Global Design EffortDirector’s Report
Grooved Insert forCesrTA Wiggler
Fermilab NML: RF Unit Test FacilitySystems Tests
14-Nov-11 PAC - Prague
Global Design Effort 2
GDE Status & Plans
• Update on ILC accelerator R&D
• The Technical Design Report– Top level changes– Baseline Technical Reviews ; PM level changes– TDR Scope and Plans – Cost Estimate– Project Implementation Planning
• ILC Systems Tests
• Post-TDR planning
• Japan CFS News and Plans
• SCRF• ATF-2• Electron Cloud
Update on ILC accelerator R&D
14-Nov-11 PAC - Prague
Global Design Effort 3
14-Nov-11 PAC - Prague
Global Design Effort 4Global Design Effort
Major R&D Goals for Technical Design
SCRF• High Gradient R&D - globally coordinated program to
demonstrate gradient by 2010 with 50%yield; improve yield to 90% by TDR (end 2012)
• Manufacturing: plug compatible design; industrialization, etc.• Systems tests: FLASH; plus NML (FNAL), STF2 (KEK) post-TDR
Test Facilities• ATF2 - Fast Kicker tests and Final Focus design/performance
EARTHQUAKE RECOVERY• CesrTA - Electron Cloud tests to establish damping ring
parameters/design and electron cloud mitigation strategy• FLASH – Study performance using ILC-like beam and
cryomodule (systems test)
14-Nov-11 PAC - Prague
Global Design Effort 5
The ILC SCRF Cavity
- Achieve high gradient (35MV/m); develop multiple vendors; make cost effective, etc
- Focus is on high gradient; production yields; cryogenic losses; radiation; system performance
Global Plan for ILC Gradient R&D
14-Nov-11 PAC - Prague
Global Design Effort 6
New baseline gradient:Vertical acceptance: 35 MV/m average, allowing ±20% spread (28-42 MV/m)Operational: 31.5 MV/m average, allowing ±20% spread (25-38 MV/m)
14-Nov-11 PAC - Prague
Global Design Effort 7
Cavity Gradient Milestone Achieved
2010Milestone
TDRGoal
• Toward TDR goal• Field emission;
mechanical polishing• Other progress
14-Nov-11 PAC - Prague
Global Design Effort 8
ATF2 – Beam size/stability and kicker tests
IP Shintake Monitor
Final Doublet
14-Nov-11 PAC - Prague
Global Design Effort 9
14-Nov-11 PAC - Prague
Global Design Effort 10
• Mitigating Electron Cloud
• Simulations – electrodes; coating and/or grooving vacuum pipe• Demonstration at CESR critical tests
eCloud R&D
14-Nov-11 PAC - Prague
Global Design Effort 11
CesrTA - Wiggler Observations
IWLC2010 - CERN, Geneva, Switzerland
0.002”radiusElectrode best performance
14-Nov-11 PAC - Prague
Global Design Effort 12
Field Region
Baseline Mitigation RecommendationAlternatives for
Further Investigation
Drift* TiN Coating Solenoid Windings NEG Coating
Dipole Grooves with TiN Coating
Antechambers for power loads and photoelectron control
R&D into the use of clearing electrodes.
