahan yang timbul dalam pelaksanaan konstruksi pondasi dalam baik tiang
pancang sangat mempengaruhi perilaku pondasi tiang dalam dan daya dukung ijinnya,
sehingga perlu dilakukan Quality Control yang baik.
LAPORAN AKHIR PENYELIDIKAN TANAH PROYEK RUMAH TINGGAL DI PERUM MODERN HILL BLOK E.1/16 PONDOK CABE UDIK, TANGERANG SELATAN
7
• Pengujian sondir yang dilakukan pada lokasi ini, hanya dapat memperkirakan kedalaman
lapisan tanah keras sesuai dengan kapasitas dan kemampuan alat sondir. Sedangkan
untuk ketebalan lapisan tanah keras yang dianggap cukup untuk memikul beban yang
direncanakan tidak dapat diperoleh melalui pengujian sondir. Untuk mendapatkan hasil
dan gambaran profil tanah yang lebih baik dan pasti maka disarankan untuk melakukan
pengeboran dalam (deep boring) dan pengujian Standard Penetration Test (SPT).
Demikian laporan akhir penyelidikan tanah ini disampaikan. Atas kerjasama dan kepercayaan
yang telah diberikan, kami ucapkan terima kasih. Grafik, gambar, dan tabel melengkapi laporan
ini.
Jakarta, 15 Agustus 2014
Hormat Kami,
PT. BAHANA TEHNIK RAYA
Darmawan
(Direktur)
S2
10 M
10 M
10 M
S3 10 M S1
SKETSA TITIK SONDIR
LAPORAN AKHIR PENYELIDIKAN TANAH
PROYEK RUMAH TINGGAL
DI PERUM MODERN HILL BLOK E.1/16
PONDOK CABE UDIK, TANGERANG SELATAN
LAMPIRAN I.
GRAFIK SONDIR/DCPT
Project RUMAH TINGGAL Operator Lasimin
Location Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang Selatan Checked By DRMDate 13-Aug-14 GWL 3.0 meterTest No. S-1
Kedalaman Pembacaan Konus (R1)
Jumlah Perlawanan
(R2)
Perlawanan Gesek
Lokal Friksi Total Friksi Friksi Ratio
meter kg/cm² kg/cm² kg/cm² kg/cm² kg/cm %
0.00 0 0 0 0 0 0
0.20 15 20 5 0.42 8.3 0.00
0.40 18 22 4 0.33 15.0 1.85
0.60 16 18 2 0.17 18.3 1.04
0.80 20 25 5 0.42 26.7 2.08
1.00 15 20 5 0.42 35.0 2.78
1.20 25 30 5 0.42 43.3 1.67
1.40 16 18 2 0.17 46.7 1.04
1.60 8 14 6 0.50 56.7 6.25
1.80 10 15 5 0.42 65.0 4.17
2.00 5 10 5 0.42 73.3 8.33
2.20 4 8 4 0.33 80.0 8.33
2.40 8 12 4 0.33 86.7 4.17
2.60 12 16 4 0.33 93.3 2.78
2.80 15 20 5 0.42 101.7 2.78
3.00 5 10 5 0.42 110.0 8.33
3.20 14 16 2 0.17 113.3 1.19
3.40 8 12 4 0.33 120.0 4.17
3.60 18 27 9 0.75 135.0 4.17
3.80 14 18 4 0.33 141.7 2.38
4.00 10 15 5 0.42 150.0 4.17
4.20 4 8 4 0.33 156.7 8.33
4.40 8 12 4 0.33 163.3 4.17
4.60 8 12 4 0.33 170.0 4.17
4.80 12 16 4 0.33 176.7 2.78
5.00 8 12 4 0.33 183.3 4.17
5.20 15 30 15 1.25 208.3 8.33
5.40 18 22 4 0.33 215.0 1.85
5.60 20 25 5 0.42 223.3 2.08
5.80 14 18 4 0.33 230.0 2.38
6.00 10 15 5 0.42 238.3 4.17
6.20 5 10 5 0.42 246.7 8.33
6.40 8 12 4 0.33 253.3 4.17
6.60 12 16 4 0.33 260.0 2.78
6.80 30 40 10 0.83 276.7 2.78
