12 month report on wp2: tsunami source characterisation nearest 12 month meeting marrakech, october...
TRANSCRIPT
12 Month Report on 12 Month Report on WP2: WP2:
Tsunami source Tsunami source characterisationcharacterisation
Nearest 12 Month MeetingNearest 12 Month Meeting Marrakech, October 25-26, 2007
WP Leader:
Overall objective
Characterisation of the tsunami source areas based on definition of the seismic structure to relate earthquake and tectonic structures, specially deep decollement surfaces
Starting point
State of knowledge concerning location, geometry and characteristics of main active, potentially tsunamigenic faults identified in the area based on WP1 tectonic map.
Existing data : MCS legacy data acquired in the last ~15 years in the area (especially IAM, Rifano, SISMAR, and SWIM)
Nearest 12 Month MeetingNearest 12 Month Meeting Marrakech, October 25-26, 2007Objective and starting
pointObjective
Workplan
Progress
General
Task 2.1
Task 2.2
Task 2.3
Planning Y2
WP3
(1) Mapping deep crustal and upper mantle structure to test geodynamic models;
(2) Determining crustal-scale geometry of main fault surfaces accommodating plate convergence;
(3) Relocating local seismicity that will be recorded in WP3, relate earthquake activity and tectonic strain;
(4) Constraining physical properties of structural domains and tectonic features.
Goals
Workplan
1) Re-process key MCS profiles across most relevant structures until pre-stack depth migration;
2) Acquire, process and model new WAS data along “some” profiles combining OBS and landstations.
Nearest 12 Month MeetingNearest 12 Month Meeting Marrakech, October 25-26, 2007Workplan and
goalsObjective
Workplan
Progress
General
Task 2.1
Task 2.2
Task 2.3
Planning Y2
WP3
Nearest 12 Month MeetingNearest 12 Month Meeting Marrakech, October 25-26, 2007Progress towards
objectivesMeetings:
BARTOLOMÉ, R., GRÀCIA, E., RUBIO, E., DAÑOBEITIA, J.J., TERRINHA, P., AND SWIM-2006 CRUISE PARTY, (2006). New multichannel seismic data imaging of the western part of Gulf of Cádiz (SW Iberian Margin): The SWIM-2006 cruise. Third EUROMARGINS Conference, Bologna (Italia), 4-7 October (Poster).
MARTÍNEZ, S., GRÀCIA, E., BARTOLOMÉ, R., TERRINHA, P., BIROUK, A., DAÑOBEITIA, J.J., SALLARÈS, V., and SWIM-06 CRUISE PARTY (2007). Tectonics of the Coral Patch Ridge area and adjacent Horseshoe and Seine Abyssal Plains (Gulf of Cadiz) based on new multichannel seismic data. 1st Moroccan Association of Petroleum Geologists Conference, Marrakech (Morocco), 28-31 October.
Staff:
• A graduate student (Sara Martínez) hired @CSIC to realize a PhD thesis on SWIM MCS/Nearest WAS data
• A graduate student (Sergi Ventosa) hired @CSIC to develop signal processing filters adapted to WAS data
• A post-doc will be hired @UBO to work with Nearest MCS/WAS data (?)
