17.march.2005 c. a. martins, cern ab/po 1 power converter for the tt2 mercury target project by...
TRANSCRIPT
![Page 1: 17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649ea85503460f94bab496/html5/thumbnails/1.jpg)
17.March.2005 C. A. Martins, CERN AB/PO 1
Power converterfor the
TT2 mercury target project
by
Carlos DE ALMEIDA MARTINS(AB/PO)
![Page 2: 17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649ea85503460f94bab496/html5/thumbnails/2.jpg)
17.March.2005 C. A. Martins, CERN AB/PO 2
Historic overview
First technical proposal (on 31 March 2004):• ALICE/LHCb type power converter rated 6500Adc, 950Vdc, 6.7 MW
Power transformer A
Power transformer B
Rectifier bridge A
Rectifier bridge B
Filter capacitor bank
Magnet
18kV cell
Power transformer A
Power transformer B
Rectifier bridge A
Rectifier bridge B
Filter capacitor bank
Magnet
18kV cell
Rectifier
Transformers
Converter topology
![Page 3: 17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649ea85503460f94bab496/html5/thumbnails/3.jpg)
17.March.2005 C. A. Martins, CERN AB/PO 3
Historic overview
First technical proposal (on 31 March 2004):• ALICE/LHCb type power converter rated 6500Adc, 950Vdc, 6.7 MW
Converter location
Possibility # 1 - in the ISR gallery• Short DC cables, between the power converter and the magnet (~30m); • Long AC cables, between the 18kV cell (in bld 193, AD) and the power converter
Possibility # 2 - in bld 193, AD• Longer DC cables, between the power converter and the magnet; • Short AC cables, between the 18kV cell (available in bld 193, AD) and the power converter
target
![Page 4: 17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649ea85503460f94bab496/html5/thumbnails/4.jpg)
17.March.2005 C. A. Martins, CERN AB/PO 4
Historic overview
First technical proposal (on 31 March 2004):• ALICE/LHCb type power converter rated 6500Adc, 950Vdc, 6.7 MW
Advantages:• Brand new system;• Forced air cooling (no need for water circuit)• Cast resin power transformers. Can be placed indoor
Inconveniences:• Already short in time for buying a new power converter;• Already short in time for buying the power transformers;• One ALICE/LHCb spare power transformer can be lend, but that implies higher current harmonics in the 18 kV distribution network;• Ultimate current 7250A output;• Price: ~300 kCHF for the rectifier part only.
![Page 5: 17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649ea85503460f94bab496/html5/thumbnails/5.jpg)
17.March.2005 C. A. Martins, CERN AB/PO 5
Historic overview
Second technical proposal (~November 2004):• Decommissioned West Area (WA) power converter rated 8000Adc, 1000Vdc, 8 MW
Advantages:• Availability at the moment;• Higher current and voltage ratings;• Available power transformers, allowing low current harmonic distortion on the 18kV network• Price (detailed later)
Inconveniences:• Water cooled. Needs water connection to the power converter;• Oil transformers. Need to be placed outdoor, in a special pit, for security reasons;• Refurbish of power part and control/interlocks cabling
![Page 6: 17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649ea85503460f94bab496/html5/thumbnails/6.jpg)
17.March.2005 C. A. Martins, CERN AB/PO 6
West Area power converter8000Adc, 1000Vdc
Converter topology 18 kV cell
Power transformers
(in an oil tank)
2x4 Rectifier bridges
Passive LC filter
CROWBAR
To be placed in
parallel with the first group
![Page 7: 17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649ea85503460f94bab496/html5/thumbnails/7.jpg)
17.March.2005 C. A. Martins, CERN AB/PO 7
West Area power converter8000Adc, 1000Vdc
Converter photos, 1
Global viewRectifier bridges
Passive filter self
Passive filter capacitors
self capacitors
DC output
![Page 8: 17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649ea85503460f94bab496/html5/thumbnails/8.jpg)
17.March.2005 C. A. Martins, CERN AB/PO 8
West Area power converter8000Adc, 1000Vdc
Converter photos, 2
DCCT CROWBAR & controls Power transformers
![Page 9: 17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649ea85503460f94bab496/html5/thumbnails/9.jpg)
17.March.2005 C. A. Martins, CERN AB/PO 9
AB/PO proposition8000Adc, 1000Vdc
Strategy:• Refurbishment of the West Area Power Converter, making it compatible with the project requirements
Conserving the main components of the power part
Installing a new digital control electronic system, type PS
![Page 10: 17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649ea85503460f94bab496/html5/thumbnails/10.jpg)
17.March.2005 C. A. Martins, CERN AB/PO 10
AB/PO proposition8000Adc, 1000Vdc
Power Converters location:• At building 193 (AD) like ALICE/LHCb converter 2nd choice
target Power converter
(193, AD)
![Page 11: 17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649ea85503460f94bab496/html5/thumbnails/11.jpg)
17.March.2005 C. A. Martins, CERN AB/PO 11
AB/PO proposition8000Adc, 1000Vdc
Available infrastructures at building 193 (AD):
• Water circuit in the vicinity of the power converter’s location;
• Pit for placement of the power transformer (outside the building);
• 18 kV cell
![Page 12: 17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649ea85503460f94bab496/html5/thumbnails/12.jpg)
17.March.2005 C. A. Martins, CERN AB/PO 12
AB/PO proposition8000Adc, 1000Vdc
Estimated tasks, at charge of AB/PO, for refurbishment and costs:
• Disassembling of power converter at its actual location (BA6) and transport to its final location (Bld 193,AD);
• Preparation of the zone for reception;
• Reassembling, cabling work;
• New DCCT;
• New control electronics;
• Connection to the water circuit;
• Test and commissioning
• Decommissioning
10 kCHF
5 kCHF
15 kCHF
Total
10 kCHF
10 kCHF
10 kCHF
40 kCHF
110 kCHF
10 kCHF
![Page 13: 17.March.2005 C. A. Martins, CERN AB/PO 1 Power converter for the TT2 mercury target project by Carlos DE ALMEIDA MARTINS (AB/PO)](https://reader035.vdocuments.mx/reader035/viewer/2022062518/56649ea85503460f94bab496/html5/thumbnails/13.jpg)
17.March.2005 C. A. Martins, CERN AB/PO 13
AB/PO proposition8000Adc, 1000Vdc
Tasks not at charge of AB/PO (at charge of TS/EL)
• AC cabling between the 18kV cell and power transformer;
• AC cabling between power transformer and thyristor rectifier bridges;
• DC cabling between the power converter and the magnet