1401 a000-a200 l3 info + plans ubc property services 1100 - 2329 west mall vancouver, v56 1z4 t: 604...

4
A 000 A 101 A 201 A 202 A 301 A 401 A 402 A 501 3rd Floor Tenant Improvement Wayne and William White Engineering Design Centre The University of British Columbia, Vancouver, BC ISSUE for CONSTRUCTION - OCTOBER 22, 2014 The University Of British Columbia, 2345 East Mall, Vancouver, BC A Portion Of District Lots 3044 And 4805, Group 1, New Westminster District University Of British Columbia Governing Building Code Major Occupancy Building Area: Outermost Walls BCBC Definition Building Storey Height Building Measured Height West Plaza Grade To L3 Ceiling No. Of Streets Faced Fire Protection BCBC Article(s) Governing Building Size & Construction Construction Maximum Building Area Floor Assemblies Mezzanine Assemblies Load-bearing Assemblies 2012 BCBC - Part 3 Group A, Division 2 742 sm 3 Storey + Mezzanine 13.710m 2 Streets Sprinklered To NFPA-13 3.2.2.24 Group A, Division 2, Up To 6 Storeys, Any Area, Sprinklered Noncombustible Construction Any Area 1 H 1 H Fire-resistance Rating as per Supported Assembly Building Code Data Cover | Project Info Building Context Floor Plans 3rd Floor Plan 3rd Floor RCP Sections Interior Elevations & Details Partition Framing & Millwork Details Assemblies & Schedules Not to Scale UBC Property Services 1100 - 2329 West Mall Vancouver, V56 1Z4 T: 604 822 0195 E: kyle.reese@ubc.ca Contact: Kyle Reese McFarland Marceau Architects Ltd 115 East 8th Avenue Vancouver, V5T 1RB T: 604 733 1115 E: mchevalier@mmal.ca Contact: Mark Chevalier GHL Consultants Ltd 950 - 409 Granville Street Vancouver, V6C 1T2 T: 604 689 4449 x105 E: gc@ghl.ca Contact: Gary Chen E: dg@ghl.ca Contact: David Graham Stantec Consulting Inc 1100 - 111 Dunsmuir Street Vancouver, V6B 6A3 T: 604 696 8088 E: kevin.anthony@stantec.com Contact: Kevin Anthony Acumen Engineering Ltd 650 - 2700 Production Way Burnaby, V5A 4X1 T: 604 676 9545 E: maciejl@acumenengineering.ca Contact: Maciej Lewandowski Total Site Area Site Coverage FSR Building Height Car Parking Loading Bike Parking Equivalent to: City of Vancouver Class II Standard 1,685 Sm 44 % (Bldg Area/Site) 1.12 (GFA/Site) +/- 13.215m (Ave East Mall Grade To Top Of Parapet) +/- 14.265m (Ave West Plaza Grade To Top Of Parapet) N/a 1 Stall (shared) 24 Stalls on Project Site 24 Stalls to CEME Courtyard Project Statistics Required Bike Spaces: 1 x 16-rack per 100 people = 3x16 = 48 spaces Due to restrictions of Project Site UBC has agreed that remainder of bikes to be provided in adjacent CEME courtyard site. 40% 61 sm 152 sm Rooms 102/M102 Design Studio Open Mezzanine * M102 Mezzanine Area * 102 Room Area Rooms M160/M170/M170A/M170B/M170C M+E * M+E Rooms Enclosed Sevice Mezzanine Area Complies to BCBC 3.2.1.1 Exemption from Mezzanine / Storey Calculation Level 1 Mezz. Level 2 Level 3 _________ Gross Floor Areas (GFA) 681 sm 87 sm (Excl 108 sm M+E Room) 581 sm 573 sm ____________________ 1,922 sm Front Yard Setback: Level 1 + Mezzanine Front Yard Setback: Level 2 + Level 3 North Side Yard South Side Yard West Rear Yard Height: West Plaza Grade to T/O Roof Edge Curb All Setbacks Measured to O/S Face of Wall 9.900m 6.700m 3.500m 2.435m 16.250m 14.435m M-1 M-2 M-3 M-4 M-5 Legends Notes & Drawing List HVAC Plan Plumbing Plan Fire Suppression Plan Specifications E1.01 E2.01 E3.01 E4.01 T3.01 Third Floor: Panels Third Floor: Lighting Plan Third Floor: Power Plan Electrical Specification Third Floor: Rough-in for Comm + A/V Plan FOR EXISTING BUILDING INFORMATION REFER TO UBC BUILDING PERMIT & OCCUPANCY PERMIT Ref: CBP10001-1 & OWNER RECORD DRAWINGS McFARLAND MARCEAU A R C H I T E C T S LT D DRAWING NO. CAD FILE NAME 1401 A000-A200 L3 Info + Plans.vwx DRAWN BY Drawn By CHECKED BY Checked By PROJECT ID SHEET TITLE Cover Project Information 3 2 1 14/10/22 14/09/19 14/06/25 Issue for Construction Issue for Tender Building Permit Appln & Tender REV Y M D ISSUE 115 East 8th Avenue Vancouver BC V5T1R8 T. 604.733.1115 www.mmal.ca McFarland Marceau Architects Ltd. (including its employees and agents) can take no responsibility for the accuracy or use of any information of this drawing pertaining to existing site condi- tions, including buildings, services and utilities. It is the respon- sibility of the person, using said information to verify its accuracy. Should any discrepency with the actual site conditions be found, it must be reported to the Architect, with time being of the essence. This drawing, as an instrument of service, is the property of McFarland Marceau Architects Ltd. and may not be reproduced without their permis- sion and unless the reproduction carries their name. All designs and other information shown on this drawing are for use on the specified project only and shall not be used otherwise without written permission of this office. 3rd Floor Tenant Improvement Wayne & William White Engineering Design Centre 2345 East Mall, UBC Vancouver, BC 1401 UBC Project #: SR019238 Approach to Building Code Compliance by GHL Consultants Ltd June 25th, 2014 including: A 201 BCBC - Building Code Review Plan Fit out existing 3rd floor shell space to include: - teaching space - teaching space - teaching space - male washrooms Scope of Work & Viewing of Existing Conditions: Contractor & all trades are to view existing conditions to verify the extent and the scope of work required to complete tenant improvement. Typically, proposed finishes, fixtures and fittings are to match those existing in the rest of the builidng, which can be seen when viewing existing conditions. Architectural Specification by McFarland Marceau Architects Ltd September 19th, 2014 Work comprises completion of fit out of partially completed shell space. Work comprises the installation of a laptop counter & acoustic ceiling panels in previously completed corridor space.

