7/25/2019 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909 http://slidepdf.com/reader/full/11c8972-00-ic-spc-1909-criteria-to-015-jh-1909 1/9 M WorleyParsons €rsNomicS resources & energy KUWAIT OIL COMPANY 1 1 C8972-00-|C-SPC-1 909 Rev 0 22, June2012 LOWER FARS HEAVY OIL DEVELOPMENT FEED WorleyParsons Canada Services Ltd. Calgary Division Heavy Oil Business Unit 54o - 12' Avenue SW Calgary, Alberta T2R OH4 Telephone; (403) 508-5300 Facsimile: (403)508-5301 www.worleyparsons.com ABN 61 001 279812 @ Copyrlght 2010 WorleyParsons :ffi Addendum To KOG Specification lnstrumentation For Packaged Equipment (015-JH-î909) ,/'

Upload: mihal

Post on 24-Feb-2018

233 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909

7/25/2019 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909

http://slidepdf.com/reader/full/11c8972-00-ic-spc-1909-criteria-to-015-jh-1909 1/9

M

WorleyParsons

€rsNomicS

resources &

energy

KUWAIT OIL

COMPANY

1 1

C8972-00-|C-SPC-1

909 Rev 0

22,

June2012

LOWER

FARS

HEAVY OIL

DEVELOPMENT

FEED

WorleyParsons Canada Services Ltd.

Calgary

Division

Heavy Oil Business

Unit

54o

-

12'

Avenue SW

Calgary,

Alberta

T2R

OH4

Telephone;

(403)

508-5300

Facsimile:

(403)508-5301

www.worleyparsons.com

ABN

61 001 279812

@

Copyrlght

2010

WorleyParsons

:ffi

Addendum

To

KOG

Specification

lnstrumentation

For

Packaged Equipment

(015-JH-î909)

,/'

Page 2: 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909

7/25/2019 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909

http://slidepdf.com/reader/full/11c8972-00-ic-spc-1909-criteria-to-015-jh-1909 2/9

M

WorleyParsons

frcnNomicS

resources

&.energy

KUWAITOIL GOMPANY

LOWER

FARS HEAVY

OIL DEVELOPMENT

ADDENÐUM

TO KOC

SPEC¡F¡CATION

TNSTRUMENTATION

FOR

PACKAGED

EQUIPMENT

(01

5-JH-1

909)

SYNOPSIS

This

document

presents

the

Addendum

to KOC Specification,

lnstrumentation For

Packaged

Equipment

(015-JH-1909) for

the

Kuwait

Oil

Company

Lower Fars

Heavy

Oil Development

Feed Project.

Disclaimer

This

document

is

conceptual

in nature

and

represents the

work

of

WorleyParsons

pertormed

to recognized

engineering

principtes

and

practices

appropriate

for

conceptual

engineering

work

and

the

terms

of reference

provided

by

WorleyParsons' contractual

Customer, Kuwait

Oil Company

(the'Customer').

Thís

document

may

not be

relied

upon for detailed implementation

or any

other

purpose

not specifically

identified

within

this

document.

This

document

is confidential

and

prepared

solely for

the use

of

the

Customer. The

contents

of this

document

may

not

be

used or

retied upon by

any

party

other than

the

Customer,

and

neither WorleyParsons,

ifs

sub

consultants

nor their

respective employees

assurne

any liability

for

any

reason,

including, but

not

timited to,

negligence, to any other

party

for

any information

or

representatìon

herein.

The extent of any

wananty or

guarantee

of this

documant

or the

information contained therein

in favour

of

the

Customer

is

timited

to the

warranty or

guarantee,

if any,

contained

in

the contract

between

the

Customer

and

WorleyParsons.

DOC.

NO.11

909 Rev

0

Addendum

to

JH-1909.doc

ffi

REV DESCRIFTION

11C8972-00-|C-SPG1909

Rev 0

Addsdum

io

JH-'1909.doc

c06123t2012

ORIGINATOR

REVIEW

WORLEYPARSONS

APPROVAL

CLIENT

OATE

APPROVAL

DATE

A

B

Pago

2 of

9

Jå i J,o--

ecr rê¡l lôr lnfoimâliôn

JnÐn12

G.

Ellaschuk

/.

-

Sêrcmlth

qc[êd fôr Ann6vC

.lù1 10

2(n2

 

Þrrmêll

D

Pumâll

. Ellaschuk. Sêxsmlth

ssu6d for Rsvlôw

MA

h2Ê

20Jt

lq<,rÂd fôr

en¡'arl

(ìhtrl

rb3

tvl

.