7.00 20 30 10 0.83 293.3 4.17
7.20 15 30 15 1.25 318.3 8.33
7.40 30 40 10 0.83 335.0 2.78
7.60 40 50 10 0.83 351.7 2.08
7.80 30 40 10 0.83 368.3 2.78
8.00 60 70 10 0.83 385.0 1.39
8.20 40 50 10 0.83 401.7 2.08
8.40 40 50 10 0.83 418.3 2.08
8.60 45 65 20 1.67 451.7 3.70
8.80 70 80 10 0.83 468.3 1.19
9.00 50 60 10 0.83 485.0 1.67
9.20 40 50 10 0.83 501.7 2.08
9.40 25 30 5 0.42 510.0 1.67
9.60 50 60 10 0.83 526.7 1.67
9.80 30 45 15 1.25 551.7 4.17
10.00 40 50 10 0.83 568.3 2.08
Page 1 from 2
DATA PENYELIDIKAN LAPANGANPENGUJIAN DUCTH CONE PENETROMETER TEST/SONDIR
Keterangan
Proyek RUMAH TINGGAL Operator LasiminLokasi Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang Selatan Checked By DRMTanggal 13-Aug-14 MAT 3.0 meterTitik No. S-1
Kedalaman Pembacaan Konus (R1)
Jumlah Perlawanan
(R2)
Perlawanan Gesek
Lokal Friksi Total Friksi Friksi Ratio
meter kg/cm² kg/cm² kg/cm² kg/cm² kg/cm %
10.00 40 50 10 0.83 568.3 2.08
10.20 60 70 10 0.83 601.7 1.39
10.40 57 65 8 0.67 615.0 1.17
10.60 30 40 10 0.83 631.7 2.78
10.80 60 75 15 1.25 656.7 2.08
11.00 80 90 10 0.83 673.3 1.04
11.20 70 80 10 0.83 690.0 1.19
11.40 70 80 10 0.83 706.7 1.19
11.60 45 65 20 1.67 740.0 3.70
11.80 80 90 10 0.83 756.7 1.04
12.00 105 120 15 1.25 781.7 1.19
12.20 90 110 20 1.67 815.0 1.85
12.40 120 130 10 0.83 831.7 0.69
12.60 135 145 10 0.83 848.3 0.62
12.80 140 150 10 0.83 865.0 0.60
13.00 140 150 10 0.83 881.7 0.60
13.20 150 160 10 0.83 898.3 0.56
13.40 155 165 10 0.83 915.0 0.54
13.60 140 150 10 0.83 931.7 0.60
13.80 130 140 10 0.83 948.3 0.64
14.00 130 140 10 0.83 965.0 0.64
14.20 135 145 10 0.83 981.7 0.62
14.40 130 140 10 0.83 998.3 0.64
14.60 120 130 10 0.83 1015.0 0.69
14.80 150 160 10 0.83 1031.7 0.56
15.00 160 170 10 0.83 1048.3 0.52
15.20 170 180 10 0.83 1065.0 0.49
15.40 195 205 10 0.83 1081.7 0.43
15.60 210 235 25 2.08 1123.3 0.99
15.80 250 250 0 0.00 1123.3 0.00
Page 2 from 2
DATA PENYELIDIKAN LAPANGANPENGUJIAN DUCTH CONE PENETROMETER TEST/SONDIR
Keterangan
PT. BAHANA TEHNIK RAYA
Test No.
S-1Project : RUMAH TINGGAL X :Location : Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang SelatanY :Date : Z :Operator : Capacity : 2.5 tonfChecked By : GWL : 3.0 meter
DUTCH CONE PENETROMETER TEST/SONDIR
DRMLasimin13-Aug-14
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
0 50 100 150 200 250 300
Dep
th (m
eter
)
qc (kg/cm²) tf/10 (kg/cm)
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
0 2 4 6 8 10 12
Dep
th (m
eter
)
FR (%)
LAPORAN AKHIR PENYELIDIKAN TANAH
PROYEK RUMAH TINGGAL
DI PERUM MODERN HILL BLOK E.1/16
PONDOK CABE UDIK, TANGERANG SELATAN
LAMPIRAN II.