Upload: others

Post on 27-Mar-2021

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1401 A000-A200 L3 Info + Plans UBC Property Services 1100 - 2329 West Mall Vancouver, V56 1Z4 T: 604 822 0195 ... Legends Notes & Drawing List HVAC Plan Plumbing Plan Fire Suppression

A 000A 101A 201A 202A 301A 401A 402A 501

3rd Floor Tenant ImprovementWayne and William White Engineering Design Centre

The University of British Columbia, Vancouver, BC

ISSUE for CONSTRUCTION - OCTOBER 22, 2014

The University Of British Columbia,2345 East Mall,Vancouver, BC

A Portion Of District Lots 3044 And 4805, Group 1,New Westminster District University Of British Columbia

Governing Building Code

Major Occupancy

Building Area:Outermost WallsBCBC Definition

Building Storey Height

Building Measured HeightWest Plaza Grade To L3 Ceiling

No. Of Streets Faced

Fire Protection

BCBC Article(s)Governing Building Size

& Construction

Construction

Maximum Building Area

Floor Assemblies

Mezzanine Assemblies

Load-bearing Assemblies

2012 BCBC - Part 3

Group A, Division 2

742 sm

3 Storey + Mezzanine

13.710m

2 Streets

Sprinklered To NFPA-13

3.2.2.24 Group A, Division 2, Up To 6 Storeys, Any Area, Sprinklered

Noncombustible Construction

Any Area

1 H

1 H

Fire-resistance Rating as per Supported Assembly

Building Code Data

Cover | Project InfoBuilding Context Floor Plans3rd Floor Plan3rd Floor RCPSectionsInterior Elevations & DetailsPartition Framing & Millwork DetailsAssemblies & Schedules

Not to Scale

UBC Property Services1100 - 2329 West MallVancouver, V56 1Z4T: 604 822 0195E: [email protected]: Kyle Reese

McFarland Marceau Architects Ltd115 East 8th AvenueVancouver, V5T 1RBT: 604 733 1115E: [email protected]: Mark Chevalier

GHL Consultants Ltd950 - 409 Granville StreetVancouver, V6C 1T2T: 604 689 4449 x105E: [email protected]: Gary ChenE: [email protected]: David Graham

Stantec Consulting Inc1100 - 111 Dunsmuir StreetVancouver, V6B 6A3T: 604 696 8088E: [email protected]: Kevin Anthony

Acumen Engineering Ltd650 - 2700 Production WayBurnaby, V5A 4X1T: 604 676 9545E: [email protected]: Maciej Lewandowski

Total Site Area

Site Coverage

FSR

Building Height

Car Parking

Loading

Bike ParkingEquivalent to:

City of VancouverClass II Standard

1,685 Sm

44 % (Bldg Area/Site)

1.12 (GFA/Site)

+/- 13.215m (Ave East Mall Grade To Top Of Parapet)+/- 14.265m (Ave West Plaza Grade To Top Of Parapet)

N/a

1 Stall (shared)

24 Stalls on Project Site24 Stalls to CEME Courtyard

Project Statistics

Required Bike Spaces:1 x 16-rack per 100 people = 3x16 = 48 spacesDue to restrictions of Project Site UBC has agreed that remainder of bikes to be provided in adjacent CEME courtyard site.

40%

61 sm152 sm

Rooms 102/M102 Design StudioOpen Mezzanine * M102 Mezzanine Area * 102 Room Area

Rooms M160/M170/M170A/M170B/M170C M+E * M+E Rooms Enclosed Sevice Mezzanine AreaComplies to BCBC 3.2.1.1 Exemption from Mezzanine / Storey Calculation

Level 1

Mezz.

Level 2

Level 3_________

Gross Floor Areas (GFA)

681 sm

87 sm (Excl 108 sm M+E Room)

581 sm

573 sm____________________1,922 sm

Front Yard Setback: Level 1 + MezzanineFront Yard Setback: Level 2 + Level 3

North Side Yard

South Side Yard

West Rear Yard

Height: West Plaza Grade to T/O Roof Edge Curb

All Setbacks Measured to O/S Face of Wall

9.900m6.700m

3.500m

2.435m

16.250m

14.435m

M-1M-2M-3M-4M-5

Legends Notes & Drawing ListHVAC PlanPlumbing PlanFire Suppression PlanSpecifications

E1.01E2.01E3.01E4.01T3.01

Third Floor: PanelsThird Floor: Lighting PlanThird Floor: Power PlanElectrical SpecificationThird Floor: Rough-in for Comm + A/V Plan

FOR EXISTING BUILDING INFORMATION REFER TO UBC BUILDING PERMIT & OCCUPANCY PERMIT Ref: CBP10001-1 & OWNER RECORD DRAWINGS

McFARLAND MARCEAUA R C H I T E C T S L T D

DRAWING NO.

