+132.0m2 - 33.7m2 + 98.3m2 EC Operational Spares: Racks + shelves = 3.6m x 2.5m FPS drawings: 6m x 2.5m (move to 865 S- 412?) Additional space attribution in B865 (not yet approved)

Upload: beverley-anthony

Post on 17-Jan-2018

228 views

Category:

Documents


0 download

DESCRIPTION

EC software lab EC Lab. BEC Lab. CEC Lab. AEC Power Lab. EC Storage Mechanical workshop Conference Room Printers/ Photocopiers D D A EC Monitoring Room 19.9 SLSecretariat SLGL SL Production Office 3 FSU SL CAD Office Proposed TE-ABT distribution in B865 22

TRANSCRIPT

Page 1: +132.0m2 - 33.7m2 + 98.3m2 EC Operational Spares: Racks + shelves = 3.6m x 2.5m FPS drawings: 6m x 2.5m (move to 865 S-412?) Additional space attribution

+132.0m2 - 33.7m2+ 98.3m2

EC Operational Spares: Racks + shelves = 3.6m x 2.5mFPS drawings: 6m x 2.5m (move to 865 S-412?)

Additional space attribution in B865 (not yet approved)

Page 2: +132.0m2 - 33.7m2 + 98.3m2 EC Operational Spares: Racks + shelves = 3.6m x 2.5m FPS drawings: 6m x 2.5m (move to 865 S-412?) Additional space attribution

FPS Storage

EC software lab

EC software lab

EC Lab. B EC Lab. CEC Lab. AEC Power Lab.

EC Storage

Mechanical workshop

19.85

Conference Room

Printers/ Photocopiers

CAD Ofice

865 1-D

865 2-D

865 2-A

2 2 2 2 2 2 2 1 2 2 2 1 2 1 2 1 2 1 2 1

3 13 23 33 13 13 1

EC Monitoring

Room

SL Secretariat SLGL

2 2 2 1 2 2 2 2 2 1 2 2 2 1 2 2 2 2 2 2

SL

2 1

3 3 3 3 3 2 3 1 3 1 3 2 3 2

2 2 2 1 2 2 2 1 2 2 2 2 2 1 2 2 2 2 2 1

Production Office

3 FSU

SL CAD Office

Present TE-ABT distribution in B865

Page 3: +132.0m2 - 33.7m2 + 98.3m2 EC Operational Spares: Racks + shelves = 3.6m x 2.5m FPS drawings: 6m x 2.5m (move to 865 S-412?) Additional space attribution

EC software lab

EC software lab

EC Lab. B EC Lab. CEC Lab. AEC Power Lab.

EC Storage

Mechanical workshop

19.85

Conference Room

Printers/ Photocopiers

865 1-D

865 2-D

865 2-A

2 2 2 2 2 2 2 1 2 2 2 1 2 1 2 1 2 1 2 1

3 13 23 33 13 13 1

EC Monitoring

Room

19.9SL Secretariat SLGL

2 2 2 1 2 2 2 2 2 1 2 2 2 1 2 2 2 2 2 2

SL

2 1

3 3 3 3 3 2 3 1 3 1 3 2 3 2

2 2 2 1 2 2 2 1 2 2 2 1 2 2 2 2 2 1

Production Office

3 FSU

SL CAD Office

Proposed TE-ABT distribution in B865

2 2

Page 4: +132.0m2 - 33.7m2 + 98.3m2 EC Operational Spares: Racks + shelves = 3.6m x 2.5m FPS drawings: 6m x 2.5m (move to 865 S-412?) Additional space attribution