SKETSA LOKASI TITIK
PENYELIDIKAN TANAH
Project RUMAH TINGGAL Operator Lasimin
Location Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang Selatan Checked By DRMDate 13-Aug-14 GWL 3.0 meterTest No. S-2
Kedalaman Pembacaan Konus (R1)
Jumlah Perlawanan
(R2)
Perlawanan Gesek
Lokal Friksi Total Friksi Friksi Ratio
meter kg/cm² kg/cm² kg/cm² kg/cm² kg/cm %
0.00 0 0 0 0 0 0
0.20 5 10 5 0.42 8.3 0.00
0.40 4 8 4 0.33 15.0 8.33
0.60 16 18 2 0.17 18.3 1.04
0.80 18 22 4 0.33 25.0 1.85
1.00 4 8 4 0.33 31.7 8.33
1.20 4 8 4 0.33 38.3 8.33
1.40 10 15 5 0.42 46.7 4.17
1.60 15 20 5 0.42 55.0 2.78
1.80 14 18 4 0.33 61.7 2.38
2.00 5 10 5 0.42 70.0 8.33
2.20 2 4 2 0.17 73.3 8.33
2.40 2 4 2 0.17 76.7 8.33
2.60 5 10 5 0.42 85.0 8.33
2.80 4 8 4 0.33 91.7 8.33
3.00 5 10 5 0.42 100.0 8.33
3.20 12 16 4 0.33 106.7 2.78
3.40 5 10 5 0.42 115.0 8.33
3.60 10 15 5 0.42 123.3 4.17
3.80 10 15 5 0.42 131.7 4.17
4.00 4 8 4 0.33 138.3 8.33
4.20 18 22 4 0.33 145.0 1.85
4.40 14 16 2 0.17 148.3 1.19
4.60 4 8 4 0.33 155.0 8.33
4.80 4 8 4 0.33 161.7 8.33
5.00 12 16 4 0.33 168.3 2.78
5.20 25 30 5 0.42 176.7 1.67
5.40 23 26 3 0.25 181.7 1.09
5.60 18 22 4 0.33 188.3 1.85
5.80 20 25 5 0.42 196.7 2.08
6.00 20 25 5 0.42 205.0 2.08
6.20 50 60 10 0.83 221.7 1.67
6.40 30 40 10 0.83 238.3 2.78
6.60 20 25 5 0.42 246.7 2.08
6.80 25 30 5 0.42 255.0 1.67
7.00 10 15 5 0.42 263.3 4.17
7.20 40 50 10 0.83 280.0 2.08
7.40 30 40 10 0.83 296.7 2.78
7.60 22 26 4 0.33 303.3 1.52
7.80 25 30 5 0.42 311.7 1.67
8.00 40 50 10 0.83 328.3 2.08
8.20 25 35 10 0.83 345.0 3.33
8.40 20 25 5 0.42 353.3 2.08
8.60 35 45 10 0.83 370.0 2.38
8.80 50 60 10 0.83 386.7 1.67
9.00 50 60 10 0.83 403.3 1.67
9.20 60 70 10 0.83 420.0 1.39
9.40 50 60 10 0.83 436.7 1.67
9.60 45 65 20 1.67 470.0 3.70
9.80 70 80 10 0.83 486.7 1.19
10.00 40 50 10 0.83 503.3 2.08
Page 1 from 3
DATA PENYELIDIKAN LAPANGANPENGUJIAN DUCTH CONE PENETROMETER TEST/SONDIR
Keterangan
Proyek RUMAH TINGGAL Operator LasiminLokasi Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang Selatan Checked By DRMTanggal 13-Aug-14 MAT 3.0 meterTitik No. S-2
Kedalaman Pembacaan Konus (R1)
Jumlah Perlawanan
(R2)
Perlawanan Gesek
Lokal Friksi Total Friksi Friksi Ratio
meter kg/cm² kg/cm² kg/cm² kg/cm² kg/cm %
10.00 40 50 10 0.83 503.3 2.08
10.20 40 50 10 0.83 536.7 2.08
10.40 35 45 10 0.83 553.3 2.38
10.60 50 60 10 0.83 570.0 1.67
10.80 30 40 10 0.83 586.7 2.78
11.00 50 60 10 0.83 603.3 1.67
11.20 55 75 20 1.67 636.7 3.03
11.40 80 90 10 0.83 653.3 1.04
11.60 60 70 10 0.83 670.0 1.39
11.80 50 60 10 0.83 686.7 1.67
12.00 60 70 10 0.83 703.3 1.39
12.20 50 60 10 0.83 720.0 1.67
12.40 25 40 15 1.25 745.0 5.00
12.60 45 65 20 1.67 778.3 3.70
12.80 70 80 10 0.83 795.0 1.19
13.00 65 75 10 0.83 811.7 1.28