CAD FILE NAME1401 A000-A200 L3 Info + Plans.vwx

DRAWN BY

Drawn By

CHECKED BY

Checked ByPROJECT ID

SHEET TITLE

CoverProject Information

321

14/10/2214/09/1914/06/25

Issue for ConstructionIssue for TenderBuilding Permit Appln & Tender

REV Y M D ISSUE

115 East 8th AvenueVancouver BC

V5T1R8T. 604.733.1115

www.mmal.ca

McFarland Marceau Architects Ltd. (including its employees and agents) can take no responsibility for the accuracy or use of any information of this drawing pertaining to existing site condi-tions, including buildings, services and utilities. It is the respon-sibility of the person, using said information to verify its accuracy. Should any discrepency with the actual site conditions be found, it must be reported to the Architect, with time being of the essence.

This drawing, as an instrument of service, is the property of McFarland Marceau Architects Ltd. and may not be reproduced without their permis-sion and unless the reproduction carries their name. All designs and other information shown on this drawing are for use on the specifi ed project only and shall not be used otherwise without written permission of this offi ce.

3rd

Floo

r Ten

ant I

mpr

ovem

ent

Way

ne &

Will

iam

Whi

te E

ngin

eerin

g D

esig

n C

entre

2345

Eas

t Mal

l, U

BC

Van

couv

er, B

C

1401

UB

C P

roje

ct #

: SR

0192

38

Approach to Building Code Complianceby GHL Consultants LtdJune 25th, 2014including:A 201 BCBC - Building Code Review Plan

Fit out existing 3rd floor shell space to include:

- teaching space - teaching space - teaching space

- male washrooms

Scope of Work & Viewing of Existing Conditions:Contractor & all trades are to view existing conditions to verify the extent and the scope of work required to complete tenant improvement.

Typically, proposed finishes, fixtures and fittings are to match those existing in the rest of the builidng, which can be seen when viewing existing conditions.

Architectural Specificationby McFarland Marceau Architects LtdSeptember 19th, 2014

Work comprises completion of fit out of partially completed shell space.

Work comprises the installation of a laptop counter & acoustic ceiling panels in previously completed corridor space.

Page 2: 1401 A000-A200 L3 Info + Plans UBC Property Services 1100 - 2329 West Mall Vancouver, V56 1Z4 T: 604 822 0195 ... Legends Notes & Drawing List HVAC Plan Plumbing Plan Fire Suppression

D10

0.1

G100

GASMETER

EXIS. STAIR

EXIS. ASPHALT SIDEWALK

EXIS. CONCRETE SIDEWALK

EXIS. CONCRETE SIDEWALK

EXIS. BRICK PAD

UP

12

34

56

78

910

1112

1314

1516

1718

1921

2223

2425

2627

2829

3031

3233

3435

20

WIR

E TR

ELLI

SW

IRE

TREL

LIS

PLANTER

PLANTER

ATRIUM &STUDENT COMMONS

100

O/H

DOOR

UP

CANOPY ABOVE

O/H DOOR

O/H

DOOR

STAIR 2S02

ELEVATORE01

STAIR 5S05

COMPETITIONSPACE

101

UniWC111

CORRIDOR110

COMPOSITESWORKSHOP

101A

DESIGNSTUDIO

102JANITOR112

STAIR 7S07

M+E160

FUTUREACCESSIBLE

LIFT

FUTURELIFT

FUTURETOP LANDING

891011121314151617

1 2 3 4 5 6 7

UP

UP

1234567891011121314151617182223242526272829303132333435

192021

STAIR 1S01

STAIR 6S06

SLOPED GLAZING

100A

RWL

RWL

RWL

RWL

RWL

RWL

STEEL POST

STEELPOST

STEELPOSTSTEEL POST

STEEL POST

UP

1 2 3 4 5 6

1516

7 8 9 10 11 12 13

14

PRIN

TER

N.I.C

.

PLOTTER N.I.C.

