ARCH 2331BUILDING TECHNOLOGY II
Joist Layout Plans
Cite: "Passive House Blanden / HASA Architects" 26 Oct 2018. ArchDaily. Accessed 30 Oct 2018. <https://www.archdaily.com/904328/passive-house-blanden-hasa-architects/> ISSN 0719-8884
![Page 2: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/2.jpg)
Joist Layout Plan
![Page 3: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/3.jpg)
Graphic Guide to Frame Construction, Rob Thalon, Taunton Press
ELEMENTS OF A FLOOR SYSTEM
![Page 4: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/4.jpg)
Crushed stone drainage fill has been placed within this foundation wall of a full basement. The vapor barrier and a concrete slab will be added to provide the basement floor. Pockets to receive first floor beams have been blocked out at the top of the wall.
![Page 5: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/5.jpg)
Note, the lightwells in this photograph.
![Page 6: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/6.jpg)
A crawl space isolates the first floor wood platform from the earth and provides space for electrical and plumbing lines. A concrete "rat slab" has been poured over the vapor barrier. The headroom is just sufficient for a small person to stand up.
![Page 7: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/7.jpg)
TYPICAL WOOD FRAME CONSTRUCTION
![Page 8: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/8.jpg)
Graphic Guide to Frame Construction, Rob Thalon, Taunton Press
![Page 9: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/9.jpg)
STUD
SUBFLOOR
FLOOR JOIST
FOUNDATION WALL
ANCHOR BOLT
MINIMUM 8” TO 12” PER CODE
SLOPED GROUND SURFACE
SILL PLATE SEALER
MUDSILL (SILL PLATE)
RIM JOIST (HEADER)
SOLE PLATE
(BOTTOM PLATE)
![Page 10: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/10.jpg)
A double 2X6 sill has been secured with anchor bolts and the 2X10 floor joists - 16" o.c. are toe- nailed to them. A strip of sealant is seen between the wood and concrete. Back-filling is not done on the outside of the basement wall until the floor framing is in place to serve as bracing.
![Page 11: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/11.jpg)
Sill sealer being applied and pressed straight through the anchor bolts.
![Page 12: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/12.jpg)
![Page 13: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/13.jpg)
http
s://f
ours
even
five.
com
/i-jo
ist-
out
rigge
r-sm
art
-en
clos
ure-
ebo
ok/
![Page 14: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/14.jpg)
Graphic Guide to Frame Construction, Rob Thalon, Taunton Press
![Page 15: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/15.jpg)
This foundation wall is forming a crawl space. Porous gravel or crushed stone fill is placed on its floor to assure good drainage and a sheet plastic as a vapor barrier is laid on top. Steel beams may support the first floor wood joists.
![Page 16: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/16.jpg)
Graphic Guide to Frame Construction, Rob Thalon, Taunton Press
![Page 17: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/17.jpg)
![Page 18: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/18.jpg)
Plywood: Plywood subflooring should be installed with its long dimension and face grain perpendicular to the joists. Installing plywood with the subfloor parallel to the joists makes the flooring weaker.
http
://tr
easu
resf
rom
thea
ttic.
co/w
p-co
nte
nt/u
ploa
ds/2
018/
07/c
ost-
to-r
epla
ce-p
lyw
ood
-su
bflo
or-h
ow
-to
-fix
-an-
unev
en.jp
g
![Page 19: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/19.jpg)
Some of the interior support for the floor framing is provided by the CMU interior walls of the basement space. Beams made up of triple joists provide other support. Where a partition will fall parallel to the floor joists, and around an opening for a stairway, the joists are doubled.
![Page 20: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/20.jpg)
It is necessary to brace long joist at midspan against twisting or buckling. The method being used here is solid blocking with short pieces of floor joist. The blocking is staggered so that the pieces may be end nailed to the joists.
![Page 21: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/21.jpg)
Bu
ildin
g C
on
stru
ctio
n Il
lust
rate
d, 5
th E
diti
on
Fra
nci
s D
. K
. C
hin
g
![Page 22: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/22.jpg)
Graphic Guide to Frame Construction, Rob Thalon, Taunton Press
![Page 23: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/23.jpg)
![Page 24: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/24.jpg)
After the floor joist are in place plywood deck is installed on top of them. A mastic adhesive is gunned onto each joist just before the plywood is put down to increase the ridgity of the floor and to prevent squeaks.
