1416 - west africa agricultural productivity program / direct seeders for pregerminated seed

19
WEST AFRICA AGRICULTURAL PRODUCTIVITY PROGRAM Dr. Gaoussou Traoré, Coordinator

Upload: sri-rice-international-programs-cals-cornell-university

Post on 07-Jul-2015

170 views

Category:

Technology


1 download

DESCRIPTION

Presentation at the Workshop on Crop Production Equipment for the System of Rice Intensification (SRI) Presenter: Gaoussou Traore Title:The West Africa Agricultural Productivity Program / Direct Seeders for Pregerminated Seeds Date: November 1, 2014 Venue: ACISAI, Asian Institute of Technology, Thailand, weeders

TRANSCRIPT

WEST AFRICA AGRICULTURAL

PRODUCTIVITY PROGRAM

Dr. Gaoussou Traoré, Coordinator

OUTLINEOUTLINE

WAAPP SPECIALIZATION CENTER ON RICE IN MALI: WAAPP/SC-RICE

DIRECT SEEDER FOR PRE-GERMINATED SEEDS: Dr. MINAMBA

EXPECTIONS

Programme Programme Components Components 4 Components :Component 1 : Enabling Conditions for Regio Coop &Improved Tech dissemination

Component 2 : National Centers of Specialization (NCOS)/RCE: RICE

Component 3 : Demand Driven Technology Transfer and Adoption

Component 4 : Coord, Management, M&E

GRANDS BASSINS DE PRODUCTION DE RIZ: AO

Bulletin club du sahel-AO: Enjeu Ouest Africain N°2 Juin 2011

GRAND BASSINS RIZICOLES A. 0UEST

BREEDING: Hybrids, New improved varieties, Adaptation

SUSTAINABLE PRACTICES FOR INTENSIFICATION: Econ. & environmental use of fertilizers; effic. water use; climate smart; intercropping; rotation; diversification etc.

SRI INTEGRATED PEST & DISEASE MANAGEMENT: Virus, Bacteria, weeds, nematodes, termites etc.

MECHANIZATION

POST HARVEST PROCESSING

VALUE CHAIN ANALYSIS

OBSERVATORY: DECISION MAKING TOOLS, TRAINING (MMC)

 

ATELIER SUR LE SRI OUAGA: 26-27 Juillet 2012

TEST AND ADAPTATION (4 SEASONS)

PRE-GERMINATED SEEDS SEEDER

MOTORIZED

ANIMAL TRACTION

AVERAGE YIELD:Kg/haZone DIRECT SEEDER TRANSPLANT

Kouroumari5 760 -

N’Débougou6 400 4320

Niono5 760 -

Molodo5 333 4 857

MBéwani5 178 6 747

Kolongo5 714 -

K-Macina5 785 5 449

NEXT STEPSDEFINE AFTER WORKSHOP ACTIONS

COMPILE AND DISSEMINATE PRESENTATIONS AND CONCLUSIONS/RECOMMENDATIONS

START PROCESS OF TECHNOLOGIES TRANSFERT AND ADAPTATION AS SOON AS POSSIBLE/CAPACITY BUILDING

FOLLOW UP GROUP FOR IMPLEMENTATION OF THE WORSHOP RECOMMENDATIONS

MERCI/THANKS