14 008 claps-nickel_test_dec_2013

2
Test Report No.BLR/H(RO)/13/001516 Dated 2013-11-27 Applicant SILENCE 2/1A MONOHAR PUKUE 2ND LANE KOLKATA-700029 : Shampa Bakshi : Attention Tested Sample Received on 2013-11-18 2:22 pm : Test Period : 2013-11-19 to 2013-11-27 Sample A:METAL PARTS CLAPS in Color : - Sample Description : Part No. 3000920 B : Buyer Name CTM ALTAMORERCATO : Addtional Info. SUPPLIER NAME: SILENCE : Objetives Of Examination To test Nickel Release as per EN 1811 : Note : The submitted Samples were not drawn by laboratory. Conclusion : Refer Results Sudhakar Bhat Authorized Signatory Das Sanjay Kumar Report Reviewer Authorised By Please contact : For any technical issues : Sudhakar Bhat at [email protected] For any complaint : Kaur, Ramjit at [email protected]. Note: The test report is electronically generated. Hence original signature is not required. Note : (1) General Terms & Conditions as mentioned overleaf, (2) The results relate only to the items tested, (3) the test report shall not be reproduced except in ful without the written approval of the laboratory (4) For details of the accredited scope, please contact laboratory or accreditation body website Regd. Office: TUV SUD South Asia Pvt. Ltd. Off Saki Vihar Road, Saki naka, Andheri (East), Mumbai-400072. India Phone :080 67458000 Fax :080 67458058 E-Mail :[email protected] Url : www.tuv-sud.in/softlines ControlNo:15310221.181113.005 Laboratory: TÜV SÜD South Asia Pvt. Ltd. No. A. 151, 2nd C Main, 2nd Stage, Peenya Industrial Estate, Bangalore - 560 058. India. BANGALORE-560058,Karnataka,India Page 1 of 2

Upload: valentina-follo

Post on 28-Jul-2015

12 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 14 008 claps-nickel_test_dec_2013

Test Report No.BLR/H(RO)/13/001516

Dated 2013-11-27

Applicant SILENCE

2/1A MONOHAR PUKUE 2ND LANE KOLKATA-700029

:

Shampa Bakshi:Attention

Tested Sample Received on 2013-11-18 2:22 pm:

Test Period : 2013-11-19 to 2013-11-27

Sample A:METAL PARTS CLAPS in Color : -Sample Description :

Part No. 3000920 B:

Buyer Name CTM ALTAMORERCATO:

Addtional Info. SUPPLIER NAME: SILENCE:

Objetives Of Examination To test Nickel Release as per EN 1811:

Note : The submitted Samples were not drawn by laboratory.

Conclusion : Refer Results

Sudhakar Bhat

Authorized Signatory

Das Sanjay Kumar

Report Reviewer

Authorised By

Please contact :

For any technical issues : Sudhakar Bhat at [email protected]

For any complaint : Kaur, Ramjit at [email protected].

Note: The test report is electronically generated. Hence original signature is not required.

Note : (1) General Terms & Conditions as mentioned overleaf, (2) The results relate only to the items tested, (3) the test report shall not be reproduced except

in ful without the written approval of the laboratory (4) For details of the accredited scope, please contact laboratory or accreditation body website

Regd. Office:

TUV SUD South Asia Pvt. Ltd.

Off Saki Vihar Road, Saki

naka, Andheri (East),

Mumbai-400072. India

Phone :080 67458000

Fax :080 67458058

E-Mail :[email protected]

Url : www.tuv-sud.in/softlines

ControlNo:15310221.181113.005

Laboratory:

TÜV SÜD South Asia Pvt. Ltd.

No. A. 151, 2nd C Main, 2nd Stage, Peenya Industrial

Estate, Bangalore - 560 058. India.

BANGALORE-560058,Karnataka,India Page 1 of 2

Page 2: 14 008 claps-nickel_test_dec_2013

Test Report No.BLR/H(RO)/13/001516

Dated 2013-11-27

Tests Subject Description:

MATERIAL DESCRIPTIONCODE NO. RESULTPHOTOGRAPHSAMPLE NO.

PASSA - METAL PARTS CLAPS

Test Result

NICKEL RELEASE

(EN 1811 : 2011, Nickel release is measured in metallic parts as per EN 1811 if the article is not coated. If the article is coated, the coating is

removed as per the procedure described in method EN 12472)

1.0

A

(µg/cm²/week)

Sample Details Claps

Area of Sample Tested (cm²) 6.10

Volume of the test solution used (ml) 7

Results (µg/cm²/week Not Detected

Compliance / Noncompliance Compliance

-

-

-

-

-

Limit Max.

Limit of Quantification: 0.05 µg/cm²/week

Requirement Limit:-

Migration limit 0.5 µg/cm²/week:

An article with prolonged contact skin will be deemed to be non-compliance when the nickel release value is greater than or

equal to 0.88 µg/cm²/week

Migration limit 0.2 µg/cm²/week

An article with pierced body contact & baby articles will be deemed to be non-compliance when the nickel release value is

greater than or equal to 0.35 µg/cm²/week

- END OF TEST REPORT-

Regd. Office:

TUV SUD South Asia Pvt. Ltd.

Off Saki Vihar Road, Saki

naka, Andheri (East),

Mumbai-400072. India

Phone :080 67458000

Fax :080 67458058

E-Mail :[email protected]

Url : www.tuv-sud.in/softlines

ControlNo:15310221.181113.005

Laboratory:

TÜV SÜD South Asia Pvt. Ltd.

No. A. 151, 2nd C Main, 2nd Stage, Peenya Industrial

Estate, Bangalore - 560 058. India.

BANGALORE-560058,Karnataka,India Page 2 of 2