![Page 25: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/25.jpg)
The plywood sheets form the subfloor of the house. The sheets are placed with their long dimension at right angles to the joists and their ends are supported at the mid-line of a joist. An air or electrically powered nailier is used for the nailing.
![Page 26: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/26.jpg)
![Page 27: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/27.jpg)
B Final\Perla_Ronald
In this preliminary layout, different bays have different joist spacing.
![Page 28: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/28.jpg)
Graphic Guide to Frame Construction, Rob Thalon, Taunton Press
![Page 29: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/29.jpg)
htt
p:/
/ww
w.a
fric
an
-cic
hlid
.com
/wo
od%
20d
efle
ctio
n.jp
g
![Page 30: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/30.jpg)
2015 IRC - International Residential Code for One and Two Family Dwellingshttps://codes.iccsafe.org/content/document/553?site_type=public
![Page 31: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/31.jpg)
http://www.fp-supply.com/st-louis-trusjoist-tji-i-joists.html
![Page 32: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/32.jpg)
Bu
ildin
g C
on
stru
ctio
n Il
lust
rate
d, 5
th E
diti
on
Fra
nci
s D
. K
. C
hin
g
![Page 33: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/33.jpg)
Graphic Guide to Frame Construction, Rob Thalon, Taunton Press
Half the class will design with TJI or engineered I Joists the other will design with Solid-Sawn Joists.
![Page 34: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/34.jpg)
Th
e A
rch
itect
's S
tud
io C
om
pa
nion
: Ru
les
of T
hu
mb
for
Pre
limin
ary
De
sign
by
Jose
ph
Ian
o, E
dw
ard
Alle
n
![Page 35: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/35.jpg)
Perla, Ronald BT2, 2018F
For next class:
• Joist Layout plan
• Joist layout Pinup
![Page 36: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/36.jpg)
Links: • American Wood Council (AWC)
https://awc.org/codes-standards/calculators-software/spancalc
• Forest Products Supplyhttp://www.fp-supply.com/st-louis-trusjoist-tji-i-joists.html
• The Engineered Wood Association (APA) Advanced Framing Guide
• Span Tables Tutorialhttps://www.awc.org/codes-standards/spantables/tutorial
![Page 37: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/37.jpg)
Floor Joist Spacing and Layouthttps://awc.org/codes-standards/calculators-software/spancalc
![Page 38: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/38.jpg)
http
s://
awc.
org
/cod
es-
sta
nda
rds/
calc
ulat
ors
-sof
twa
re/s
panc
alc
Assume:• Species: Douglas
Fir-Larch• Size: PER YOUR
DESIGN• Grade: No. 1 • Member Type:
Floor Joists • Deflection Limit: L/360• Spacing: 12” or 16” or 24” PER YOUR DESIGN• Live Load (psf): 40• Dead Load (psf): 20
![Page 39: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/39.jpg)
Floor Joist Spacing and Layout
•Forest Products Supplyhttp://www.fp-supply.com/st-louis-trusjoist-tji-i-joists.html
or TJI's
![Page 40: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/40.jpg)
Assume:• Deformation limit L/360• 40-psf live load • 20-psf dead load• 12” or 16” or 24”
![Page 41: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/41.jpg)
Be consistent on your project use only one size of TJI (110 or 210 joists)
![Page 42: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/42.jpg)
BT2 2019S Amir, Tasfia
![Page 43: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/43.jpg)
BT2 2019S Amir, Tasfia
![Page 44: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/44.jpg)
BT2 2019F Szpin, Hubert
![Page 45: 14 Joists 2020S PDF - openlab.citytech.cuny.edu](https://reader030.vdocuments.mx/reader030/viewer/2022041213/62511b9458533f4b2f5ffaec/html5/thumbnails/45.jpg)
Cite: "Passive House Blanden / HASA Architects" 26 Oct 2018. ArchDaily. Accessed 30 Oct 2018. <https://www.archdaily.com/904328/passive-house-blanden-hasa-architects/> ISSN 0719-8884