177.bcc masterplan 4-1-2017 consultation display low res · title: 177.bcc masterplan 4-1-2017...

1
Narroways Hill Sims' Hill Memorial Stone University of the West of England Frenchay Campus University of the West of England Glenside Campus KEY Study area boundary. Existing and proposed woodland T / SF Identified historic views Existing ponds Proposed primary circulation routes, to be gravel-surfaced. Proposed secondary circuits, only surfaced where necessary, due to slope or heavy use. Proposed hedgerow restoration, with associated protective livestock fences, and kissing gates, to enable reinstatement of park and downland grazing. Proposed restoration of park boundary walls. WR NOTES Purdown Percy – Anti Aircraft Battery Proposed new visitor facilities/ access to community café C Proposed new visitor car park. P2 Existing and proposed parkland trees. 18th century parkland ride to be restored. BT radio repeater station. Lockleaze open space to remain as mown grass. Boundary between open space and Purdown enhanced with a new hedgerow. Anti-aircraft gun emplacements conserved by cleaning off graffiti, minor repairs, removal of broken fences, and clearance of brambles and young trees. Decaying concrete block and brick structures to be carefully banked over with earth, and reseeded to grass. Command building, radar and predictor enclosures to be stabilised, secured and fitted out for WW2 school visits and open days. Subterranean magazines to be cleaned and made accessible, with volunteer/events store in one section. Seek loan of conserved anti-aircraft gun to help interpret the site, and display historic photographs of sites in use. Clear bramble and scrub to restore the downland setting and open views. Install a secure fence to protect the scheduled area at night, and enable sheep grazing. The historic route would be open in the daytime. Public footpath diverted around the site, to enable the scheduled monument to be secured at night. Progressive woodland thinning and scrub removal to enable reopening to parkland grazing Proposed parkland trees, mainly oaks, and orchard planting of standard apples and pears, at 10m centres (170no. trees). Key historic structures to be repaired, stabilised, interpreted and, subject to funding, restored. ETL ETL Gantry 0 20 40 Scale in Metres 10 30 50 1 2 3 4 5 6 7 8 1 2 3 4 5 6 7 8 10 9 10 11 12 13 13 12 7 7 7 9 9 7 7 7 7 6 6 11 11 7 12 7 Stoke Park Conservation Management Plan • Draft Proposals Masterplan C P2 Pond Field Wood Pale Plantation Path (um) Stone Stone Path (um) Path (um) Long Barrow Adventure Playground Pur Down Stone Pond Sinks Path (um) Path (um) Club Path (um) Path (um) Stone Pond Path (um) SIR JOHN'S LANE Heath House Covert The Grange Heath House Lane HEATH HOUSE LANE Priory Hospital (formerly Heath House) Long Wood Hermitage Wood Barn Wood Monument Elec sub-sta Barn Wood Stone Stone Stone Obelisk Existing Brandon Trust grazing Existing Brandon Trust grazing Heath Cotages Drain Path (um) Drain Drain M32 M32 M32 M32 M32 Drain Drain Track Path (um) Path (um) Path (um) Path (um) LONG DOWN AVENUE LONGWOOD MEADOWS Path (um) Path (um) Star Hill Drain Drain Drain FRENCHAY PARK ROAD Stone Drain Stone Subway Path (um) Path (um) Issues Drain BS BS Lockleaze Community Centre Play area SM Recreation Ground Allotment Gardens STOKE LANE T T T T T T SF T T SF St. James' Church SF V13 V5 Track V9 V9 V3 V1 V4,V12 V6 V2 V8 V10 V7 V11 Lockleaze Open Space New Wood Long Saloon Woodhouse or Great Saloon Oak Saloon WR WR WR WR WR WR WR The Dower House Sims Hill BT New Wood Elm Tree Farm V14 WR WR WR WR Sir John's Wall Lockleaze Open Space Electricity sub-station South Pur Down V14 Lockleaze Open Space Duchess Pond Pond Pond Pond

Upload: others

Post on 21-May-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 177.BCC Masterplan 4-1-2017 Consultation display low res · Title: 177.BCC Masterplan 4-1-2017 Consultation display low res Created Date: 20170104110226Z

NarrowaysHill

Sims' Hill

Memorial Stone

Universityof the

West of EnglandFrenchay Campus

University of theWest of EnglandGlenside Campus

KEY

Study area boundary.