SHIPLADDERTO MECH

O/S FACE OF FOUNDATION WALL @ BASE OF SLOPED GLAZING

O/S FACE OF CURTAIN WALL @ U/S ROOF

O/S FACE OF ROOF OVERHANG

SUNSHADE

BEAM

OVE

R

BEAM

OVE

R

96

.000

94

.850

94

.850

94

.850

94

.850

9450 21605 6345

BEAM OVER

1100 750450

EDGE OF CONCRETE ABOVE

EDGE OF CONCRETE ABOVE

EDGE OF CONCRETE ABOVE

EDGE

OF

CONC

RETE

ABO

VE

EDGE OFCONCRETE ABOVE

2189

2

F

A

G

E

C

B

D

1525

4880

3050

4880

1982

5575

42700

30503050 4575 9150 9150 9525 4200

7 8654321

3.1 5.1

F.1

ENGINEERING LANE

DN123456789101112131415161718

2223242526272829303132333435

192021

UP

WIR

E TR

ELLI

SW

IRE

TREL

LIS

STAIR LANDING ABOVECONCRETE WALKWAY ABOVE

12

34

56

78

910

1112

1314

1516

1718

1921

2223

2425

2627

2829

3031

3233

3435

UP

DN

20

STAIR 3S03

ELEVATORE01

ELEVMACH RM

M170C

SHAFTOVER

COMPETITION SPACEBELOW

ATRIUMBELOW

CANOPY

MECH ROOMM170

STAIR 2S02

DESIGN STUDIOMEZZANINE

M102

STAIR 2S02

DATAROOMM170B

STAIR 5S05

SHAFTOVER

DNELEC ROOM

M170A

DN

1314151617 12

1 2 3 4 5 6 7 8 9

UP

12 11 1013

STAIR 1S01

CONCRETE LIDOVER DOOR BELOW

M+EM160

RWL

RWL

RWL

RWL

RWL

RWL

RWL

STEELPOST

STEELPOST

STEELPOST

STEELPOST

BEAM

OVE

R

LOUVRESEE MECHANICAL

DN

1 2 3 4 5 6 7 8 9 10 11 12 13

1516

14

DESIGN STUDIOBELOW

O/S FACE OF FOUNDATION WALL @ BASE OF SLOPED GLAZING

O/S FACE OF CURTAIN WALL @ U/S ROOF

O/S FACE OF ROOF OVERHANG

SUNSHADE

EDGE OF CONCRETE ABOVE

EDGE OF CONCRETE ABOVE

EDGE OF CONCRETE ABOVE

EDGE

OF

CONC

RETE

ABO

VE

EDGE OFCONCRETE ABOVE

2189

2

F

A

G

E

C

B

D

1525

4880

3050

4880

1982

5575

42700

30503050 4575 9150 9150 9525 4200

7 8654321

3.1 5.1

F.1

DN1234567891011121314151617181920

2223242526272829303132333435

21

CANOPYBELOW

STUDENT WORKSHOP211

ELECTRONICSWORKROOM

213

MTG ROOM224

STAIR 4S04

CORRIDOR200

PTPT

PT

MECHSHAFT

COFFEE

NICHE

MWC223

FWC221

JANITOR222

READING &STUDY ROOM

201

ELEVATORE01

MECHSHAFT

PERIMETER CURB

PERIMETER CURB

SHOWER212

FACULTYLOBBY

210

WCLOBBY

220

FACULTYCORRIDOR

230

PT

1314 121516171819 16

DN

UP

1 2 3 4 5 6 7 8 9 10 11

COMM

.CL

OSET

B

A

STAIR 2S02

WIR

E TR

ELLI

S

STAIR 1S01

UP

12

34

56

78

910

1112

1314

1516

1718

1920

21

9450 21605 9595

PT

FACULTY OFFICE 1231

FACULTY OFFICE 3233

FACULTY OFFICE 2232

FACULTY OFFICE 4234

EDC DIRECTOR235

MECHSHAFT

SLOPED SOFFITTO ALCOVE

DECK

STAIR 3S03

DN

12

34

56

78

910

1112

1314

1516

1718

1921

2223

2425

2627

2829

3031

3233

3435

20

O/S FACE OF FOUNDATION WALL @ BASE OF SLOPED GLAZING

O/S FACE OF CURTAIN WALL @ U/S ROOF

O/S FACE OF ROOF OVERHANG

SUNSHADE

EXTENT OF HEATEDSPACE BELOW

RD

RD

RD

RD

OUTLINE OF MEZZANINE BELOW

RD

EXTE

NT O

F HE

ATED

SPAC

E BE

LOW

A600

A600

A600

A600

RDRD

1100 750450

OUTL

INE

OFM

EZZA

NINE

BEL

OW

2189

2

F

A

G

E

C

B

D

1525

4880

3050

4880

1982

5575

42700

30503050 4575 9150 9150 9525 4200

7 8654321

3.1 5.1

F.1

MILLWORK:Similar Existing Millwork Installation

LAPTOP COUNTER:Similar Laptop Counter Installation

P1:

MALE WASHROOMS:Similar Male Washroom Installation

SIMILAR INSTALLATIONSIN EXISTING BUILDING

ACOUSTIC CEILING PANELS:Similar Acoustic Ceiling Panel Installation

P2:

P3:

P4:

P1 P2 P3 P4

DECK

STAIR 3S03

DN

12

34

56

78

910

1112

1314

1516

1718

1921

2223

2425

2627

2829

3031

3233

3435

20

PT PT

PT

PT

ROOF

LIN

E AB

OVE

STAIR 4S04

MECHSHAFT

MECHSHAFT

EDGE OF CONCRETE ABOVE

EDGE OF CONCRETE ABOVE

EDGE

OF

CONC

RETE

ABO

VE

WCCORRIDOR

310

109876

171819 162021 111215 14 13

DN

STAIR 2S02

WIR

E TR

ELLI

S

UP

12

34

56

78

910

1112

1314

1516

1718

1920

21

JANITOR302

MECHSHAFT

MECHSHAFT

FWC311

FD

CLOSET321

FD

PT

PT

PT

MAINCORRIDOR

300

ELEVATORE01

MWC312

FLEX SPACE 2303

FLEX SPACE 1301

FLEX SPACE 3322

NORTHCORRIDOR

320

RECYCLE ALCOVE

LADDER WITHROOF ACCESSHATCH OVER

STAIR BELOW

43895

O/S FACE OF FOUNDATION WALL @ BASE OF SLOPED GLAZING

O/S FACE OF CURTAIN WALL @ U/S ROOF

O/S FACE OF ROOF OVERHANG

SUNSHADE

EDGE OF CONCRETE ABOVE

RD RD

5600

1982

1325

INSULATIONSLOPE TO ROOF

DRAIN

INSULATIONSLOPE TO ROOF

DRAIN

2189

2

F

A

G

E

C

B

D15

2548

8030

5048

8019

8255

75

42700

30503050 4575 9150 9150 9525 4200

7 8654321

3.1 5.1

F.1

FIT OUT SHELL SPACEFlex Space 1 Rm 301 - teaching spaceFlex Space 2 Rm 303 - teaching spaceFlex Space 3 Rm 322 - teaching spaceMWC Rm 312 - male washrooms