Tallsr

 

Sâxsñ¡lh

ù

Page 3: 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909

7/25/2019 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909

http://slidepdf.com/reader/full/11c8972-00-ic-spc-1909-criteria-to-015-jh-1909 3/9

WorleyParsons

resources & energy

KUWAIT OIL

COMPANY

LOWER

FARS

HEAVY OIL

DEVELOPMENT

ADDENDUM

TO

KOC SPECIFICATION

ffic*NomicS

TNSTRUMENTATION

FOR

PACKAGEÐ

EQUIPMENT

(01

5-JH-1909)

This addendum

shall apply to

KOC

Specification

lnstrumentation of

Packaged

Equipment

(015-JHre0e):

Section

1.0

-

SCOPE

Sectlon

1.3:

¡

Renumber

the third

paragraph

as

1.3

Section

2.0

-

STANDARD

SPEGIFICATIONS

Sub-Section 2.2.1:

r

Change 2.2.1

to

2.'l.1

¡

Delete the

following

references

to the

superseded

KOC specifications:

015-AH-1001

Basic Design

Criteria

015-AH-1002

lnternationalCodes

and Standards

015-JH-1901

lnstrument

Engineering

Basic Data

015-JH-1902

lnstrument

Ðesign

015-JH-1905

Emergency

Shutdown

Panel

015-JH-1904

Distributed

ControlSystems

015-JH-1906

Fire and Gas

Panol

015-JH-1907

Motor-Operated

Valves

015-JH-1908

lnstrument

lnstallation

015-JH-1912

lnstrument

Cables

015-KH-1902

Spare

Parts

and Maintenance

Requirements

015-NH-1104

Plant Equipment

Noise Control

015-UH-1001

Packing,

Marking and

Documentation

015-XH-1005

Shop and

Field Painting

015-YH-1001

Fire and

Gas

Detection Equipment

1

1CSS72{0jC-SPC-1909

R€v

0 Add€ndum

to

JH-1909.doc

Pag€ 3

of

I

*

t-

.v

o

z

06t2312012

r/¿

Page 4: 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909

7/25/2019 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909

http://slidepdf.com/reader/full/11c8972-00-ic-spc-1909-criteria-to-015-jh-1909 4/9

M

WorleyParsons

resources

energy

KUWAIT

OIL

COMPANY

LOWER FARS HEAVY

OIL DEVELOPMENT

ADDENDUM TO

KOC SPECIFICATION

ËesNomicS

INSTRUMENTATION

FOR PACKAGED

EQUIPMENT

(O

15-JH-1909)

Add the

following references

to

the updated

KOC standards:

KOC-|-001

KOC Standard

for lnstrumentation

and

Control System

Design

KOC-|-002

KOC Standard

for

lnstrument

lnstallation

KOC-I-005

KOC Recommended Practise

for

Fire

and Gas System

Panels

KOC-¡-004

KOC Standard

for

Shutdown

Systems

KOC-I-010

KOC

Standard

for

Control

and Shutdown

Valves

KOC-|-O11

KOC Standard

for

lnstrument Cables

KOC-|-O17

KOC-I-O17

KOG

Recommended

Practicefor

lmplementation

of Safety

lnstrumented

Functions

KOC-G-004

KOC

Standard

for

Packing,

Marking

and

Documentation

KOC-G-007

KOC Standard

for

Basic Design

Data

KOC-G-009

KOC Standard

for Spare

Parts and

Maintenance

Data

KOC-G-012

KOC Standard

for

Plant Equipment

ldentification,

Nameplates

and Pipeline

Markers

KOC-P-001

KOC

Standard

for

Painting and Coating

of

External

MetalSurfaces

KOC-L-006

KOC Standard

for

Fire

and Gas Detection

Equipment

KOC-L-030

KOC Standard

for Plant and

Equipment

Noise Control

KOC-E-O13

KOC

Standard

for Motor

Operated

Valve

Actuators

Add

the

following

project

specifications:

11C8972-'10-IC-SPC-001

ControlSystemSpecification

11C8972-00-|C-SPC-0001

Project Specific

Criteria to

KOC Standard

for

I nstrumentation

and Co

ntrol

System

Design

(KOC-|-001

)

11C8972-00-|C-SPC-0004

Project Specific

Criteria to KOC

Standard

for

Shutdown

Systems

(KOC-l-004)

'11C8972-00-|C-SPC.1g09

Rev 0

Addendum lo

JHl909.doc

Pago

4

ot

9

a

a

c08t2u2012

8a3s

rft

Page 5: 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909

7/25/2019 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909

http://slidepdf.com/reader/full/11c8972-00-ic-spc-1909-criteria-to-015-jh-1909 5/9

M

llUorleyParsons

ücçNomicS

m

esources & energy

KUWAIT

OIL COMPANY

LOWER

FARS

HEAVY OIL DEVELOPMENT

ADDENDUM

TO

KOC SPEC¡FICATION

TNSTRUMENTATION

FOR

PAC

KAGED

EQUIPMENT

(0

r

5-JH-1 909)