13.20 40 50 10 0.83 828.3 2.08
13.40 30 40 10 0.83 845.0 2.78
13.60 35 55 20 1.67 878.3 4.76
13.80 60 70 10 0.83 895.0 1.39
14.00 45 65 20 1.67 928.3 3.70
14.20 70 80 10 0.83 945.0 1.19
14.40 50 60 10 0.83 961.7 1.67
14.60 35 55 20 1.67 995.0 4.76
14.80 60 70 10 0.83 1011.7 1.39
15.00 60 70 10 0.83 1028.3 1.39
15.20 55 75 20 1.67 1061.7 3.03
15.40 65 80 15 1.25 1086.7 1.92
15.60 45 65 20 1.67 1120.0 3.70
15.80 60 70 10 0.83 1136.7 1.39
16.00 65 85 20 1.67 1170.0 2.56
16.20 70 80 10 0.83 1186.7 1.19
16.40 100 110 10 0.83 1203.3 0.83
16.60 60 70 10 0.83 1220.0 1.39
16.80 80 90 10 0.83 1236.7 1.04
17.00 105 120 15 1.25 1261.7 1.19
17.20 130 140 10 0.83 1278.3 0.64
17.40 90 110 20 1.67 1311.7 1.85
17.60 80 105 25 2.08 1353.3 2.60
17.80 115 125 10 0.83 1370.0 0.72
18.00 80 90 10 0.83 1386.7 1.04
18.20 120 130 10 0.83 1403.3 0.69
18.40 120 130 10 0.83 1420.0 0.69
18.60 130 145 15 1.25 1445.0 0.96
18.80 105 120 15 1.25 1470.0 1.19
19.00 105 120 15 1.25 1495.0 1.19
19.20 90 105 15 1.25 1520.0 1.39
19.40 105 120 15 1.25 1545.0 1.19
19.60 125 145 20 1.67 1578.3 1.33
19.80 105 120 15 1.25 1603.3 1.19
20.00 130 140 10 0.83 1620.0 0.64
Page 2 from 3
DATA PENYELIDIKAN LAPANGANPENGUJIAN DUCTH CONE PENETROMETER TEST/SONDIR
Keterangan
Project RUMAH TINGGAL Operator LasiminLocation Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang Selatan Checked By DRMDate 13-Aug-14 GWL 3.0 meterTest No. S-2
Kedalaman Pembacaan Konus (R1)
Jumlah Perlawanan
(R2)
Perlawanan Gesek
Lokal Friksi Total Friksi Friksi Ratio
meter kg/cm² kg/cm² kg/cm² kg/cm² kg/cm %
20.00 130 140 10 0.83 1,620.0 0.64
20.20 105 115 10 0.83 1653.3 0.79
20.40 95 105 10 0.83 1670.0 0.88
20.60 115 135 20 1.67 1703.3 1.45
20.80 105 120 15 1.25 1728.3 1.19
21.00 115 135 20 1.67 1761.7 1.45
21.20 130 145 15 1.25 1786.7 0.96
21.40 150 165 15 1.25 1811.7 0.83
21.60 160 180 20 1.67 1845.0 1.04
21.80 175 200 25 2.08 1886.7 1.19
22.00 195 215 20 1.67 1920.0 0.85
22.20 230 245 15 1.25 1945.0 0.54
22.40 250 250 0 0.00 1945.0 0.00
Halaman 3 dari 3
DATA PENYELIDIKAN LAPANGANPENGUJIAN DUCTH CONE PENETROMETER TEST/SONDIR
Keterangan
PT. BAHANA TEHNIK RAYA
Test No.
S-2Project : RUMAH TINGGAL X :Location : Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang SelatanY :Date : Z :Operator : Capacity : 2.5 tonfChecked By : GWL : 3.0 meter
DUTCH CONE PENETROMETER TEST/SONDIR
DRMLasimin13-Aug-14
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
0 50 100 150 200 250 300
Dep
th (m
eter
)
qc (kg/cm²) tf/10 (kg/cm)
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
0 2 4 6 8 10 12
Dep
th (m
eter
)
FR (%)
LAPORAN AKHIR PENYELIDIKAN TANAH
PROYEK RUMAH TINGGAL
DI PERUM MODERN HILL BLOK E.1/16
PONDOK CABE UDIK, TANGERANG SELATAN
LAMPIRAN III.
