 11th Street Bridge Project Washington, D.C. 45 th  Mid-Atlantic Quality Assurancee Workshop Dover, Delaware February 7 th , 2012 Ravindra Ganvir P .E. (DDOT) Peter McDono ugh P .E. (HNTB)

Upload: anacostiawaterfront

Post on 20-Jul-2015

569 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 1/40

11th Street Bridge ProjectWashington, D.C.

45th Mid-Atlantic Quality Assurancee WorkshopDover, Delaware February 7th, 2012

Ravindra Ganvir P.E. (DDOT) Peter McDonough P.E. (HNTB)

Page 2: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 2/40

Ronaldo T. “Nick” Nicholson, P.E. 

Chief Engineer

District Department of Transportation

Email: [email protected] 

Phone: 202.671.4691

Contacts / Presenters

Ravindra Ganvir, P.E.Deputy Chief Engineer

District Department of Transportation

Email: [email protected] Phone: 202.671.4689

Peter McDonough, P.E.11th Street Project Manager

HNTB Corporation

Email: [email protected] Phone: 202.484.2330

Page 3: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 3/40

•Director: Terry Bellamy

•Deputy Director/Chief Engineer: Ronaldo T. “Nick” Nicholson 

•Celebrating its 10th Anniversary in May 2012.

•Officially split from the Department of Public Works on May 21,2002.

•FY11 Operating Budget $103.6 Million

•FY11 Capital Budget $151.1Million

•950 Employees

Page 4: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 4/40

Anacostia Waterfront Initiative (AWI)“World-Class Waterfront Development” 

• 11th StreetBridges

• South CapitolStreet

• Riverwalk Trail• Streetcar

Page 5: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 5/40

Anacostia Waterfront Initiative (AWI)

• Restore: A clean and active river.

• Connect: Eliminating barriers and gaining access.

• Play: A great riverfront park system.

• Celebrate: Cultural destinations of distinct character.

• Live: Building strong waterfront neighborhoods.

Page 6: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 6/40

• EIS Proposed Cost:

$459 million• Funds available:$300 million

Design/Build to Budget11th Street Project

Page 7: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 7/40

Financing and Revenues

•  Federally Funded w/ Local Match (83/17)

• DDOT funds derived from general obligation bonds.

• Federal funds derived from federal discretionary and program funds(National Highway System, Bridge Replacement, Surface Transportation

Program and Interstate Maintenance funds,)

• GARVEE bond proceeds. Debt service on the GARVEE bonds iseligible for reimbursement from federal program funds.

Page 8: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 8/40

11th Street ProjectGenesis

11th Street Bridges over Anacostia River Constructed Mid-1960s

Final Environmental Impact Statement Signed September 2007

Record of Decision Signed July 2008

Interchange Justification Report Approved December 2008

Design-Builder Selected (5 Bidders) April 2009

Notice to Proceed July 2009

Start Construction December 2009

Phase I Completion July 2013

Project Completion (Anticipated) September 2015

Page 9: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 9/40

Existing 11th Street Bridge

•Functionally Deficient

•Built in the 1960s

Page 10: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 10/40

Key 11th Street Bridge Project Elements

•New freeway connections(commuters / community)

•Multimodal local bridges.