Existing and proposed woodland

T / SF

Identified historic views

Existing ponds

Proposed primary circulation routes, to be gravel-surfaced.

Proposed secondary circuits, only surfaced where necessary, due to slope or heavy use.

Proposed hedgerow restoration, with associated protective livestock fences, and kissing gates, to enable reinstatement of park and downland grazing.

Proposed restoration of park boundary walls.WR

NOTESPurdown Percy – Anti Aircraft Battery

Proposed new visitor facilities/access to community café

C

Proposed new visitor car park.P2

Existing and proposed parkland trees.

18th century parkland ride to be restored.

BT radio repeater station.

Lockleaze open space to remain as mown grass.

Boundary between open space and Purdown enhanced with a new hedgerow.

Anti-aircraft gun emplacements conserved by cleaning off graffiti, minor repairs, removal of broken fences, and clearance of brambles and young trees.

Decaying concrete block and brick structures to be carefully banked over with earth, and reseeded to grass.

Command building, radar and predictor enclosures to be stabilised, secured and fitted out for WW2 school visits and open days.

Subterranean magazines to be cleaned and made accessible, with volunteer/events store in one section.

Seek loan of conserved anti-aircraft gun to help interpret the site, and display historic photographs of sites in use.

Clear bramble and scrub to restore the downland setting and open views.

Install a secure fence to protect the scheduled area at night, and enable sheep grazing. The historic route would be open in the daytime.

Public footpath diverted around the site, to enable the scheduled monument to be secured at night.

Progressive woodland thinning and scrub removal to enable reopening to parkland grazing

Proposed parkland trees, mainly oaks, and orchard planting of standard apples and pears, at 10m centres (170no. trees).

Key historic structures to be repaired, stabilised, interpreted and, subject to funding, restored.

ETL

ETL

Gantry

0 20 40

Scale in Metres

10 30 50

1 2

3

4

5

6

7

8

1

2

3

4

5

6

7

810

9

10

11

12

13

13

12

7

7

79

9 7

7

7

7

66

11

11

7

12

7

Stoke Park Conservation Management Plan • Draft Proposals Masterplan

CP2

Pond Field Wood

Pale Plantation

Path

(um

) Stone

Stone

Path (um)

Path (um)

Long BarrowAdventure Playground

Pur Down

Stone

Pond

Sinks

Path (um)

Path

(um

)

Club

Path (

um)

Path

(um)

Stone

Pond

Path (um)

SIR JO

HN'S LA

NE

Heath HouseCovert

The Grange

Heath

House

Lane

HEA

TH H

OU

SE L

ANE

Priory Hospital(formerly Heath House)

Long Wood

Hermitage Wood

Barn Wood

Monument

Elec sub-sta

Barn Wood

Stone

Stone

Stone

Obelisk

Existing BrandonTrust grazing

Existing BrandonTrust grazing

HeathCotages

Dra

in

Path

(um

)

Drain

Drain M32

M32

M32

M32

M32

Dra

in

Dra

in

Track

Path (um)

Path

(um

)

Path

(um)

Path

(um

)

LONG DOWN AVENUE

LON

GW

OO

D M

EAD

OW

S

Path

(um

)

Path

(um

)

Star Hill

Drain

Drain

Drain

FREN

CHAY PA

RK ROAD

Stone

Drain

Stone

Subway

Path (um)

Path

(um

)

Issues

Drain

BS

BS

LockleazeCommunity Centre

Play area

SM

Recreation Ground

Allotment Gardens

STOK

E LAN

ET

T

TT

T

TSF

T

T

SFSt. James'Church

SF V13

V5

Track

V9

V9

V3

V1

V4, V12

V6

V2

V8

V10

V7

V11

Lockleaze Open Space

New Wood

Long Saloon

Woodhouse or Great Saloon

Oak Saloon

WR

WR

WR

WRWR

WR

WR

The DowerHouse

Sims Hill

BT

New Wood

ElmTreeFarm

V14

WR

WR

WR

WR

Sir Jo

hn's W

all

Lockleaze Open Space

Electricity sub-station

South Pur Down

V14

Lockleaze Open Space

Duchess Pond

Pond

Pond

Pond