Proposed TE-ABT-EC reconfiguration in B865

EC Storage

Mechanical workshop

+componentstorage

2 2 2 1 2 2 2 2 2 1 2 2 2 1 2 2 2 2 2 2

SL

2-D30 2-D26 2-D24 2-D22 2-D18 2-D16 2-D12 2-D10 2-D06 2-D04

2-D17 2-D15 2-D13 2-D05 2-D03 2-D01

41.5 40.7 62.3

14.1 13.7 13.7 13.7 13.7 13.7 13.7 13.7 13.7 13.7 21.0 17.7

30.220.3

2-B01 2-B05

2-B02 2-B06

865 2-D

Returns,Repair and Calibration

HT Cage 1 HT Cage 2 HT Cage 3 HT Cage 4 HT Cage 5

FSU workshop

HT Buffer and stores

HT Lab 1HT Lab 2

System Spares

Electronics lab

bench Racks

She

lves

benchesCAD Office

4 4 CAD Office

2 2

2 1

3 new HT Test Cages with temporary equipment test bench storage

Operational equipment returns, repair and calibration

Operational Spares

Page 5: +132.0m2 - 33.7m2 + 98.3m2 EC Operational Spares: Racks + shelves = 3.6m x 2.5m FPS drawings: 6m x 2.5m (move to 865 S-412?) Additional space attribution

CAD Office1 x STAFF(1 x STD)

CAD Office1 x STAFF

CAD Office3 x FSU1 x TTE

CAD Office1 x STAFF1 x STD

17.7 m2 16.9 m2

32 m2

19.2 m2

4 4 2 2

2 1 2 1

Cupboard wall to ceiling(sliding doors)

Preferred Option,7 people in 2-B06 would be very tight considering the frequent visits and discussions in the CAD office (especially Remy and Patrick)

Page 6: +132.0m2 - 33.7m2 + 98.3m2 EC Operational Spares: Racks + shelves = 3.6m x 2.5m FPS drawings: 6m x 2.5m (move to 865 S-412?) Additional space attribution

35.2

CAD Office(Remy)

1 x STAFF(1 x STD)

CAD Office(Wim)

1 x STAFF

CAD Office(Stephane)

(Yves)(Gregory)

(Remi)3 x FSU1 x TTE

CAD Office(Patrick)(Lorena)1 x STAFF1 x STD

17.7 m2 16.9 m2

32 m2

19.2 m2

4 4 2 2

2 1 2 1

Cupboard wall to ceiling(sliding doors)

Preferred Option (with names), 7 people in 2-B06 would be very tight considering the frequent visits and discussions in the CAD office (especially Remy and Patrick)

Page 7: +132.0m2 - 33.7m2 + 98.3m2 EC Operational Spares: Racks + shelves = 3.6m x 2.5m FPS drawings: 6m x 2.5m (move to 865 S-412?) Additional space attribution

CAD Office1 x STAFF

CAD Office3 x FSU1 x TTE1 x STD

CAD Office2 x STAFF

16.9 m2

32 m2

19.2 m2

4 5 2 2

2 1

Cupboard wall to ceiling(sliding doors)

Alternative Option,7 people in 2-B06 would be too tight considering the frequent visits and discussions in the CAD office (especially Remy and Patrick)

Page 8: +132.0m2 - 33.7m2 + 98.3m2 EC Operational Spares: Racks + shelves = 3.6m x 2.5m FPS drawings: 6m x 2.5m (move to 865 S-412?) Additional space attribution

35.2

CAD Office(Wim)

1 x STAFF

CAD Office(Stephane)

(Yves)(Gregory)

(Remi)(Lorena)3 x FSU1 x TTE1 x STD

CAD Office(Patrick)(Remy)

2 x STAFF

16.9 m2

32 m2

19.2 m2

4 5 2 2

2 1

Cupboard wall to ceiling(sliding doors)

Alternative Option (with names),7 people in 2-B06 would be too tight considering the frequent visits and discussions in the CAD office (especially Remy and Patrick)

Page 9: +132.0m2 - 33.7m2 + 98.3m2 EC Operational Spares: Racks + shelves = 3.6m x 2.5m FPS drawings: 6m x 2.5m (move to 865 S-412?) Additional space attribution

6m x 7.5m

B355: LIU-PSB Montage a Blanc