Overview of activities in WP2 Advanced manufacturing and after sales service supply chain design Bram Westerweel

Upload: sintas

Post on 16-Jan-2017

294 views

Category:

Technology


2 download

TRANSCRIPT

Page 1: 151111 Progress Update WP2 (Bram Westerweel)

Overview of activities in WP2

Advanced manufacturing and after sales service supply chain designBram Westerweel

Page 2: 151111 Progress Update WP2 (Bram Westerweel)

Update WP2 205/01/2023

Agenda

• Current status update− PhD level courses− Research proposal

• Research framework− Potential topics

• Future activities

Page 3: 151111 Progress Update WP2 (Bram Westerweel)

305/01/2023

Current status update

• Starting point: February 2015• Research school BETA requires:

• PhD level course load of 40 ects (1120 hours)• Full research proposal after 1 year

• Currently completed:• 910 hours of course load • Concept research proposal (including research framework)

Introduction to WP2

Page 4: 151111 Progress Update WP2 (Bram Westerweel)

Introduction to WP2 405/01/2023

Research framework

• The capital goods lifecycle:• Each stage presents different topics to investigate. Design and exploitation

stages seem most interesting and most relevant for AM & service logistics

Design Production Exploitation Disposal

SINTAS (2015-2019)Additive manufacturing in service supply chains

WP1 WP2Supply chain design WP3

Product design decisions (TCO

perspective)

AM concepts in the exploitation phase

1. Service supply chain design2. Temporary replacement

3. TBD4. TBD

Page 5: 151111 Progress Update WP2 (Bram Westerweel)

Introduction to WP2 505/01/2023

Topics in the exploitation stage

1) Current service supply chains are usually multi-echelon structures.• Which conditions cause a shift to a series of independent single-echelon

systems? Take into account:− Lead times− Component costs− Reliability

2) Some critical components have very long lead times. To protect against downtime they must be stocked.

• Could AM be used to provide temporary replacements, buying time to source the regular component or complete a mission?

Regular centralsource

D1 D2

LT1 LT2

Local (AM)source

Local (AM)source

D1 D2

S0LT0

S1' S2'

LT1' LT2'Versus

S1 S2

Page 6: 151111 Progress Update WP2 (Bram Westerweel)

Introduction to WP2 605/01/2023

Topics in the design stage

• Shifting to AM requires (re)visiting the design stage• Quantify the required investment• Quantify performance benefits and logistical benefits

• There is scientific work on interactions between (re)design stage decisions and total cost of ownership (TCO)• Some of our work will be positioned there

Design Production Exploitation Disposal

Page 7: 151111 Progress Update WP2 (Bram Westerweel)

Introduction to WP2 705/01/2023

Future activities

• Finish up with coursework • Complete the research proposal (February 2016)

• Part of this is identifying additional topics!• Complete a first paper (summer 2016)

februari ’16 februari ’19januari ’17 januari ’18 januari ’19

september ’16Draft Paper 1

1-2-2016Research proposal

april ’17Draft Paper 2

december ’17Draft Paper 3

1-2018 - 6-2018Visit external

university

januari ’19PhD Thesis