INSTALL LAPTOP COUNTER & ACOUSTIC CEILING PANELSMain Corridor Rm 300

EXISTING SPACE REMAINS AS-IS

LEVEL 1Scale = 1:200

Shown For Context Only

LEVEL 2Scale = 1:200

Shown For Context Only

LEVEL 1 MEZZANINEScale = 1:200

Shown For Context Only

TENANT IMPROVEMENTLEVEL 3Scale = 1:200

Fit Out of Existitg Shell Space

McFARLAND MARCEAUA R C H I T E C T S L T D

DRAWING NO.

CAD FILE NAME1401 A000-A200 L3 Info + Plans.vwx

DRAWN BY

Drawn By

CHECKED BY

Checked ByPROJECT ID

SHEET TITLE

Building ContextFloor Plans

321

14/10/2214/09/1914/06/25

Issue for ConstructionIssue for TenderBuilding Permit Appln & Tender

REV Y M D ISSUE

115 East 8th AvenueVancouver BC

V5T1R8T. 604.733.1115

www.mmal.ca

McFarland Marceau Architects Ltd. (including its employees and agents) can take no responsibility for the accuracy or use of any information of this drawing pertaining to existing site condi-tions, including buildings, services and utilities. It is the respon-sibility of the person, using said information to verify its accuracy. Should any discrepency with the actual site conditions be found, it must be reported to the Architect, with time being of the essence.

This drawing, as an instrument of service, is the property of McFarland Marceau Architects Ltd. and may not be reproduced without their permis-sion and unless the reproduction carries their name. All designs and other information shown on this drawing are for use on the specifi ed project only and shall not be used otherwise without written permission of this offi ce.

3rd

Floo

r Ten

ant I

mpr

ovem

ent

Way

ne &

Will

iam

Whi

te E

ngin

eerin

g D

esig

n C

entre

2345

Eas

t Mal

l, U

BC

Van

couv

er, B

C

1401

UB

C P

roje

ct #

: SR

0192

38

Scale = 1:75

Page 3: 1401 A000-A200 L3 Info + Plans UBC Property Services 1100 - 2329 West Mall Vancouver, V56 1Z4 T: 604 822 0195 ... Legends Notes & Drawing List HVAC Plan Plumbing Plan Fire Suppression