Quadrupole*
TiN Coating R&D into the use of clearing electrodes or grooves with TiN coating
Wiggler Clearing Electrodes
Antechambers for power loads and photoelectron control
Grooves with TiN Coating
Proposed ILC Mitigation Scheme
– Top level changes– Baseline Technical Reviews
(lower level changes)– TDR Scope and Plans (Walker)– Cost Estimate (Dugan)– Project Implementation Planning (Paterson)
The Technical Design Report
14-Nov-11 PAC - Prague
Global Design Effort13
14-Nov-11 PAC - Prague
Global Design Effort 14
Establishing Baseline for the TDR
14-Nov-11 PAC - Prague
Global Design Effort 15
Proposed Design changes for TDR
RDR SB2009• Single Tunnel for main linac
•Move positron source to end of linac ***
• Reduce number of bunches factor of two (lower power) **
• Reduce size of damping rings (3.2km)
• Integrate central region
14-Nov-11 PAC - Prague
Global Design Effort 16
Technical Design Phase and Beyond
AD&I studies
2009 2010
RDR ACD concepts
R&D Demonstrations
TDP Baseline Technical Design
2011 2012 2013
RDR Baseline
Be
ijing
Wo
rks
ho
p
TDR
TDP-1 TDP-2ChangeRequest
SB2009 evolve
change control processAAPPACPhysics
CE
RN
Wo
rks
ho
p
Technical Volumes
15.11.2011
Reference Design Report
ILC Technical Progress Report (“interim report”)
TDR Part I:R&D
TDR Part II:BaselineReferenceReport
Technical Design Report
~250 pagesDeliverable 2
~300 pagesDeliverables 1,3 and 4
* end of 2012 – formal publication early 2013
AD&I
Nick Walker - PAC, Prague
ILC Project Implementation Planning
• Contents• Executive Summary• Governance• Funding Models• Project Management• Host Responsibilities• Siting Issues• In-Kind Contribution Models• Industrialisation and Mass Production of the
SCRF Linac Components• Project Schedule• Future Technical Activities
14-Nov-11 PAC - Prague
Global Design Effort 18
14-Nov-11 PAC - Prague
Global Design Effort 19
Project Implementation Planning
14-Nov-11 PAC - Prague
Global Design Effort 20
(Global) Mass Production (SCRF)
• Critically important TDP2 activity
• Learn from XFEL experience• 5% ILC
• Learn from LHC experience
• Develop realistic models on which to base cost estimate
• With industry
TLCC-1
Global S1TDP-2
PIPGovernance
SCRF
14-Nov-11 PAC - Prague
Global Design Effort 21
14-Nov-11 PAC - Prague
Global Design Effort 22
19m x 14m ISO class-5 clean room
Chemical Polish room
KEK Industrial R&D Pilot Plant
Press machine
Triming machine
Electron Beam Welder
work together with industry to develop cost-effective cavity production techniques
– TDR – Post - TDR
Systems Tests
14-Nov-11 PAC - Prague
Global Design Effort 23
14-Nov-11 PAC - Prague
Global Design Effort 24
FLASH: Stability
• 15 consecutive studies shifts (120hrs), and with no downtime
• Time to restore 400us bunch-trains after beam-off studies: ~10mins
• Energy stability with beam loading over periods of hours: ~0.02%
• Individual cavity “tilts” equally stable
Energy stability over 3hrs with 4.5mA
~0.02% pk-pk
9 Feb 2011
14-Nov-11 PAC - Prague
Global Design Effort 25
Fermilab – NML SRF Schedule
14-Nov-11 PAC - Prague
Global Design Effort 26
KEK – STF Plans for Cryomodule Tests
14-Nov-11 PAC - Prague
Global Design Effort 27
– “Value Costs” - Plans and Scope– Comparisons with RDR costs
TDR Cost Estimate
14-Nov-11 PAC - Prague
Global Design Effort 28
TDR Cost estimate: Scope
• The cost estimate covers only the costs for the 500 GeV design as detailed in the TDR, to be expended during the 8 year construction period.
• Costs for project engineering and design, R&D prior to construction authorization, commissioning, pre-operation, operation, and de-commissioning are not included.
• Costs for upgrading the machine to 1 TeV are not included in the baseline estimate, except the cost of those systems which would be very difficult to provide after construction of the 500 GeV machine.
• An approximate cost for the 1 TeV upgrade will be provided separately.