DOKUMENTASI
Project RUMAH TINGGAL Operator Lasimin
Location Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang Selatan Checked By DRMDate 13-Aug-14 GWL 2.0 meterTest No. S-3
Kedalaman Pembacaan Konus (R1)
Jumlah Perlawanan
(R2)
Perlawanan Gesek
Lokal Friksi Total Friksi Friksi Ratio
meter kg/cm² kg/cm² kg/cm² kg/cm² kg/cm %
0.00 0 0 0 0 0 0
0.20 5 10 5 0.42 8.3 0.00
0.40 3 6 3 0.25 13.3 8.33
0.60 3 6 3 0.25 18.3 8.33
0.80 4 8 4 0.33 25.0 8.33
1.00 8 12 4 0.33 31.7 4.17
1.20 10 15 5 0.42 40.0 4.17
1.40 5 10 5 0.42 48.3 8.33
1.60 5 10 5 0.42 56.7 8.33
1.80 16 18 2 0.17 60.0 1.04
2.00 8 12 4 0.33 66.7 4.17
2.20 3 6 3 0.25 71.7 8.33
2.40 2 6 4 0.33 78.3 16.67
2.60 8 12 4 0.33 85.0 4.17
2.80 4 8 4 0.33 91.7 8.33
3.00 5 10 5 0.42 100.0 8.33
3.20 10 15 5 0.42 108.3 4.17
3.40 16 18 2 0.17 111.7 1.04
3.60 8 12 4 0.33 118.3 4.17
3.80 5 10 5 0.42 126.7 8.33
4.00 10 15 5 0.42 135.0 4.17
4.20 15 20 5 0.42 143.3 2.78
4.40 10 15 5 0.42 151.7 4.17
4.60 8 12 4 0.33 158.3 4.17
4.80 16 18 2 0.17 161.7 1.04
5.00 10 15 5 0.42 170.0 4.17
5.20 18 22 4 0.33 176.7 1.85
5.40 10 15 5 0.42 185.0 4.17
5.60 10 15 5 0.42 193.3 4.17
5.80 15 20 5 0.42 201.7 2.78
6.00 25 30 5 0.42 210.0 1.67
6.20 40 50 10 0.83 226.7 2.08
6.40 25 30 5 0.42 235.0 1.67
6.60 20 25 5 0.42 243.3 2.08
6.80 16 18 2 0.17 246.7 1.04
7.00 10 15 5 0.42 255.0 4.17
7.20 60 70 10 0.83 271.7 1.39
7.40 40 50 10 0.83 288.3 2.08
7.60 25 35 10 0.83 305.0 3.33
7.80 15 20 5 0.42 313.3 2.78
8.00 30 40 10 0.83 330.0 2.78
8.20 40 50 10 0.83 346.7 2.08
8.40 25 35 10 0.83 363.3 3.33
8.60 40 50 10 0.83 380.0 2.08
8.80 60 70 10 0.83 396.7 1.39
9.00 30 40 10 0.83 413.3 2.78
9.20 50 60 10 0.83 430.0 1.67
9.40 35 45 10 0.83 446.7 2.38
9.60 60 70 10 0.83 463.3 1.39
9.80 40 50 10 0.83 480.0 2.08
10.00 30 40 10 0.83 496.7 2.78
Page 1 from 3
DATA PENYELIDIKAN LAPANGANPENGUJIAN DUCTH CONE PENETROMETER TEST/SONDIR
Keterangan
Proyek RUMAH TINGGAL Operator LasiminLokasi Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang Selatan Checked By DRMTanggal 13-Aug-14 MAT 2.0 meterTitik No. S-3
Kedalaman Pembacaan Konus (R1)
Jumlah Perlawanan
(R2)
Perlawanan Gesek
Lokal Friksi Total Friksi Friksi Ratio
meter kg/cm² kg/cm² kg/cm² kg/cm² kg/cm %
10.00 30 40 10 0.83 496.7 2.78
10.20 30 40 10 0.83 530.0 2.78
10.40 25 35 10 0.83 546.7 3.33
10.60 40 50 10 0.83 563.3 2.08
10.80 40 50 10 0.83 580.0 2.08
11.00 60 70 10 0.83 596.7 1.39
11.20 80 90 10 0.83 613.3 1.04
11.40 55 65 10 0.83 630.0 1.52
11.60 50 60 10 0.83 646.7 1.67
11.80 65 85 20 1.67 680.0 2.56
12.00 50 60 10 0.83 696.7 1.67
12.20 30 40 10 0.83 713.3 2.78
12.40 45 65 20 1.67 746.7 3.70
