T2PC Work Area (Designed by Others – Schedule TBA) Work Stream Task Start Date Finish Date WS01 Expanded Security Search May 13 Sep 13 WS02 Check In Reconfiguration May 13 Oct 13 WS03 HAL Accommodation May 13 Sep 13 WS04 Connections Jul 13 Dec 13 WS05 Adult Changing Places Jul 13 Sep 13 WS06 Sponsored Clocks (safeguarding) Jul 13 Sep 13 WS07 Children’s Play Area Aug 13 Oct 13 WS08 Engineering Ramp Accomm May 13 Sep 13 WS09 T2 Occupancy Scenario 9 May 13 Nov 13 WS10 Room with a View Jul 13 Sep 13 WS12 Arrivals Concourse Barrier Aug 13 Nov 13 WS14 Fixed Posts – Coaching Gates Aug 13 Nov 13 WS15 CIP Lounges MEP Services May 13 Aug 13 WS16 Fast Track Arrivals Sep 13 Nov 13 WS17 Onward Travel Information Zone Sep 13 Jan 14 WS20 Delivery of Orientation Zones Mar 14 May 14 WS21 Airside Smoking Area Jan 14 Mar 14 WS22 Concourse Space (WDF) May 13 Jun 13 WS23 Dock Managers Office Jul 13 Jul 13 WS24 Upgrade Spaces (IDL) Jan 14 Jun 14 WS25 LEPC Monitoring Oct 13 Jun 14 WS26 Metering Oct 13 Jun 14 WS27 Self-boarding Dec 13 Jun 14 T2A Level 30 – Departures T2 Programme Change 2b 2b 2a 1d 1c 1b 3 2b 2b 2b 2b 10 3 20 2b 2a 2b 2a 2a 2a 2a 2a 9 9 T2PC Work Area Occupancy Work Area 1a 20 2 2 2 2 12142-XX-TS-XXX-000166 Version 1.0 N Fowler Author: Date: 12-Dec-12 Drg No: Title: T2A Programme Change - Phasing Drawings

Upload: simon-de-ath

Post on 11-Aug-2015

117 views

Category:

Documents


0 download

TRANSCRIPT

T2PC Work Area (Designed by Others – Schedule TBA)

Work Stream

Task Start Date

Finish Date

WS01 Expanded Security Search May 13 Sep 13

WS02 Check In Reconfiguration May 13 Oct 13

WS03 HAL Accommodation May 13 Sep 13

WS04 Connections Jul 13 Dec 13

WS05 Adult Changing Places Jul 13 Sep 13

WS06 Sponsored Clocks (safeguarding) Jul 13 Sep 13

WS07 Children’s Play Area Aug 13 Oct 13

WS08 Engineering Ramp Accomm May 13 Sep 13

WS09 T2 Occupancy Scenario 9 May 13 Nov 13

WS10 Room with a View Jul 13 Sep 13

WS12 Arrivals Concourse Barrier Aug 13 Nov 13

WS14 Fixed Posts – Coaching Gates Aug 13 Nov 13

WS15 CIP Lounges MEP Services May 13 Aug 13

WS16 Fast Track Arrivals Sep 13 Nov 13

WS17 Onward Travel Information Zone Sep 13 Jan 14

WS20 Delivery of Orientation Zones Mar 14 May 14

WS21 Airside Smoking Area Jan 14 Mar 14

WS22 Concourse Space (WDF) May 13 Jun 13

WS23 Dock Managers Office Jul 13 Jul 13

WS24 Upgrade Spaces (IDL) Jan 14 Jun 14

WS25 LEPC Monitoring Oct 13 Jun 14

WS26 Metering Oct 13 Jun 14

WS27 Self-boarding Dec 13 Jun 14

T2A Level 30 – Departures T2 Programme Change

2b

2b

2a

1d

1c

1b

32b

2b

2b

2b

10

3

20

2b

2a

2b

2a

2a

2a

2a

2a

9

9

T2PC Work Area

Occupancy Work Area

1a20

2

2

2

2

12142-XX-TS-XXX-000166 Version 1.0N FowlerAuthor: Date:

12-Dec-12Drg No:

Title:

T2A Programme Change - Phasing Drawings

Work Stream

Task Start Date

Finish Date

WS01 Expanded Security Search May 13 Sep 13

WS02 Check In Reconfiguration May 13 Oct 13

WS03 HAL Accommodation May 13 Sep 13

WS04 Connections Jul 13 Dec 13

WS05 Adult Changing Places Jul 13 Sep 13

WS06 Sponsored Clocks (safeguarding) Jul 13 Sep 13

WS07 Children’s Play Area Aug 13 Oct 13

WS08 Engineering Ramp Accomm May 13 Sep 13

WS09 T2 Occupancy Scenario 9 May 13 Nov 13

WS10 Room with a View Jul 13 Sep 13

WS12 Arrivals Concourse Barrier Aug 13 Nov 13

WS14 Fixed Posts – Coaching Gates Aug 13 Nov 13

WS15 CIP Lounges MEP Services May 13 Aug 13

WS16 Fast Track Arrivals Sep 13 Nov 13

WS17 Onward Travel Information Zone Sep 13 Jan 14

WS20 Delivery of Orientation Zones Mar 14 May 14

WS21 Airside Smoking Area Jan 14 Mar 14

WS22 Concourse Space (WDF) May 13 Jun 13

WS23 Dock Managers Office Jul 13 Jul 13

WS24 Upgrade Spaces (IDL) Jan 14 Jun 14

WS25 LEPC Monitoring Oct 13 Jun 14

WS26 Metering Oct 13 Jun 14

WS27 Self-boarding Dec 13 Jun 14

7

154

5

5

24

T2A Level 20 – Gates

20

20

22

T2 Programme Change

T2PC Work Area (Designed by Others – Provisional Dates)

T2PC Work Area

Occupancy Work Area

12142-XX-TS-XXX-000166 Version 1.0N FowlerAuthor: Date:

12-Dec-12Drg No:

Title:

T2A Programme Change - Phasing Drawings

Work Stream

Task Start Date

Finish Date

WS01 Expanded Security Search May 13 Sep 13

WS02 Check In Reconfiguration May 13 Oct 13

WS03 HAL Accommodation May 13 Sep 13

WS04 Connections Jul 13 Dec 13

WS05 Adult Changing Places Jul 13 Sep 13

WS06 Sponsored Clocks (safeguarding) Jul 13 Sep 13

WS07 Children’s Play Area Aug 13 Oct 13

WS08 Engineering Ramp Accomm May 13 Sep 13

WS09 T2 Occupancy Scenario 9 May 13 Nov 13

WS10 Room with a View Jul 13 Sep 13

WS12 Arrivals Concourse Barrier Aug 13 Nov 13

WS14 Fixed Posts – Coaching Gates Aug 13 Nov 13

WS15 CIP Lounges MEP Services May 13 Aug 13

WS16 Fast Track Arrivals Sep 13 Nov 13

WS17 Onward Travel Information Zone Sep 13 Jan 14

WS20 Delivery of Orientation Zones Mar 14 May 14

WS21 Airside Smoking Area Jan 14 Mar 14

WS22 Concourse Space (WDF) May 13 Jun 13

WS23 Dock Managers Office Jul 13 Jul 13

WS24 Upgrade Spaces (IDL) Jan 14 Jun 14

WS25 LEPC Monitoring Oct 13 Jun 14

WS26 Metering Oct 13 Jun 14

WS27 Self-boarding Dec 13 Jun 14

3

4

3

3

12

15

17

16

T2A Level 10 – Arrivals

17

17

T2 Programme Change

T2PC Work Area (Designed by Others – Provisional Dates)