1 1 C897

2-00-rC-S

PC-00

1

0

1 1

C8972-00-lC-SPC-001

1

1

1

C8972-00-¡C-SPC-1

903

I 1 C8972-00-IC-SPC-1

91

1

1 1 C8972-00-EL-SPC-001

9

Project Specific

Criteria to

KOC

Standard

for Control

and Shutdown

Valves

(KOC-I-O10)

Project

Specific Criteria

to

KOC Standard

for lnstrument

Cables

(KOC-I-011)

Addendum to KOC Specification for General lnstruments

(015.JH-1903)

Addendum

to

KOC Specification

for Standard

Auxiliary

Control

Room Cabinets

(015-JH-191

1)

Project

Specifíc

Criteria to

KOC Standard

for Motor

Operated

Valve Actuators

(KOC-E-O1

3)

Section

2.2:

Revíse to:

A non-inclusive

list of

applicable codes

and standards

is

to be

found

in

the

Engineering

Group

Specification

entitled

KOC

Standard

for

lnstrumentation

and

Control System

Design

(KOC-|-OO1).

Sectlon

2.5:

o

Add a new

item:

ln any document

where

reference

is made to a

KOC specification

or standard,

then the

reference automatically

includes the

content

of

the

respective

addendum

or

project

specific

criteria

for that specification

or standard.

Sectign

3.0

-

SERVICE

GONDITIONS

Section 3.2:

Revise

to:

lnstrument

systems

shall

in all

respects be

suitable for continuous

operation

in

the service

conditions stated

in

the

Engineering

Group

Specification

entitled

KOC

Standard

for

Basic

Design

Data

(KOC-G-007).

I

1

C807240lC.SPC-1909

Rov 0

Add€rìdum

to

JH-1

909.doo

c

0612312012

Page

5 of

I

a

a

*

z

tr

o

ú

(,

r/t

Page 6: 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909

7/25/2019 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909

http://slidepdf.com/reader/full/11c8972-00-ic-spc-1909-criteria-to-015-jh-1909 6/9

WorleyParsons

resources

& energy

ficoNomicS

ffi

KUWAIT

OIL

COMPANY

LOWER

FARS

HEAVY

OIL DEVELOPMENT

ADDENDUM

TO

KOC

SPECIF¡CATION

r

NSTRUMENTATION

FOR

PACKAGED EQUIPMENT

(01

5.rH-l

909)

Section

4.0

-

BASIC

ENGINEERING

REQUIREMEIIITS

Sub-Section

4.1.4:

Section

4.2:

o

Replace

DCS'and

SSLS

with PCS'throughout

this

section

Sub-Section

4.2.1:

Sub-Section

4.2.2:

Sub-Section

4.2.4:

Add

Section 4.1.4 and

the following

statement:

All material and equipment shall be new and certified as such. lnstrumentation and control

system shall

be

fully

assembled,

píped

and wired.

lnstruments that

require

field installation

and items

that were

removed and

shipped

loose

shall

be

identified

on the drawings,

packing

lists,

and on the item

itself.

Revise the

first

paragraph

as

follows:

Whenever

practical,

KOC requires

the

Process Control System

(PCS)

to carry

out

Start-Up/Shut-Down

functions

(other

than safety

functions), analogue

control,

status and

alarm

displays.

a

Change:

Engineering

Group

Specification entitled

lnstrument

Design

(Number

015.1H-1902)

to

KOC

Standard

for

lnstrumentation

and Control

System

Design

(KOC-I'001).

a

Item

b) Replace:

 Emergency Shutdown

Panel

(Number

015-JH-1905)

with

KOC

Standard

for Shutdown

Systems

(KOC-l-004I'.

Add

the

following

sentences:

A

redundant network

connection

to the

PCS shall be

provided.

Protocol must

be specified

and

approved

by KOC. Selected

shall

preserve

order of

incident time stamping.

Psgo

6 ot

I

a

1 1

C8972-00-|C-SPC-1909

Rev 0

Addendum

to

JH-1909.doc

c0612u2012

z

*

o

ú

,f

Ct

rft

Page 7: 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909

7/25/2019 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909

http://slidepdf.com/reader/full/11c8972-00-ic-spc-1909-criteria-to-015-jh-1909 7/9

M

WorleyParsons

6cnNomicS

resources

&

energy

KUWAIT OIL COMPANY

LOWER

FARS HEAVY OIL

DEVELOPMENT

ADDENDUM

TO

KOC

SPECIFICATION

INSTRUMENTATION

FOR

PACKAGED

EQUIPMENT

(01

5.JH.1

909)

Programming,

configuration,

programming

tool, software

and licenses shall

be

provided.

