Man power distributionProject: Rove Hotels - Port SaeedClient: EMAAR PropertiesConsultant: ARCHGROUPMain Contractor: Shapoorji Pallonji Mideast L.L.C.MEP Contractor: Nascon Engineering
DAILY SITE REPORT - MANPOWER DISTRIBUTIONDate19-7-2015 SUNDAYSr. No.LocationWork DescriptionMan Power AssignmentTotal WorkersLoder BobcatFloorAreaFormenPlumberElectricianA/C TechnicianA/C DuctsHelperFire FightingJCB1BASEMENTMARKING AND FIXING THE VENTILATION DUCT16BASEMENT MARKING AND FIXING PPR PIPES AND HDPE PIPES182GROUND FLOORMARKING AND THE VENTILATION DUCT3GROUND FLOORMARING THE FIRE PIPES ROUTE3Su tankeri, arazz3GROUND FLOORMARING THE CHILLED WATER PIPES ROUTE3
ALATTA COMPANY : 06:00 AM15AL-REEF COMPANY TIME IN: 06:00 AMTotal214925Prepared By:HAMZEH SHIHADEHVerified By: Vibrasyonlu mastar