12.60 40 50 10 0.83 763.3 2.08
12.80 55 75 20 1.67 796.7 3.03
13.00 40 50 10 0.83 813.3 2.08
13.20 60 75 15 1.25 838.3 2.08
13.40 50 60 10 0.83 855.0 1.67
13.60 25 45 20 1.67 888.3 6.67
13.80 55 70 15 1.25 913.3 2.27
14.00 65 85 20 1.67 946.7 2.56
14.20 50 60 10 0.83 963.3 1.67
14.40 25 45 20 1.67 996.7 6.67
14.60 70 80 10 0.83 1013.3 1.19
14.80 70 80 10 0.83 1030.0 1.19
15.00 50 60 10 0.83 1046.7 1.67
15.20 65 85 20 1.67 1080.0 2.56
15.40 50 60 10 0.83 1096.7 1.67
15.60 25 45 20 1.67 1130.0 6.67
15.80 60 70 10 0.83 1146.7 1.39
16.00 50 60 10 0.83 1163.3 1.67
16.20 65 85 20 1.67 1196.7 2.56
16.40 85 105 20 1.67 1230.0 1.96
16.60 70 80 10 0.83 1246.7 1.19
16.80 45 65 20 1.67 1280.0 3.70
17.00 80 100 20 1.67 1313.3 2.08
17.20 90 115 25 2.08 1355.0 2.31
17.40 120 130 10 0.83 1371.7 0.69
17.60 105 120 15 1.25 1396.7 1.19
17.80 90 105 15 1.25 1421.7 1.39
18.00 85 100 15 1.25 1446.7 1.47
18.20 100 115 15 1.25 1471.7 1.25
18.40 100 115 15 1.25 1496.7 1.25
18.60 110 130 20 1.67 1530.0 1.52
18.80 105 125 20 1.67 1563.3 1.59
19.00 130 140 10 0.83 1580.0 0.64
19.20 105 120 15 1.25 1605.0 1.19
19.40 85 105 20 1.67 1638.3 1.96
19.60 115 125 10 0.83 1655.0 0.72
19.80 130 140 10 0.83 1671.7 0.64
20.00 120 130 10 0.83 1688.3 0.69
Page 2 from 3
DATA PENYELIDIKAN LAPANGANPENGUJIAN DUCTH CONE PENETROMETER TEST/SONDIR
Keterangan
Project RUMAH TINGGAL Operator LasiminLocation Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang Selatan Checked By DRMDate 13-Aug-14 GWL 2.0 meterTest No. S-3
Kedalaman Pembacaan Konus (R1)
Jumlah Perlawanan
(R2)
Perlawanan Gesek
Lokal Friksi Total Friksi Friksi Ratio
meter kg/cm² kg/cm² kg/cm² kg/cm² kg/cm %
20.00 120 130 10 0.83 1,688.3 0.69
20.20 105 120 15 1.25 1730.0 1.19
20.40 95 110 15 1.25 1755.0 1.32
20.60 120 130 10 0.83 1771.7 0.69
20.80 145 160 15 1.25 1796.7 0.86
21.00 165 190 25 2.08 1838.3 1.26
21.20 180 200 20 1.67 1871.7 0.93
21.40 215 240 25 2.08 1913.3 0.97
21.60 250 250 0 0.00 1913.3 0.00
Halaman 3 dari 3
DATA PENYELIDIKAN LAPANGANPENGUJIAN DUCTH CONE PENETROMETER TEST/SONDIR
Keterangan
PT. BAHANA TEHNIK RAYA
Test No.
S-3Project : RUMAH TINGGAL X :Location : Perum. Modernhill, Blok E.1/16, Pondok Cabe Udik, Tangerang SelatanY :Date : Z :Operator : Capacity : 2.5 tonfChecked By : GWL : 2.0 meter
DUTCH CONE PENETROMETER TEST/SONDIR
DRMLasimin13-Aug-14
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
0 50 100 150 200 250 300
Dep
th (m
eter
)
qc (kg/cm²) tf/10 (kg/cm)
0
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
0 2 4 6 8 10 12
Dep
th (m
eter
)
FR (%)
PHOTO KEGIATAN SONDIR (S1)
PHOTO KEGIATAN SONDIR (S2)
PHOTO KEGIATAN SONDIR (S3)