195/210 the study on urgent rehabilitation program … · facility id survey date 2005/05/17 port...

11
THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA 195/210 Sa -04 -001 Location Photos Existing Condition There can not be seen any damages to be pointed out on the upper surface. Due to the chroride attack, appreciable area of cover concrete is spalling down and reiforcing bar is exposed and corroded on the side (encircled part in the photo hereunder). Structural Condition Assessment Grade 2 The facility is in structurally bad condition. It will become the object of rehabilitation plan. Maintenance Record unknown Facility Description Located at the tip of Saco Mar Jetty, the size of 18.05m in length and 17.05m in width It was used as a mooring and breasting dolphin. Connected with the Iron Ore Jetty by pile-supported bridge. Upper structure is made by reiforced concrete. Concrete Deck Slab Year Constructed 1967 Facility ID Survey Date 2005/05/17 Port Name Namibe Saco Mar Category - Port of Namibe -

Upload: others

Post on 06-Aug-2020

3 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 195/210 THE STUDY ON URGENT REHABILITATION PROGRAM … · Facility ID Survey Date 2005/05/17 Port Name Namibe Saco Mar Category - Port of Namibe - THE STUDY ON URGENT REHABILITATION

THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA195/210

Sa -04 -001

Location

Photos

Existing ConditionThere can not be seen any damages to be pointed out on the upper surface.Due to the chroride attack, appreciable area of cover concrete is spalling down and reiforcing bar isexposed and corroded on the side (encircled part in the photo hereunder).

Structural ConditionAssessment

Grade 2

The facility is in structurally bad condition. It will become the object of rehabilitation plan.

Maintenance Record unknown

Facility Description

Located at the tip of Saco Mar Jetty, the size of 18.05m in length and 17.05m in widthIt was used as a mooring and breasting dolphin.Connected with the Iron Ore Jetty by pile-supported bridge.Upper structure is made by reiforced concrete.

Concrete Deck SlabYear Constructed 1967

Facility ID Survey Date 2005/05/17Port Name Namibe Saco Mar Category

- Port of Namibe -

Page 2: 195/210 THE STUDY ON URGENT REHABILITATION PROGRAM … · Facility ID Survey Date 2005/05/17 Port Name Namibe Saco Mar Category - Port of Namibe - THE STUDY ON URGENT REHABILITATION

THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA196/210

Sa -04 -002

Location

Photos

Existing ConditionThere can not be seen any damages to be pointed out on the upper surface.Due to the chroride attack, some cover concrete is spalling down and reiforcing bar is exposed andcorroded on the side (encircled part in the photo hereunder).

Structural ConditionAssessment

Grade 2

The facility is in structurally bad condition. It will become the object of rehabilitation plan.

Maintenance Record unknown

Facility DescriptionThe pile-supported connection bridge with 3.5m in width between Mooring Dolphin andIron Ore Jettty.Upper structure is made by reinforced concrete.

Year Constructed 1967Port Name Namibe Saco Mar Category Concrete Deck SlabFacility ID Survey Date 2005/05/17, 10/17

- Port of Namibe -

Page 3: 195/210 THE STUDY ON URGENT REHABILITATION PROGRAM … · Facility ID Survey Date 2005/05/17 Port Name Namibe Saco Mar Category - Port of Namibe - THE STUDY ON URGENT REHABILITATION

THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA197/210

Sa -04 -003

Location

Photos

Existing Condition There can be seen some defects on the upprer surface (encircled part in the photo hereunder).As for the bottom surface, there can not be seen any problem to be pointed out.

Structural ConditionAssessment

Grade 0

The facility is in sound condition. Detailed survey is not rquired.