Objective
Workplan
Progress
General
Task 2.1
Task 2.2
Task 2.3
Planning Y2
WP3
Task 2.1 Reprocessing and pre-stack depth migration of existing MCS data
Nearest 12 Month MeetingNearest 12 Month Meeting Marrakech, October 25-26, 2007
2006 Kickoff Meeting: Pre-selected key profiles from IAM, Rifano,
SISMAR, SWIM to be (re-)processed until PSDM
Objective
Workplan
Progress
General
Task 2.1
Task 2.2
Task 2.3
Planning Y2
WP3
CSIC personnel: E. Gràcia, S. Martínez R. Bartolomé, V. Sallarès
Progress towards objectives
SWIM-SWIM-20062006
SurveySurvey
Nearest 12 Month MeetingNearest 12 Month Meeting Marrakech, October 25-26, 2007
• CSIC concentrated on SWIM-06 data acquired in June 2006 (PI E. Gràcia). RB, SM have pre-processed 16 profiles
Task 2.1 Activities
• SM focused on SW08-SW16 across the Coral Patch Ridge and active structures of Seine and Horseshoe Abyssal plains• RB focused on SW01-SW07 crossing the Horseshoe fault to the accretionary wedge and lineation 1
Objective
Workplan
Progress
General
Task 2.1
Task 2.2
Task 2.3
Planning Y2
WP3
Progress towards objectives
Objective
Workplan
Progress
General
Task 2.1
Task 2.2
Task 2.3
Planning Y2
WP3
Nearest 12 Month MeetingNearest 12 Month Meeting Marrakech, October 25-26, 2007
Task 2.1 Activities• 4 profiles have been selected for PSDM : SW2, SW7, SW13, SW16
•This is being done now in Geomar within EU-LSF program
Progress towards objectives
Nearest 12 Month MeetingNearest 12 Month Meeting Marrakech, October 25-26, 2007
Task 2.1 ActivitiesUniversité de Bretagne Occidentale (UBO) :
• Providing a database of processed and time-migrated MCS lines of Sismar and DelSis surveys. Three were PSDM (Sis-4, Sis-16 and Sis-22)
•Providing HR (Chirp) data from the DelSis survey ;
•Acquire and provide new HR (sparker) data on the SW Spanish and NW Moroccan platforms (July-Aug 2007, NOMADS cruise, PI P. Leroy)
Other?
Objective
Workplan
Progress
General
Task 2.1
Task 2.2
Task 2.3
Planning Y2
WP3
Progress towards objectives
Nearest 12 Month MeetingNearest 12 Month Meeting Marrakech, October 25-26, 2007
Task 2.1 Barchart
Task\Month 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36
Task 2.1 Provisional
D4
Task 2.1 Actual
D4
D4 : Prestack depth-migrated MCS profiles
Ok for CSIC on SWIM
Objective
Workplan
Progress
General
Task 2.1
Task 2.2
Task 2.3
WP3
Progress towards objectives
Nearest 12 Month MeetingNearest 12 Month Meeting Marrakech, October 25-26, 2007
Task 2.2 Wide-angle reflection/refraction acquisition experiment
•Application for R/V Hesperides and funding from Spanish agencies for a WAS cruise sent in August 2006
Acquisition of three ~200 km WAS lines with ~25 OBS•Application granted in November 2006 and dates confirmed in May 2007
18 days: between Oct 16th and Nov 2nd, 2008
Nearest-Seis Nearest-Seis 20082008
SurveySurvey
Objective
Workplan
Progress
General
Task 2.1
Task 2.2
Task 2.3
Planning Y2
WP3
CSIC personnel: E. Gràcia, S. Martínez, S.Ventosa, R. Bartolomé, V. Sallarès
Progress towards objectives
Nearest 12 Month MeetingNearest 12 Month Meeting Marrakech, October 25-26, 2007Progress towards
objectives
(1) Application for 20 Geomar OBS
(60 deployments) sent to EU-LSF in May 2007
Failed : money runout
Task 2.2 Activities
Getting Getting OBS?OBS?
(2) Bid to acquire Spanish OBS pool started in February 2007
Ok : 17 Scripps L-Cheapo SP OBS should be ready (?) by June 2008
Nearest-Seis Nearest-Seis 20082008
SurveySurvey
(3) UBO applied for UBO/Ifremer OBS
Ok : 7 UBO + 17 Ifremer MicrOBS reserved for Nearest-Seis…
But… budget for insurance, shipping, technicians is lacking!
Objective
Workplan
Progress
General
Task 2.1
Task 2.2
Task 2.3
WP3
Nearest 12 Month MeetingNearest 12 Month Meeting Marrakech, October 25-26, 2007
(4) Possibility of renting Geomar (or GeoPro) OBS explored
20 OBS/60 deploy cost ~120 k€
Task 2.2 Activities
Getting Getting OBS?OBS?
Nearest-Seis Nearest-Seis 20082008
SurveySurvey
(5) Possibility for sharing rental expenses with Geomar explored
Add scientific value to Nearest:
go into FWT in one profile (?)(6) Other (ex. FCUL)?