04/20/23 ILC PAC 29
OECD PPP (Yen/USD)-annual average by year
EX-exchange rateGDP: PPP based on all goods/services in GDP of each regionM&E: PPP based on machinery and equipmentConst: PPP based on civil construction
Full PPP determinations were done for 2005 and 2008; other year points based on GDP inflation rates
14-Nov-11 PAC - Prague
Global Design Effort 30
PPP = Purchasing Power Parity
– Extending the energy of the ILC– Continued R&D – especially SCRF– Organization? (ILCSC)
Post TDR
14-Nov-11 PAC - Prague
Global Design Effort 31
14-Nov-11 PAC - Prague
Global Design Effort 32
CY
Technical Design Report completeBaseline established
2011 2012 2013 2014 20162010
ILC
2015
Technical design & R&D program
2017 2018
ILC possible timeline
SRF system tests
TDR reviews
Site EOI’s
Cost Estimating
Decision to proceed
Site/host established
Project Implementation Plan complete XFEL operation
LHC
Physics Run 1 Physics Run 2Interconnect repair
Existence of low-lying SUSY known
Higgs energy scale known
timegap
14-Nov-11 PAC - Prague
Global Design Effort 33
CY
Technical Design Report completeBaseline established
2011 2012 2013 2014 20162010
ILC
2015
Technical design & R&D program
2017 2018
ILC possible timeline
SRF system tests
TDR reviews
Site EOI’s
Cost Estimating
Decision to proceed
Site/host established
Project Implementation Plan complete XFEL operation
LHC
Physics Run 1 Physics Run 2Interconnect repair
Existence of low-lying SUSY known
Higgs energy scale known
timegap
14-Nov-11 PAC - Prague
Global Design Effort 34
Post – TDR (ILCSC)
• ICFA LC Parameters subcommittee (2003 and 2006)
14-Nov-11 PAC - Prague
Global Design Effort 35
Extending the reach of the ILC
Extending the reach of the ILC
• Upgrade option for study:
- Power < 300MW AC - New linac grad = 45 MV/m- Q0 = 2 1010
• Strawman TeV parameters
• Post-TDR program:•Improve cavity gradient•Cost effective production
• Flexibilty: Initial ILC energy: higher or lower energy, as informed by LHC results14-Nov-11 PAC - Prague
Global Design Effort 36
14-Nov-11 PAC - Prague
Global Design Effort 37
Post-TDR ILC Interim Goals & Organization• GDE will have successfully completed its mandate after TDR
& PIP delivered + reviewed (mid-2013 at latest + transition)
• What should follow GDE (mandate and organization) for an interim 3-5 year period? (ILCSC – Bagger)
• GDE position paper submitted to ILCSC Aug 2011. The paper addresses:– Technical Goals proposed for 2012+ program?
• Value engineering; Continued system demonstrations; Increasing energy reach; +
– Organizational Issues for 2012+ post GDE? • What are primary GDE assets that should be preserved?• What are the primary GDE weaknesses that should be improved?
• We must define what systems tests must demonstrate for each LC option before construction of a LC? ICFA??
Two Candidate Sites in Asia/Japan
- GDE-CFS group visited two sites,
Oct., 2011
Common Features
ILC-GDE PMs, 11-11-11 ILC Cavity Industrialization 39
Courtesy: M. Miyahara
Studies for 8 Cases of Tunnel Design
‘Bread Shape’ under Study
Cost-and time-effective in Japan
CFS Study: Progress in Japan
JFY Progress
2009 AAA volunteered to study ‘ILC tunnel design’ for SB2009,
2010 Local communities (LCs) organized geological survey by themselves.KEK studied 8 cases of the tunnel design, and reached a ‘Bread-shape (Kamaboko) shape tunnel’ to be an economical candidate, specifically, in Japanese mountainous regions.
2011 AAA re-volunteered to evaluate the tunnel design and environmental conditions, to assist KEK.LCs reported the geological survey to KEK.KEK going to progress the engineering work of tunneling, electrical, and mechanical issues, based on the information given by AAA and LCs, Japanese Civil Engineer Association is active to professionally assess the geological surveys and civil engineering.S&T Policy Council of the Cabinet received a brief report from MEXT on Sept. 1, on science objectives of the ILC project and global status.A Supplemental Budget being discussed at the Diet to encourage/boost recovery of national and regional activities. It may include some support for further site-dependent geological studies at the candidate sites in cooperation of KEK with the local communities (universities, and local Gov.)
14-Nov-11 PAC - Prague
Global Design Effort 43
Conclusions
• The major R&D milestones for TDR are essentially in-hand
• The Technical Design Report will be a self-contained comprehensive R&D report; with a design based on new baseline; a new value costing; and a section on project implementation planning
• We seek your advice / concurrence on our system tests goals and program