DECK

STAIR 3S03

DN

12

34

56

78

910

1112

1314

1516

1718

1921

2223

2425

2627

2829

3031

3233

3435

20

D312

PT PT

D302RRR

PT

PT

ROOF

LINE

ABO

VE

D30

0.1

STAIR 4S04

MECHSHAFT

MECHSHAFT

EDGE OF CONCRETE ABOVE

EDGE OF CONCRETE ABOVE

EDGE

OF

CONC

RETE

ABO

VE

WCCORRIDOR

310

109876

171819 162021 111215 14 13

DN

STAIR 2S02

WIR

E TR

ELLIS

UP

12

34

56

78

910

1112

1314

1516

1718

1920

21

JANITOR302

D301.1

MECHSHAFT

MECHSHAFT

D303.1

FWC311

FD

D30

0.2

D31

0.2

D31

0.1

D321

D311

CLOSET321

D320

FD

PT

PT

PT

MAINCORRIDOR

300

ELEVATORE01

MWC312

FLEX SPACE 2303

FLEX SPACE 1301

FLEX SPACE 3322

D301.2D303.2

NORTHCORRIDOR

320

RECYCLE ALCOVE

LADDER WITHROOF ACCESSHATCH OVER

STAIR BELOW

43895

O/S FACE OF FOUNDATION WALL @ BASE OF SLOPED GLAZING

O/S FACE OF CURTAIN WALL @ U/S ROOF

O/S FACE OF ROOF OVERHANG

SUNSHADE

EDGE OF CONCRETE ABOVE

RD RD

5600

1982

1325

INSULATIONSLOPE TO ROOF

DRAIN

INSULATIONSLOPE TO ROOF

DRAIN

WORK BENCHC/W STORAGE ABOVE

WOR

K BE

NCH

C/W

STO

RAGE

ABO

VE WOR

K BE

NCH

C/W

STO

RAGE

ABO

VE

P2

1829610

1100

12200

A600

A600

43A402

12

14 / 15

11 A401 1341A401

41 A401

41

A40110A402

10 A402 REVERSE

SCREEN

SCREEN

5360

1710

3010

805

1828

NEW TI PARTITIONALIGN TO C/L VERTICAL MULLION @ WINDOW

c-W2c-P2

c-P2

c-P2

c-P5 c-P5

c-P2

c-P2

c-P2

NEW TI PARTITIONALIGN TO C/L VERTICAL

MULLION @ WINDOW

NEW TI PARTITIONALIGN FACE OF DRYWALL TO FLEX SPACE 1 WITH FACE OF ADJACENT SHAFT

SHIM DRYWALL AS REQUIRED TO ENSURE FLUSH ALIGNMENT OF FACES OF DRYWALL AT ADJOINING WALL TYPES

P2

2 x G

WB

1 x G

WB

2 x G

WB

1 x G

WB

2 / A

301

1 / A

301

1 / A

301

2 / A

301

e-S1

c-P2

c-P2

c-P5e-S1

e-S1

c-P1.1

c-P1.1

c-P2

e-S1ae-S1a

e-S1

e-S1

e-S1

e-W3

e-W2a

e-P3

e-P3

e-W

3

e-W3

e-W2a

e-W

2a

600

P2

P2

52

A402

55

A402

56

A402

SIM

SIM

AT MALE WASHROOM, COMPLETE PARTIAL WALL ASSEMBLIES, & FIT OUT WITH WC STALL, FIXTURES & MILLWORK & FINISHES

1a / A

301

1a / A

301

SIM

e-S1

e-S1

e-W

2

e-W2 e-W2

e-P1

e-P3

e-P1

GWB HORIZONTALSHAFT OVER

e-S1

He-P4

c-P2

MILLWORK LAPTOP COUNTER:STOOLS NIC - BY OWNER 51

A401

TABLES & STOOLSNIC - BY OWNER

TABLES & STOOLSNIC - BY OWNER

TABLES & STOOLSNIC - BY OWNER

AT FLEX SPACE, COMPLETE PARTIAL WALL ASSEMBLIES, & FIT OUT WITH MILLWORK, CEILING PANELS & FINISHES

AT MAIN CORRIDOR FIT OUT WITH MILLWORK & CEILING PANELS

AT FLEX SPACE, COMPLETE PARTIAL WALL ASSEMBLIES, & FIT OUT WITH MILLWORK, CEILING PANELS & FINISHES

AT FLEX SPACE, COMPLETEPARTIAL WALL ASSEMBLIES,& FIT OUT WITH MILLWORK,

CEILING PANELS & FINISHES

54 / A402

53 / A402

44 / A402

41 / A402

41 / A402

42 / A402

41 / A402

41 / A402

53 / A402SIM

50 / A401

NEW DOOR& SIDELIGHT

NEW DOOR& SIDELIGHT

NEW DOOR INEXTG FRAME

ALIGN SOUTH EDGE OF SIDELIGHT TONORTH FACE OF MWC SERVICE WALL

FIRE EVACUATION PLAN & FIRE SAFETY REPORT:OWNER WILL UPDATE & REPLACE EXISTING WALL MOUNTED FIRE EVACUATION PLAN & EXISTING FIRE SAFETY REPORT.

SIM 42 / A402 44 / A402AT CABLE TRAY

AT CABLE TRAY

31 / A402

125

MAXOLS

MAXOLS

57 / A402BASE of WALL &TOP OF WALL

57 / A402BASE of WALL &TOP OF WALL

2189

2

F

A

G

E

C

B

D

1525

4880

3050

4880

1982

5575

42700

30503050 4575 9150 9150 9525 4200

7 8654321

3.1 5.1

F.1

INDICATES AREA PREVIOUSLY COMPLETED:REMAINING AREAS ARE INCLUDED IN LEVEL 3 FIT OUT

"c" PREFIX INDICATES:COMPLETE EXTG PARTITION [P] OR EXTERIOR WALL [W]:OVER EXTG STEEL STUD FRAMING, COMPLETE ASSEMBLY WITH ACOUSTIC INSULATION BATT FILL, DRYWALL LAYER[S].APPLY TO ONE OR BOTH FACES OF FRAMING AS APPROPRIATE.

c-P_

e-P_

P2 NEW PARTITION WALL - REFER TO ASSEMBLY SCHEDULE

c-W_

e-W_

e-S_

ALL NEW & EXTG FLOOR, WALL, CEILING & SOFFIT SURFACES, WITHIN FIT OUT SPACES, ARE REQUIRED TO BE FINISHED.REFER TO FIT OUT FINISHES SCHEDULE.WINDOW COVERINGS & FURNITURE NIC - BY OWNER.

RD ROOF DRAIN

FLOOR DRAIN

CLEAR DIM @ DOOR JAMB FOR ACESSIBILITY600mm OR 300mm

CORNER GUARD - see DETAIL 31/A402

MAXIMUM OCCUPANT LOAD SIGNTO BLDG INSPECTOR APPROVAL

FD

A600A300

G

"e" PREFIX INDICATES:RETAIN EXTG PARTITION [P] OR EXTERIOR WALL [W] OR SHAFTWALL [S]:PREVIOUSLY COMPLETED IN ORIGINAL CONSTRUCTION.

FOR COMPLETED EXISTING, OR PARTIALLY COMPLETED EXISTINGTYPE "P", TYPE "W" & TYPE "S" ASSEMBLIES, REFER TO ASSEMBLY SCHEDULE.

FOR DETAILED WALL ASSEMBLIES REFER TO ASSEMBLY SCHEDULE

MAXOLS

McFARLAND MARCEAUA R C H I T E C T S L T D

DRAWING NO.