Objective
Workplan
Progress
General
Task 2.1
Task 2.2
Task 2.3
Planning Y2
WP3
Progress towards objectives
Nearest 12 Month MeetingNearest 12 Month Meeting Marrakech, October 25-26, 2007
Task 2.2 Barchart
Task\Month 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36
Task 2.2 Provisional
D5 M3
Task 2.2 Actual
D5 M3
D5 : Cruise report
M3 : End of processing and experiments at sea
Objective
Workplan
Progress
General
Task 2.1
Task 2.2
Task 2.3
Planning Y2
WP3
Progress towards objectives
Nearest 12 Month MeetingNearest 12 Month Meeting Marrakech, October 25-26, 2007
Task 2.3 Processing, modelling and interpretation of wide-angle seismic dataActivity
Barchart
Task\Month 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36
Task 2.3 Provisional
D6M4
Task 2.3 Actual
D6M4
D6: Velocity and density models
M4: End of OBS modelling
Sergi Ventosa developed two filters (polarization and lateral coherency-based) to enhance S/N in WAS data
Objective
Workplan
Progress
General
Task 2.1
Task 2.2
Task 2.3
Planning Y2
WP3
Progress towards objectives
Nearest 12 Month MeetingNearest 12 Month Meeting Marrakech, October 25-26, 2007
Objective
Workplan
Progress
General
Task 2.1
Task 2.2
Task 2.3
Planning Y2
WP3
Planning Year 2
Activitiy summary table
2.1 A0 Interpretaton of SWIM MCS profiles
CSIC (E.Gracia, V. Sallares)
From November 2007 on
2.2 A1 Close inventory of OBS available for cruise
CSIC (V. Sallares) UBO (M.-A. Gutscher)ISMAR (N. Zitellini)FCUL (L. Matias)
March 2008
2.1 A2 End of PSDM migration of MCS data
CSIC (E.Gracia, V. Sallares)UBO (M.-A. Gutscher)ISMAR(?)
April 2008
2.1 A3 Collection of PSDM migrated MCS profiles
CSIC (E.Gracia, V. Sallares)UBO (M.-A. Gutscher)ISMAR(?)
May 2008
2.2 A4 Final discusion/decision on Nearest-Seis WAS profiles and personnel involved in the cruise
CSIC (E.Gracia, V. Sallares) UBO (M.-A. Gutscher)ISMAR (N. Zitellini)FCUL (L. Matias)
May 2008
2.2 A5 Analysis of SISMAR OBS data
CSIC (V. Sallares) June 2008
2.2 A6 Source design for Nearest-Seis
CSIC (V. Sallares) July 2008
2.2 A7 Preparation/testing of material for Nearest-Seis survey
CSIC (V. Sallares) September 2008
2.2 A8 Nearest-Seis survey CSIC (V. Sallares) October 2008
Nearest 12 Month MeetingNearest 12 Month Meeting Marrakech, October 25-26, 2007
Objective
Workplan
Progress
General
Task 2.1
Task 2.2
Task 2.3
Planning Y2
WP3
Planning Year 2
Critical aspects :
• Selection of PSDM profiles must be closed. CSIC > SWIM, UBO > SISMAR. What about Rifano and IAM?• We must ensure having enough OBS to perform the experiment (minimum 20; ideal 40). • Preferable not having many different types > logistical complications, limited spacing• WAS profiles must be selected
Possible obstacles :
• Not having (enough) OBS.• Poor acquisition results (weather conditions, other...)
Special notes :
•We propose to organize the next (18 month) meeting next May in Barcelona to discuss about cruise planning
Nearest 12 Month MeetingNearest 12 Month Meeting Marrakech, October 25-26, 2007
Objective
Workplan
Progress
General
Task 2.1
Task 2.2
Task 2.3
Planning Y2
WP3
1) Meeting with TopoIberia team leader J. Gallart (CSIC-Barcelona), who is deploying a BB network in SW Iberia
Sharing data recorded by BB OBS (Nearest) and landstation (TopoIberia) networks?
CSIC WP3 Activities
WP3
CSIC WP3 Activities
Nearest 12 Month MeetingNearest 12 Month Meeting Marrakech, October 25-26, 2007
2) Participated in MVSEIS MCS survey with 4.5 km streamer of L’Atalante (IP L. Somoza) in September 2007 to ensure shooting over BB network
Not allowed to go North from 36º!
WP3
Objective
Workplan
Progress
General
Task 2.1
Task 2.2
Task 2.3
Planning Y2
WP3