Maintenance Record unknown

Facility DescriptionPile supported Iron Ore Export Jetty with total Length of 325m.Upper structure is made by reiforced concreteBeyond the Iron Ore Shiploader

Year Constructed 1967Port Name Namibe Saco Mar Category Concrete Deck SlabFacility ID Survey Date 2005/05/17

- Port of Namibe -

Page 4: 195/210 THE STUDY ON URGENT REHABILITATION PROGRAM … · Facility ID Survey Date 2005/05/17 Port Name Namibe Saco Mar Category - Port of Namibe - THE STUDY ON URGENT REHABILITATION

THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA198/210

Sa -04 -004

Location

Photos

Existing Condition

There can be seen some defects on the upprer surface.As for the bottom surface, there can be seen some cracks with efflorescence elution (encircled partin the photo hereunder).General condition is sound.

Structural ConditionAssessment

Grade 0

The facility is in sound condition. Detailed survey is not rquired.

Maintenance Record unknown

Facility DescriptionPile supported Iron Ore Export Jetty with total Length of 325m.Upper structure is made by reiforced concreteUp to the Iron Ore Shiploader

Year Constructed 1967

Facility ID Survey Date 2005/06/07, 10/17Port Name Namibe Saco Mar Category Concrete Deck Slab

- Port of Namibe -

Page 5: 195/210 THE STUDY ON URGENT REHABILITATION PROGRAM … · Facility ID Survey Date 2005/05/17 Port Name Namibe Saco Mar Category - Port of Namibe - THE STUDY ON URGENT REHABILITATION

THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA199/210

Sa -04 -005

Location

Photos

Existing ConditionThere can be seen some defects on the upprer surface.As for the bottom and side surface, there can be seen some cracks with efflorescence elution, coverconcrete spalling and exposed reinforceing bar (encircled part in the photo hereunder).

Structural ConditionAssessment

Grade 2

The facility is in structurally bad condition. It will become the object of rehabilitation plan.

Maintenance Record unknown

Facility Description The pile-supported connection bridge between Iron Ore Jettty and Oil Jetty.Upper structure is made by reinforced concrete.

Year Constructed 1967Port Name Namibe Saco Mar Category Concrete Deck SlabFacility ID Survey Date 2005/06/07

- Port of Namibe -

Page 6: 195/210 THE STUDY ON URGENT REHABILITATION PROGRAM … · Facility ID Survey Date 2005/05/17 Port Name Namibe Saco Mar Category - Port of Namibe - THE STUDY ON URGENT REHABILITATION

THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA200/210

Sa -04 -006

Location

Photos

Existing ConditionThere can be seen some defects on the upprer surface.As for the bottom and side surface, there can be seen some cracks with efflorescence elution, coverconcrete spalling and exposed reinforceing bar (encircled part in the photo hereunder).

Structural ConditionAssessment

Grade 2

The facility is in structurally bad condition. It will become the object of rehabilitation plan.

Maintenance Record unknown

Facility Description Pile supported Oil Jetty with total Length of 200m.Upper structure is made by reiforced concrete

Year Constructed 1967Port Name Namibe Saco Mar Category Concrete Deck SlabFacility ID Survey Date 2005/06/07

- Port of Namibe -

Page 7: 195/210 THE STUDY ON URGENT REHABILITATION PROGRAM … · Facility ID Survey Date 2005/05/17 Port Name Namibe Saco Mar Category - Port of Namibe - THE STUDY ON URGENT REHABILITATION

THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA201/210

Sa -04 -007

Location

Photos

Existing ConditionThere can be seen some defects on the upprer surface.As for the bottom and side surface, there can not be seen any damages to be pointed out.Score protection needs repaired.

Structural ConditionAssessment

Grade 2

The facility is in structurally bad condition. It will become the object of rehabilitation plan.

Maintenance Record unknown

Facility Description The pile-supported approaching bridge.Upper structure is made by reinforced concrete.