•Provide additionalevacuation route fromNation’s Capitol

•Environmentalinvestments

Page 11: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 11/40

Design/Build to Budget11th Street Project Goals

1. Budget - Deliver the corridor improvements with the total constructionbudget of $260 million.

2. Mobility - Maximize the potential to support multiple modes oftransportation on the local bridge.

3. Schedule - Meet or beat the construction completion date of July 13,2013.

4. Maintenance of Traffic - Maximize accessibility and mobility duringconstruction.

5. Public Information - Provide timely and accurate informationregarding project progress and activities to the public.

Page 12: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 12/40

Design/Build to Budget Design/Build

Scope Goals Based 30% Plans

Risk AllocationManagement

Set Contract Amount Contingencies

Standards and

SpecificationsIndustry Standards Owner standards/specs

Innovation Anything’s on the table Standard agreements,

environmental commitments

Procurement Process

Page 13: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 13/40

Proposer 1Rehab/Reuse Existing StructuresProject Terminus – O Street

Proposer 2

Rehab/Reuse Existing StructuresProject Terminus – N/M Street

Design/Build to Budget11th Street Proposals

Page 14: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 14/40

Design/Build to Budget11th Street Proposals

Proposer 3Rehab/Reuse Existing StructuresProject Terminus – O/NStreet

Proposer 4

All New StructuresProject Terminus – N/M Street

Page 15: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 15/40

Design-Build to Budget11th Street Best Value

**All New Structures**Project Terminus SE/SW

Freeway

Winning Proposal

Page 16: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 16/40

Design/Build to Budget11th Street Bridge Project Success

• Challenging - Environmental commitments

• Innovative - Ability to utilize any DOT standards approved by FHWA

• Creative - 149 Total Alternative Technical Concepts

• Risk taking - Winning proposal had 42 Total ATC’s. 

• Cost efficient - 80% of the Traffic Movements for 60% of the cost.

Page 17: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 17/40

Alternative Technical Concepts(ATCs)

• Procurement process allowed and encouragedproposer to include ATCs.

• ATCs to provide innovative solutions.• ATCs limited to those already reviewed by FHWA

(standards from state departments of transportation).

Page 18: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 18/40

Project Plan

T il D i d E i t l

Page 19: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 19/40

Trail, Drainage and EnvironmentalInvestments

Page 20: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 20/40

Multi-modal Transportation Options

Page 21: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 21/40

River Bridges -Typical Section

View North

Page 22: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 22/40

Construction – River Pier Typical Section

• 5 Spans, 4 river Piersper Bridge

•Piers have 3 to 6

Hollow Concrete

Cylinder Piles

• Piles are driven about70 feet into river bed

CylinderPiles

Strut

Pier Cap

Structuralsteel

Bridge Deck

Water Line

Page 23: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 23/40

Quality Process – Audit Log

Page 24: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 24/40

Quality Process – Audit Report

Page 25: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 25/40

Quality Process – Non Conformance Report (NCR)

Page 26: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 26/40

• 11th Street CommunityCommunications Committee(11CCC)

• Advisory NeighborhoodCommissions (ANCs)

• Local Community Organizations

• Navy Yard• National Park Service (NPS)• Quarterly newsletter

Public Outreach

Page 27: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 27/40

Partnering – Phasing Innovations

Page 28: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 28/40

Lessons Learned

1. Work identified as “By Others” needs to be scheduled and coordinated with

proposed contractual work.

2. Scale of work in D.C. with regards to Batch Plants/Materials/Urban Environment.

3. Conduct thorough subsurface utility investigations. Including test pitting andfield verifications.

4. Thoroughly review proposal documents. Understanding different terms havevarying interpretations. E.g. “Limit of Work” is not “Limit of Project”. 

5. Work committed by the owner shall be addressed as soon as possible.

6. Materials provided “By Others” shall be approved by all agencies. 

7. Clearly define maintenance within the project limit.

Page 29: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 29/40

Construction Progress

1 t Q t 2010

Page 30: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 30/40

1st Quarter 2010River Bridge Construction

2nd Q t 2010

Page 31: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 31/40

2nd Quarter 2010River Bridge Construction

3rd Q t 2010

Page 32: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 32/40

3rd Quarter 2010River Bridge Construction

4th Q arter 2010

Page 33: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 33/40

4th Quarter 2010River Bridge Construction

1st Quarter 2011

Page 34: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 34/40

1st Quarter 2011River Bridge Construction

2nd Quarter 2011

Page 35: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 35/40

2nd Quarter 2011River Bridge Construction

3rd Quarter 2011

Page 36: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 36/40

3rd Quarter 2011River Bridge Construction

4th Quarter 2011

Page 37: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 37/40

4th Quarter 2011River Bridge Construction

Inbound Freeway Bridge Opening

Page 38: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 38/40

Inbound Freeway Bridge OpeningDecember 18th 2011

Outbound 11th Street Freeway Bridge Opened

Page 39: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 39/40

Outbound 11th Street Freeway Bridge OpenedJanuary 7th 2012

Page 40: 11th Street Bridge Project Delaware Workshop 02-07-12

5/16/2018 11th Street Bridge Project Delaware Workshop 02-07-12 - slidepdf.com

http://slidepdf.com/reader/full/11th-street-bridge-project-delaware-workshop-02-07-12 40/40

Questions?