Project: Rove Hotels - Port Saeed Client: EMAAR Properties Consultant: ARCHGROUP MEP Contractor: Nascon Engineering DAILY SITE REPORT - MANPOWER DISTRIBUTION Date19-7-2015 SUNDAY Sr. No. Location Work Description Man Power Assignment Floor Area Formen Plumber Electrician A/C Technicia A/C Ducts Helper 1 BASEMENT MARKING AND FIXING THE VENTILATION DUCT 1 6 BASEMENT MARKING AND FIXING PPR PIPES AND HDPE PIPES 1 8 2 GROUND FLOOR MARKING AND THE VENTILATION DUCT 3 GROUND FLOOR MARING THE FIRE PIPES ROUTE 3 3 GROUND FLOOR MARING THE CHILLED WATER PIPES ROUTE 3 ALATTA COMPANY : 06:00 AM 15 AL-REEF COMPANY TIME IN: 06:00 AM Total 2 14 9 Prepared By: Verified By: Main Contractor: Shapoorji Pallonji Mideast L.L.C. HAMZEH SHIHADEH

Upload: 2767141

Post on 08-Sep-2015

4 views

Category:

Documents


0 download

DESCRIPTION

ttwg

TRANSCRIPT

Man power distributionProject: Rove Hotels - Port SaeedClient: EMAAR PropertiesConsultant: ARCHGROUPMain Contractor: Shapoorji Pallonji Mideast L.L.C.MEP Contractor: Nascon Engineering

DAILY SITE REPORT - MANPOWER DISTRIBUTIONDate19-7-2015 SUNDAYSr. No.LocationWork DescriptionMan Power AssignmentTotal WorkersLoder BobcatFloorAreaFormenPlumberElectricianA/C TechnicianA/C DuctsHelperFire FightingJCB1BASEMENTMARKING AND FIXING THE VENTILATION DUCT16BASEMENT MARKING AND FIXING PPR PIPES AND HDPE PIPES182GROUND FLOORMARKING AND THE VENTILATION DUCT3GROUND FLOORMARING THE FIRE PIPES ROUTE3Su tankeri, arazz3GROUND FLOORMARING THE CHILLED WATER PIPES ROUTE3

ALATTA COMPANY : 06:00 AM15AL-REEF COMPANY TIME IN: 06:00 AMTotal214925Prepared By:HAMZEH SHIHADEHVerified By: Vibrasyonlu mastar