Year Constructed 1967Port Name Namibe Saco Mar Category Concrete Deck SlabFacility ID Survey Date 2005/06/07, 10/17

- Port of Namibe -

Page 8: 195/210 THE STUDY ON URGENT REHABILITATION PROGRAM … · Facility ID Survey Date 2005/05/17 Port Name Namibe Saco Mar Category - Port of Namibe - THE STUDY ON URGENT REHABILITATION

THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA202/210

Sa -10 -001Facility ID Survey Date 2005/06/07Port Name Namibe Saco Mar Category Fendering System

Year Purchased 1967 Manufacturer

Maintenance Record unknown

Facility Description

Plumb bob type fender system composed of reinforced concrete plumb hanged by steelchains from the oncrete deck slab, timber shock absorber and tube type rubber fender(original design).Iron Ore Jetty beyond the Iron Ore Shiploader

Existing Condition

There is no fender system remaining in its original design.All timbers go bad, all rubber fenders are changed to used truck tyres and some concrete covers arespalling.Due to corrosion, some hanging chains are broken.

Structural ConditionAssessment

Grade 2

The facility is in structurally bad condition. It will become the object of rehabilitation plan.

Location

Photos

- Port of Namibe -

Page 9: 195/210 THE STUDY ON URGENT REHABILITATION PROGRAM … · Facility ID Survey Date 2005/05/17 Port Name Namibe Saco Mar Category - Port of Namibe - THE STUDY ON URGENT REHABILITATION

THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA203/210

Sa -10 -002Facility ID Survey Date 2005/06/07, 10/17Port Name Namibe Saco Mar Category Fendering System

Year Purchased 1967 Manufacturer

Maintenance Record unknown

Facility Description

Plumb bob type fender system composed of reinforced concrete plumb hanged by steelchains from the oncrete deck slab, timber shock absorber and tube type rubber fender(original design).Iron Ore Jetty up to the Iron Ore Shiploader

Existing Condition

There is no fender system remaining in its original design.All timbers go bad, all rubber fenders are changed to used truck tyres and some concrete covers arespalling.Hanging chains are coroded.

Structural ConditionAssessment

Grade 2

The facility is in structurally bad condition. It will become the object of rehabilitation plan.

Location

Photos

- Port of Namibe -

Page 10: 195/210 THE STUDY ON URGENT REHABILITATION PROGRAM … · Facility ID Survey Date 2005/05/17 Port Name Namibe Saco Mar Category - Port of Namibe - THE STUDY ON URGENT REHABILITATION

THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA204/210

Sa -10 -003Facility ID Survey Date 2005/05/17, 10/17Port Name Namibe Saco Mar Category Fendering System

Year Purchased 1967 Manufacturer

Maintenance Record unknown

Facility Description

Plumb bob type fender system composed of reinforced concrete plumb hanged by steelchains from the oncrete deck slab, timber shock absorber and tube type rubber fender(original design).Oil Jetty

Location

Photos

Existing ConditionThere is no fender system maintaining the original design.All timbers go bad, all rubber fenders are changed to used truck tyres.Hanging chains are coroded.

Structural ConditionAssessment

Grade 2

The facility is in structurally bad condition. It will become the object of rehabilitation plan.

- Port of Namibe -

Page 11: 195/210 THE STUDY ON URGENT REHABILITATION PROGRAM … · Facility ID Survey Date 2005/05/17 Port Name Namibe Saco Mar Category - Port of Namibe - THE STUDY ON URGENT REHABILITATION

THE STUDY ON URGENT REHABILITATION PROGRAM OF PORTS IN THE REPUBLIC OF ANGOLA205/210

Sa -11 -001

Location

Photos

Existing Condition Mooring Cleats are severely corroded.

Structural ConditionAssessment

Grade 2

The facility is in structurally bad condition. It will become the object of rehabilitation plan.

Maintenance Record unknown

Facility Description Mooring CleatCapacity: from 50T (for Oil Jetty) to 150T (for Iron Ore Jetty)

Year Purchased 1967 Manufacturer unknown

Facility ID Survey Date 2005/04/11, 10/17Port Name Namibe Saco Mar Category Mooring System

50t50t

150t150t

- Port of Namibe -