T2PC Work Area

Occupancy Work Area

12142-XX-TS-XXX-000166 Version 1.0N FowlerAuthor: Date:

12-Dec-12Drg No:

Title:

T2A Programme Change - Phasing Drawings

Work Stream

Task Start Date

Finish Date

WS01 Expanded Security Search May 13 Sep 13

WS02 Check In Reconfiguration May 13 Oct 13

WS03 HAL Accommodation May 13 Sep 13

WS04 Connections Jul 13 Dec 13

WS05 Adult Changing Places Jul 13 Sep 13

WS06 Sponsored Clocks (safeguarding) Jul 13 Sep 13

WS07 Children’s Play Area Aug 13 Oct 13

WS08 Engineering Ramp Accomm May 13 Sep 13

WS09 T2 Occupancy Scenario 9 May 13 Nov 13

WS10 Room with a View Jul 13 Sep 13

WS12 Arrivals Concourse Barrier Aug 13 Nov 13

WS14 Fixed Posts – Coaching Gates Aug 13 Nov 13

WS15 CIP Lounges MEP Services May 13 Aug 13

WS16 Fast Track Arrivals Sep 13 Nov 13

WS17 Onward Travel Information Zone Sep 13 Jan 14

WS20 Delivery of Orientation Zones Mar 14 May 14

WS21 Airside Smoking Area Jan 14 Mar 14

WS22 Concourse Space (WDF) May 13 Jun 13

WS23 Dock Managers Office Jul 13 Jul 13

WS24 Upgrade Spaces (IDL) Jan 14 Jun 14

WS25 LEPC Monitoring Oct 13 Jun 14

WS26 Metering Oct 13 Jun 14

WS27 Self-boarding Dec 13 Jun 14

8

14

9

9

9

T2A Level 0 – Apron

23

14

T2 Programme Change

14

T2PC Work Area (Designed by Others – Provisional Dates)

T2PC Work Area

Occupancy Work Area

12142-XX-TS-XXX-000166 Version 1.0N FowlerAuthor: Date:

12-Dec-12Drg No:

Title:

T2A Programme Change - Phasing Drawings

Work Stream

Task Start Date

Finish Date

WS01 Expanded Security Search May 13 Sep 13

WS02 Check In Reconfiguration May 13 Oct 13

WS03 HAL Accommodation May 13 Sep 13

WS04 Connections Jul 13 Dec 13

WS05 Adult Changing Places Jul 13 Sep 13

WS06 Sponsored Clocks (safeguarding) Jul 13 Sep 13

WS07 Children’s Play Area Aug 13 Oct 13

WS08 Engineering Ramp Accomm May 13 Sep 13

WS09 T2 Occupancy Scenario 9 May 13 Nov 13

WS10 Room with a View Jul 13 Sep 13

WS12 Arrivals Concourse Barrier Aug 13 Nov 13

WS14 Fixed Posts – Coaching Gates Aug 13 Nov 13

WS15 CIP Lounges MEP Services May 13 Aug 13

WS16 Fast Track Arrivals Sep 13 Nov 13

WS17 Onward Travel Information Zone Sep 13 Jan 14

WS20 Delivery of Orientation Zones Mar 14 May 14

WS21 Airside Smoking Area Jan 14 Mar 14

WS22 Concourse Space (WDF) May 13 Jun 13

WS23 Dock Managers Office Jul 13 Jul 13

WS24 Upgrade Spaces (IDL) Jan 14 Jun 14

WS25 LEPC Monitoring Oct 13 Jun 14

WS26 Metering Oct 13 Jun 14

WS27 Self-boarding Dec 13 Jun 14

3

3

3

T2A Level A0 – Lower Apron T2 Programme Change

T2PC Work Area (Designed by Others – Provisional Dates)

T2PC Work Area

Occupancy Work Area

12142-XX-TS-XXX-000166 Version 1.0N FowlerAuthor: Date:

12-Dec-12Drg No:

Title:

T2A Programme Change - Phasing Drawings