CAD FILE NAME1401 A000-A200 L3 Info + Plans.vwx

DRAWN BY

Drawn By

CHECKED BY

Checked ByPROJECT ID

SHEET TITLE

3rd FloorPlan

321

14/10/2214/09/1914/06/25

Issue for ConstructionIssue for TenderBuilding Permit Appln & Tender

REV Y M D ISSUE

115 East 8th AvenueVancouver BC

V5T1R8T. 604.733.1115

www.mmal.ca

McFarland Marceau Architects Ltd. (including its employees and agents) can take no responsibility for the accuracy or use of any information of this drawing pertaining to existing site condi-tions, including buildings, services and utilities. It is the respon-sibility of the person, using said information to verify its accuracy. Should any discrepency with the actual site conditions be found, it must be reported to the Architect, with time being of the essence.

This drawing, as an instrument of service, is the property of McFarland Marceau Architects Ltd. and may not be reproduced without their permis-sion and unless the reproduction carries their name. All designs and other information shown on this drawing are for use on the specifi ed project only and shall not be used otherwise without written permission of this offi ce.

3rd

Floo

r Ten

ant I

mpr

ovem

ent

Way

ne &

Will

iam

Whi

te E

ngin

eerin

g D

esig

n C

entre

2345

Eas

t Mal

l, U

BC

Van

couv

er, B

C

1401

UB

C P

roje

ct #

: SR

0192

38

Scale = 1:75

Page 4: 1401 A000-A200 L3 Info + Plans UBC Property Services 1100 - 2329 West Mall Vancouver, V56 1Z4 T: 604 822 0195 ... Legends Notes & Drawing List HVAC Plan Plumbing Plan Fire Suppression

AP: 8'x4'

AP: 10'x4'AP: 10'x4'

AP: 12'x4' [cut]SUSPENDED PANEL

CUT NORTH EDGE TO SUIT

AP: 10'x4'

AP: 8'x4' AP: 8'x4'

AP: 8'x4' AP: 8'x4'

AP: 8'x2'8 AP: 8'x2'8

AP: 8'x2'8

AP: 8'x4'

AP: 8'x4'

AP: 8'x4'

AP: 8'x4'

AP: 8'x4'

AP: 8'x2'8

AP: 8'x4'

AP: 8'x4' AP: 8'x4'

AP: 8'x2'8

AP: 8'x2'8

AP: 8'x4'

AP: 8'x4'

CS

CSCS

CS

AP: 12'x4'

AP: 12'x4'

AP: 8'x2'8

AP: 8'x2'8

AP: 6'x4'

AP: 6'x4'

AP: 6'x4'

AP: 6'x4'

AP: 8'x4'

AP: 8'x4'

CBCB

AP: 8'x4'

AP: 8'x4'

AP: 6'x2'8

AP: 6'x2'8

AP: 6'x4'

AP: 6'x4'

T

AP: 12'x4'

AP: 12'x4'

CS

CS

CS

2550 +FFE

CS

21

A402TRIM BACK AP EDGETO SUIT PIPES &

HORIZ SHAFT

DIM TO WEST EDGE OF PIPES &STRUTS TO NW OF COLUMN C4

21

A402

ACCESS PANELSEE MECH

CS

ACCESS PANELSEE MECH

AP: 10'x4'

SUSPENDED PANELAP: 12'x4' [cut]

CUT SOUTH EDGE TO SUIT

HORIZSHAFT

PIPESZONE

ALIGN WEST EDGE OF LIGHTTO LTG EAST OF GRIDS C4+D4

ALIGN LIGHTS TO LTGEAST OF GRIDS C7+D7

"D" NOTE:ALIGN HVAC DIFFUSERS TO BE CONSISTENT DISTANCE FROM EDGE OF BEAM

"D" NOTE:ALIGN HVAC DIFFUSERS TOBE CONSISTENT DISTANCE

FROM EDGE OF BEAM

AP: 12'x4' AP: 12'x4' [cut]

CUT TO ALLOW PASSAGEOF MECHANICAL DUCT

AP: 12'x4'AP: 12'x4'

