Page 1: 15AugPublicMeetingPresentationFINAL - Read-Only · :uljkw 6w exv urxwh 7hvwlqj ,qyhvwljdwlrqv ─+dyh prghoohg orqjhvw exvhv xvlqj yhklfoh wudfnlqj vriwzduh ─+dyh sk\vlfdoo\ wuldoohg

Omāroro Pipelines Project

Public Meeting

15 August 2019

Page 2: 15AugPublicMeetingPresentationFINAL - Read-Only · :uljkw 6w exv urxwh 7hvwlqj ,qyhvwljdwlrqv ─+dyh prghoohg orqjhvw exvhv xvlqj yhklfoh wudfnlqj vriwzduh ─+dyh sk\vlfdoo\ wuldoohg

Agenda

Introductions─ Wellington Water, Brian Perry Civil, WCC, GWRC

Overview of project – Wellington Water

Progress report – Brian Perry Civil

Wallace St bulk main works / diversion options – Brian Perry Civil

Questions

Page 3: 15AugPublicMeetingPresentationFINAL - Read-Only · :uljkw 6w exv urxwh 7hvwlqj ,qyhvwljdwlrqv ─+dyh prghoohg orqjhvw exvhv xvlqj yhklfoh wudfnlqj vriwzduh ─+dyh sk\vlfdoo\ wuldoohg

Overview

Omāroro Reservoir being built to address growth and improve resilience

Pipelines project is building the water network for the Omāroro Reservoir

Further renewal work being delivered at the same time –intent is no more major water network works in the area for many years

Page 4: 15AugPublicMeetingPresentationFINAL - Read-Only · :uljkw 6w exv urxwh 7hvwlqj ,qyhvwljdwlrqv ─+dyh prghoohg orqjhvw exvhv xvlqj yhklfoh wudfnlqj vriwzduh ─+dyh sk\vlfdoo\ wuldoohg

Scope of pipelines work

A new bulk water main

(Hargreaves, Wallace, Howard)

Renewal of local water mains

(Hargreaves, Wallace, Finlay)

Upgrade of storm water pipe

(Rolleston, Wallace)

Renewal of existing sewer

(Wallace, Finlay)

Page 5: 15AugPublicMeetingPresentationFINAL - Read-Only · :uljkw 6w exv urxwh 7hvwlqj ,qyhvwljdwlrqv ─+dyh prghoohg orqjhvw exvhv xvlqj yhklfoh wudfnlqj vriwzduh ─+dyh sk\vlfdoo\ wuldoohg

Progress report

Local water renewals on Hargreaves St completed

Bulk water on Hargreaves St underway

Local water renewals on Wallace St underway

Valve chamber at Hargreaves/Wright St corner underway

We’ll keep you informed about impact and progress of work

Page 6: 15AugPublicMeetingPresentationFINAL - Read-Only · :uljkw 6w exv urxwh 7hvwlqj ,qyhvwljdwlrqv ─+dyh prghoohg orqjhvw exvhv xvlqj yhklfoh wudfnlqj vriwzduh ─+dyh sk\vlfdoo\ wuldoohg

Construction Plan – estimated dates

bulk water main

local water mains

storm water

sewer

Page 7: 15AugPublicMeetingPresentationFINAL - Read-Only · :uljkw 6w exv urxwh 7hvwlqj ,qyhvwljdwlrqv ─+dyh prghoohg orqjhvw exvhv xvlqj yhklfoh wudfnlqj vriwzduh ─+dyh sk\vlfdoo\ wuldoohg

Wallace St traffic volumes

Wright St peak flow is ~200/hr (~1000/day)

June/July 2017, June 2018 traffic counts

Weekday/weekend peak is ~1600/hr (~20,000/day)

10pm – 5am peak is ~400/hr (~1000/nght)

Page 8: 15AugPublicMeetingPresentationFINAL - Read-Only · :uljkw 6w exv urxwh 7hvwlqj ,qyhvwljdwlrqv ─+dyh prghoohg orqjhvw exvhv xvlqj yhklfoh wudfnlqj vriwzduh ─+dyh sk\vlfdoo\ wuldoohg

Wallace St traffic reduction

VMS boards encourage use of alternative routes

Advertising campaign on radio, social media and other online channels

Advising delivery co’s, taxis, ubers to use alternate routes

We anticipate significant reduction in flow along Wallace St

WCC will continue to monitor

Page 9: 15AugPublicMeetingPresentationFINAL - Read-Only · :uljkw 6w exv urxwh 7hvwlqj ,qyhvwljdwlrqv ─+dyh prghoohg orqjhvw exvhv xvlqj yhklfoh wudfnlqj vriwzduh ─+dyh sk\vlfdoo\ wuldoohg

TM options for Wallace St bulk main work

Options considered included:

Option 1: Stop Go on Wallace Street

Option 2: Partial Diversion, NB Wright St, SB Wallace St

Close Wallace St/ Wright St

Option 3: Full diversion to Adelaide Rd

Option 4: Full diversion to Tasman St

Option 5: Close Wallace St, NB Wright St, SB Tasman St

Option 6: Close Wallace St, full diversion to Wright St This is by far the safest and least disruptive option