All

packaged

equipment

safety

loops must

meet SIL

requirements and be

in

compliance

with

KOC Recommended Practice

for

lmplementation

of Safety

lnstrumented

Functions

(srF)

(Koc-r-017)'.

lnputs

to shutdown

system shall be

from analogue

transmitters.

Sub-Section

4.2.5:

r

ltem a)

Add the following

sentences:

A network

connection shall

be

provided.

Protocol

must be specified

and

approved

by KOC.

Programming, configuration,

programming

tool, software and

licenses shall be

provided.

Sub-Section

4.3.1:

.

Add the

following sentence:

All

on-skid

inslrumentation

shall be

provided

in

accordance

with KOC Standards

and

Specifications

KOC-I-001,

KOC-I-002,

KOC-I-011,

01

5-JH-1903.

All

on-skid controlvalves

shall be

provided

in accordance

with KOC

standard

KOC

Standard

for Control and

Shutdown

Valves

(KOC-I-O10) .

All instrument and control

valve

process

conneclions shall conform

to the

piping

specification.

Section

5.0

-

CONSTRUGTION

REQUIREMENTS

Section 5.2:

Replace with:

The

tag numbering

system

for

the

package

will be

dictated by the

project.

All instruments

on the

package

P&lD shall be allocated

a tag

number

in

accordance

with

the

same

procedure

used

for the

main facility.

ffi

a

74

Psgo

7

of

I

*

z

R

11c8972{0lc-sPcr909

Rev

0 Add€ndum

to

JH{909.doc

cút23t2012

d¿

Page 8: 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909

7/25/2019 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909

http://slidepdf.com/reader/full/11c8972-00-ic-spc-1909-criteria-to-015-jh-1909 8/9

WorleyParsons

€rnNomicS

resources & energy

KUWAITOIL COMPANY

LOWER

FARS

HEAVY

OIL DEVELOPMENT

AODENDUM

TO

KOC

SPECIFICATION

TNSTRUMENTATION

FOR

PACKAGED

EQUIPMENT

(01

5-JH-1 909)

Sub-Sectlon

5.3.2:

Sub-Sectlon

5.3.3:

Sectlon 5.5:

Sub-Section

5.5.2:

Section

6.0

-

PERFORMANGE

REQUIREMENTS

Sub-Section

6.3.3:

a

Replace:

 lnstrument

lnstallation

(Number

015-JH-1908)

with KOC

Standard for

lnstrument

lnstallatíon

(KOC-l-002)

a

Replace:

 lnstrument lnstallation

(Number

015-JH-1908)

with

KOC

Standard

for lnstrument

lnstallation

(KOC-l-002)'

1 ltem

(a)

Replace:

 lnstrument

lnstallation

(Number

015-JH-1908)

with'KOC

Standard

for lnstrument

lnstallation

(KOC-l-002)

a

Item

(d)

Rewrite:

The

Contractor

shall

provide plant

equipment

identification

for

each

instrument as

per

KOC

Standard for Plant

Equipment ldentification,

Nameplates and

Pipeline Markers

(KOC-G-O12).

The

Contractor

shall

manufacture and fit tag bearing the allocated

numbers

to each instrument.

Item

(f.)

Replace:

 Shop

and

Field Painting

(Number

015-XH-1005)'with

KOC

Standard for Painting and

Coating of

External Metal Surfaces

(KOC-P-001)

Page

I

ofg

a

o

'f

*

z

d

o

ú

1

1C8972 00JC-SPG1909

Rev 0

Addendum

to

JH-1909.doc

c06t2u2012

&

Page 9: 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909

7/25/2019 11C8972-00-IC-SPC-1909- Criteria to 015-JH-1909

http://slidepdf.com/reader/full/11c8972-00-ic-spc-1909-criteria-to-015-jh-1909 9/9

M

WorleyParsons

GcsNomicS

,m

resources

& energy

KUWAITOIL

GOMPANY

LOWER

FARS

HEAVY OIL

DEVELOPMENT

ADDENDUM TO

KOC SPECIFIGATION

TNSTRUMENTATTON

FOR

PACKAGED

EQUIPMENT

(0

r

5-JH-1 909)

Section

7.0

-

PACKING.

MARKING

AND

DOGUMENTATION

r

Replace:

 Packing, Marking

and

Documentation

(Number

015-UH-1001)

with

KOC

Standard

for

Packing, Marking

and

Documentation

(KOC-G-004)'

Section

8.0

-

SPARE PARTS

AND MAINTENANCE

REQUIREMENTS

Replace:

 Spare Parts and

Maintenance

Requirements

(Number

015-KH-1902)

with

KOC

Standard

for

Spare

Parts

and Maintenance

Data

(KOC-G-009)

a

1

1C8972{0-|C-SPC-1909

Rev 0

Addendum to JH-1gog.doc

c06l23l2a12

*

z

f

o

ú

(,

Poge

9 of

I