42 / A402

SIM42 / A402 SIM: 21 / A402

3658

106550

067

0

670

500

670

185

185

820

600

300

300

300

300 300

CS

CS

CS

CB

CS

CB

CB

CB

CS

CS

CS

CS

CS

CS

CB

CB

CB

CB

CS

CS

CS

CS

CS

CS

CONC BEAM OVER

CONC BEAM OVER

CONC BEAM OVER

CONC BEAM OVER CS

670

CS

CS

CB

CB

CB

CB

CS

CS

CS

CONC BEAM OVER

CONC BEAM OVER

CONC BEAM OVER

CONC BEAM OVER

CS

670

500

500

670

535

670

185

185

300300

670

32 / 33

A402ALL CONC - GWBABUTMENTS

PANELS SUSPENDED ON STEEL STUD HANGERS.HANGERS TO STEEL STUD ENGINEER DESIGN

DD

DD

DD

DD

300

21

A402

21

A402

52

A402

21

A402

32 / 33

A402ALL CONC - GWBABUTMENTS

PT PT

PT

PT

ROOF

LINE

ABO

VE

STAIR 4S04

MECHSHAFT

MECHSHAFT

EDGE OF CONCRETE ABOVE

EDGE OF CONCRETE ABOVE

EDGE

OF

CONC

RETE

ABO

VE

WCCORRIDOR

310

109876

171819 162021 111215 14 13

DN

STAIR 2S02

WIR

E TR

ELLIS

UP

12

34

56

78

910

1112

1314

1516

1718

1920

21

JANITOR302

MECHSHAFT

MECHSHAFT

FWC311

FD

CLOSET321

FD

PT

PT

PT

MAINCORRIDOR

300

ELEVATORE01

MWC312

FLEX SPACE 2303

FLEX SPACE 1301

FLEX SPACE 3322

NORTHCORRIDOR

320

RECYCLE ALCOVE

MINIMUM T-BAR HEIGHT:SET CLG AS HIGH AS POSSIBLE

54 / A402

2 / A

301

1 / A

301

1 / A

301

2 / A

301

1a / A

301

1a / A

301

53 / A402

54 / A402SIM

2189

2

F

A

G

E

C

B

D

1525

4880

3050

4880

1982

5575

42700

30503050 4575 9150 9150 9525 4200

7 8654321

3.1 5.1

F.1

CB

CEILINGS LEGEND:ACOUSTIC PANEL

GYPSUM CLG BOARD

CONCRETE SLAB SOFFIT

CONCRETE BEAM

T-BAR SYSTEM CEILING

HORIZONTAL SHAFTWALL

AP: 8'x4'

CS

GWB

T

TO GWB CEILINGS INCLUDE ACCESS PANELS TO SUIT ABOVE CEILING MECH EQUIPMENT REQUIREMENTS.

ALL MECH, PLUMBING, FIRE PROTECTION COMPONENTS TO BE SET AS HIGH AS POSSIBLE TO MAXIMISE CEILING HEIGHTS.

COORDINATE DRAINS & TRAPS FROM SLAB ABOVE, TO AVOID ACOUSTIC CEILING PANELS WHEREVER POSSIBLE.

IN ALL AREAS MIN 2100mm HEAD CLEARANCE MUST BE ACHIEVED TO MEET BCBC REQUIREMENTS.

FOR ALL ELEC, HVAC & SPRINKLER LEGENDS SEE MECH & ELEC DRAWINGS.

ALL ACOUSTIC CEILING PANELS TO BE TEMPORARILY MARKED ON CONCRETE SOFFITS AT THE START OF THE WORK, TO ENSURE MECH & ELEC COORDINATION OF SERVICES WITH ACOUSTIC PANEL LOCATIONS.ADVISE ARCHITECT & REQUEST CLARIFACTION IF ANY CONFLICT ARISES.

PROVIDE DUCT TRIM FLANGE OVER DRYWALL AT ALL DUCT PENETRATIONS THROUGH DRYWALL WALL OR CEILING. TRIM FLANGE FINISH TO MATCH DUCT FINISH.

TO ALL ACCESS PANEL DOORS ADHERE 75mm DUCT LINER BATT TO TOP SIDE OF ACCESS PANEL.

SH1

WHERE LIGHTING OCCURS AT ACOUSTIC PANEL LOCATION, LIGHT TO BE CENTRED ON PANEL.

WHERE NOTED SUSPENDED ACOUSTIC PANELS REQUIRE SUPPORT BY STEEL STUD BACK FRAMING, TO THE DESIGN OF THE STRUCTURAL ENGINEER OF THE STEEL STUD TRADE.

EXEX

EX

EX

EX EX

OCS

321

303301

STAIR BELOW

E E E

E E E

E E E

EE

E E E

E E E

E E E

E E E E

E E

E

E

E

EE

INDICATES AREA PREVIOUSLY COMPLETED:REMAINING AREAS ARE INCLUDED IN LEVEL 3 FIT OUT

PRIOR TO INSTALLING STEEL STUD FRAMING FOR ACOUSTIC PANELS, COORDINATE HVAC, CABLE TRAY, SPRINKLER & OTHER SERVICES LOCATIONS.ADVISE ARCHITECT IF ANY SERVICES, STRUTS OR HANGERS, COMPROMISE ACOUSTIC PANEL LAYOUT.

ALL NEW & EXTG FLOOR, WALL, CEILING & SOFFIT SURFACES, WITHIN FIT OUT SPACES, ARE REQUIRED TO BE FINISHED.REFER TO FIT OUT FINISHES SCHEDULE.

ALIGN SUSPENDED LTG FIXTURES TO C/L OF ACOUSTIC PANELS EXCEPT WHERE NOTED

51 / A402

McFARLAND MARCEAUA R C H I T E C T S L T D

DRAWING NO.

CAD FILE NAME1401 A000-A200 L3 Info + Plans.vwx

DRAWN BY

Drawn By

CHECKED BY

Checked ByPROJECT ID

SHEET TITLE

3rd FloorReflected Celing Plan

321

14/10/2214/09/1914/06/25

Issue for ConstructionIssue for TenderBuilding Permit Appln & Tender

REV Y M D ISSUE

115 East 8th AvenueVancouver BC

V5T1R8T. 604.733.1115

www.mmal.ca

McFarland Marceau Architects Ltd. (including its employees and agents) can take no responsibility for the accuracy or use of any information of this drawing pertaining to existing site condi-tions, including buildings, services and utilities. It is the respon-sibility of the person, using said information to verify its accuracy. Should any discrepency with the actual site conditions be found, it must be reported to the Architect, with time being of the essence.

This drawing, as an instrument of service, is the property of McFarland Marceau Architects Ltd. and may not be reproduced without their permis-sion and unless the reproduction carries their name. All designs and other information shown on this drawing are for use on the specifi ed project only and shall not be used otherwise without written permission of this offi ce.

3rd

Floo

r Ten

ant I

mpr

ovem

ent

Way

ne &

Will

iam

Whi

te E

ngin

eerin

g D

esig

n C

entre

2345

Eas

t Mal

l, U

BC

Van

couv

er, B

C

1401

UB

C P

roje

ct #

: SR

0192

38

Scale = 1:75