Page 10: 15AugPublicMeetingPresentationFINAL - Read-Only · :uljkw 6w exv urxwh 7hvwlqj ,qyhvwljdwlrqv ─+dyh prghoohg orqjhvw exvhv xvlqj yhklfoh wudfnlqj vriwzduh ─+dyh sk\vlfdoo\ wuldoohg

Option 1: Stop / Go on Wallace St

Advantages─ No diversion required

─ No changes to bus operations

Ruled out because─ Stop / Go on Wallace St creates gridlock throughout the network due

to tailbacks

─ The modelling confirms intolerable delays even outside of peak hours

─ This option is not feasible

Page 11: 15AugPublicMeetingPresentationFINAL - Read-Only · :uljkw 6w exv urxwh 7hvwlqj ,qyhvwljdwlrqv ─+dyh prghoohg orqjhvw exvhv xvlqj yhklfoh wudfnlqj vriwzduh ─+dyh sk\vlfdoo\ wuldoohg

Wallace St bulk water challenge

Page 12: 15AugPublicMeetingPresentationFINAL - Read-Only · :uljkw 6w exv urxwh 7hvwlqj ,qyhvwljdwlrqv ─+dyh prghoohg orqjhvw exvhv xvlqj yhklfoh wudfnlqj vriwzduh ─+dyh sk\vlfdoo\ wuldoohg

Option 2: NB Wright St, SB Wallace St

Partial diversion, northbound traffic only onto Wright St

Advantages─ Only northbound traffic on Wright St

Ruled out because─ Wallace St road width is insufficient to safely construct bulk water

pipes from Hargreaves St to Howard St

─ Due to deep trenches, large diameter pipes leaves insufficient room to allow traffic flow past the work site

─ This option is not feasible

Page 13: 15AugPublicMeetingPresentationFINAL - Read-Only · :uljkw 6w exv urxwh 7hvwlqj ,qyhvwljdwlrqv ─+dyh prghoohg orqjhvw exvhv xvlqj yhklfoh wudfnlqj vriwzduh ─+dyh sk\vlfdoo\ wuldoohg

Bus routing options

Divert via Adelaide Rd ─ Too far from current routes, large number of stops displaced

─ High impact on University and Schools

Divert via Tory St / Tasman St─ Diversion leads to convoluted routes

─ Twice carparks affected & overhead services to resolve (cf Wright St)

─ Significant distance from current routes, stops displaced

Divert via Wright St─ Short Diversion follows same route (1 stop relocated from Wallace St)

─ Some overhead wires need lifting for double-deckers

Page 14: 15AugPublicMeetingPresentationFINAL - Read-Only · :uljkw 6w exv urxwh 7hvwlqj ,qyhvwljdwlrqv ─+dyh prghoohg orqjhvw exvhv xvlqj yhklfoh wudfnlqj vriwzduh ─+dyh sk\vlfdoo\ wuldoohg

Option 3: Full diversion to Adelaide Rd

Wallace St and Wright St both closed to through traffic

Advantages─ No additional traffic on Wright St

Ruled out because─ Very long diversion

─ Limited capacity on Adelaide Road for the additional traffic

─ Public transport impact too great – route changes and delays

─ Network resilience compromised if Wallace St + Wright St closed

─ This option is not feasible

Page 15: 15AugPublicMeetingPresentationFINAL - Read-Only · :uljkw 6w exv urxwh 7hvwlqj ,qyhvwljdwlrqv ─+dyh prghoohg orqjhvw exvhv xvlqj yhklfoh wudfnlqj vriwzduh ─+dyh sk\vlfdoo\ wuldoohg

Option 4: Full diversion to Tory St/Tasman St

Wallace St and Wright St both closed to through traffic

Advantages─ No additional traffic on Wright St

Ruled out because─ Poor connection to road network, particularly north end

─ Very long diversion

─ Tory St / Tasman St ill-suited to anticipated traffic flows

─ More affected residents, more parking displaced

─ Public transport impact significant – long route change

Page 16: 15AugPublicMeetingPresentationFINAL - Read-Only · :uljkw 6w exv urxwh 7hvwlqj ,qyhvwljdwlrqv ─+dyh prghoohg orqjhvw exvhv xvlqj yhklfoh wudfnlqj vriwzduh ─+dyh sk\vlfdoo\ wuldoohg

Option 5: NB Wright St, SB Tasman St

Wallace St closed between Hargreaves St and John St

Advantages─ Only northbound traffic on Wright St

Ruled out because─ Same reasons as Option 4

─ Complex diversion due to diverse routes NB/SB

─ Max number of affected residents

Page 17: 15AugPublicMeetingPresentationFINAL - Read-Only · :uljkw 6w exv urxwh 7hvwlqj ,qyhvwljdwlrqv ─+dyh prghoohg orqjhvw exvhv xvlqj yhklfoh wudfnlqj vriwzduh ─+dyh sk\vlfdoo\ wuldoohg

