177.bcc masterplan 4-1-2017 consultation display low res · title: 177.bcc masterplan 4-1-2017...
TRANSCRIPT
NarrowaysHill
Sims' Hill
Memorial Stone
Universityof the
West of EnglandFrenchay Campus
University of theWest of EnglandGlenside Campus
KEY
Study area boundary.
Existing and proposed woodland
T / SF
Identified historic views
Existing ponds
Proposed primary circulation routes, to be gravel-surfaced.
Proposed secondary circuits, only surfaced where necessary, due to slope or heavy use.
Proposed hedgerow restoration, with associated protective livestock fences, and kissing gates, to enable reinstatement of park and downland grazing.
Proposed restoration of park boundary walls.WR
NOTESPurdown Percy – Anti Aircraft Battery
Proposed new visitor facilities/access to community café
C
Proposed new visitor car park.P2
Existing and proposed parkland trees.
18th century parkland ride to be restored.
BT radio repeater station.
Lockleaze open space to remain as mown grass.
Boundary between open space and Purdown enhanced with a new hedgerow.
Anti-aircraft gun emplacements conserved by cleaning off graffiti, minor repairs, removal of broken fences, and clearance of brambles and young trees.
Decaying concrete block and brick structures to be carefully banked over with earth, and reseeded to grass.
Command building, radar and predictor enclosures to be stabilised, secured and fitted out for WW2 school visits and open days.
Subterranean magazines to be cleaned and made accessible, with volunteer/events store in one section.
Seek loan of conserved anti-aircraft gun to help interpret the site, and display historic photographs of sites in use.
Clear bramble and scrub to restore the downland setting and open views.
Install a secure fence to protect the scheduled area at night, and enable sheep grazing. The historic route would be open in the daytime.
Public footpath diverted around the site, to enable the scheduled monument to be secured at night.
Progressive woodland thinning and scrub removal to enable reopening to parkland grazing
Proposed parkland trees, mainly oaks, and orchard planting of standard apples and pears, at 10m centres (170no. trees).
Key historic structures to be repaired, stabilised, interpreted and, subject to funding, restored.
ETL
ETL
Gantry
0 20 40
Scale in Metres
10 30 50
1 2
3
4
5
6
7
8
1
2
3
4
5
6
7
810
9
10
11
12
13
13
12
7
7
79
9 7
7
7
7
66
11
11
7
12
7
Stoke Park Conservation Management Plan • Draft Proposals Masterplan
CP2
Pond Field Wood
Pale Plantation
Path
(um
) Stone
Stone
Path (um)
Path (um)
Long BarrowAdventure Playground
Pur Down
Stone
Pond
Sinks
Path (um)
Path
(um
)
Club
Path (
um)
Path
(um)
Stone
Pond
Path (um)
SIR JO
HN'S LA
NE
Heath HouseCovert
The Grange
Heath
House
Lane
HEA
TH H
OU
SE L
ANE
Priory Hospital(formerly Heath House)
Long Wood
Hermitage Wood
Barn Wood
Monument
Elec sub-sta
Barn Wood
Stone
Stone
Stone
Obelisk
Existing BrandonTrust grazing
Existing BrandonTrust grazing
HeathCotages
Dra
in
Path
(um
)
Drain
Drain M32
M32
M32
M32
M32
Dra
in
Dra
in
Track
Path (um)
Path
(um
)
Path
(um)
Path
(um
)
LONG DOWN AVENUE
LON
GW
OO
D M
EAD
OW
S
Path
(um
)
Path
(um
)
Star Hill
Drain
Drain
Drain
FREN
CHAY PA
RK ROAD
Stone
Drain
Stone
Subway
Path (um)
Path
(um
)
Issues
Drain
BS
BS
LockleazeCommunity Centre
Play area
SM
Recreation Ground
Allotment Gardens
STOK
E LAN
ET
T
TT
T
TSF
T
T
SFSt. James'Church
SF V13
V5
Track
V9
V9
V3
V1
V4, V12
V6
V2
V8
V10
V7
V11
Lockleaze Open Space
New Wood
Long Saloon
Woodhouse or Great Saloon
Oak Saloon
WR
WR
WR
WRWR
WR
WR
The DowerHouse
Sims Hill
BT
New Wood
ElmTreeFarm
V14
WR
WR
WR
WR
Sir Jo
hn's W
all
Lockleaze Open Space
Electricity sub-station
South Pur Down
V14
Lockleaze Open Space
Duchess Pond
Pond
Pond
Pond