Option 6: Full Diversion Wright St

Wallace St closed between Hargreaves St and John St

Disadvantages─ Significantly increased traffic on Wright St

Advantages─ Shortest diversion length – least impact on residents/parking

─ Least impact on bus operations and bus users

─ Minimal infrastructure change required

─ This is by far the safest and least disruptive option

Page 18: 15AugPublicMeetingPresentationFINAL - Read-Only · :uljkw 6w exv urxwh 7hvwlqj ,qyhvwljdwlrqv ─+dyh prghoohg orqjhvw exvhv xvlqj yhklfoh wudfnlqj vriwzduh ─+dyh sk\vlfdoo\ wuldoohg

Wright St diversion

Traffic diverted to Wright St at Hargreaves St and John St

Car parking removed on one side of Wright St

Buses will use the route

Travel times reliable

Work can proceed safely

Overall disruption shortened with this diversion

Wright St diversion route

Wallace St work area

Page 19: 15AugPublicMeetingPresentationFINAL - Read-Only · :uljkw 6w exv urxwh 7hvwlqj ,qyhvwljdwlrqv ─+dyh prghoohg orqjhvw exvhv xvlqj yhklfoh wudfnlqj vriwzduh ─+dyh sk\vlfdoo\ wuldoohg

Wright St bus route

Testing/Investigations─ Have modelled longest buses using vehicle tracking software

─ Have physically trialled the longest buses by driving the route

─ Wires lifted for double deckers

─ To do: Adjust road camber at corners in Hargreaves St

─ To do: Test drive double deckers

─ Buses will pass each other on Wright St ~16 times a day

Controls─ Bus stop will be near the laneway to Wallace St

─ Signalised crossing for pedestrians as per Wallace St

─ Additional lighting if required

Page 20: 15AugPublicMeetingPresentationFINAL - Read-Only · :uljkw 6w exv urxwh 7hvwlqj ,qyhvwljdwlrqv ─+dyh prghoohg orqjhvw exvhv xvlqj yhklfoh wudfnlqj vriwzduh ─+dyh sk\vlfdoo\ wuldoohg

Wright St diversion bus tracking

Hargreaves St / Wright St intersection

John St / Wright St intersection

Page 21: 15AugPublicMeetingPresentationFINAL - Read-Only · :uljkw 6w exv urxwh 7hvwlqj ,qyhvwljdwlrqv ─+dyh prghoohg orqjhvw exvhv xvlqj yhklfoh wudfnlqj vriwzduh ─+dyh sk\vlfdoo\ wuldoohg

Impacts of diversion on Wright St residents

The additional traffic will be significantly greater than existing flows - expect reduction on current Wallace St traffic

Pedestrian crossing installed near alley through to Wallace St for safe passage across Wright St

Bus stop moved from outside Wallace St dairy to beside new pedestrian crossing in Wright St

Car parks removed on one side (uneven numbers) to provide space for two way traffic

Rubbish collection will be on a different schedule

Page 22: 15AugPublicMeetingPresentationFINAL - Read-Only · :uljkw 6w exv urxwh 7hvwlqj ,qyhvwljdwlrqv ─+dyh prghoohg orqjhvw exvhv xvlqj yhklfoh wudfnlqj vriwzduh ─+dyh sk\vlfdoo\ wuldoohg

What can be done to reduce the impact?

Traffic calming measures such as reduced speed limits, traffic lights and minimum lane widths

VMS boards on feeder routes encouraging people to use Adelaide Road as an alternative

Advertising campaign on radio, social media and other online channels telling people to avoid the area

Asking delivery companies, taxis, ubers to use alternate routes

Coupon parking will be changed to residents’ parking in adjacent streets – surveys indicate unused parks exceed ‘lost’ parks

Page 23: 15AugPublicMeetingPresentationFINAL - Read-Only · :uljkw 6w exv urxwh 7hvwlqj ,qyhvwljdwlrqv ─+dyh prghoohg orqjhvw exvhv xvlqj yhklfoh wudfnlqj vriwzduh ─+dyh sk\vlfdoo\ wuldoohg

Impacts of work on Wallace St residents

Access to properties from each end of the work site (no through traffic)

Work site moving along the street, different residents impacted as work progresses

No parking on street adjacent to work sites

Full communication with affected residents and businesses

1-1 engagement to address individual issues for access that arise (as we have been doing in Hargreaves St)

Pedestrians will need to use the formal crossing points, this will add distance to some people’s walks

Page 24: 15AugPublicMeetingPresentationFINAL - Read-Only · :uljkw 6w exv urxwh 7hvwlqj ,qyhvwljdwlrqv ─+dyh prghoohg orqjhvw exvhv xvlqj yhklfoh wudfnlqj vriwzduh ─+dyh sk\vlfdoo\ wuldoohg

Time considerations in diversion options

Alternative 1 – 43 week diversion onto Wright St11 week full diversion (bulk main works) Nov 2019 – Feb 2020

+

32 week NB diversion (sewer/local water) Feb 2020 – Sep 2020

or

Alternative 2 – 23 week diversion onto Wright St23 week full diversion (bulk main/sewer/local water) Nov 2019 – May 2020