1DB ProjektBau GmbH, 01.06.2008
EFRTC General Meeting,Berlin 20th November 2009
DB ProjektBau GmbH CompanyConsulting Planning Construction
Major railway infrastructure projects at DB I.BV-O-PDr. Katharina Klemt-Albert
DB ProjektBau GmbH
20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
2/38
2DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
EFRTC General Meeting, Berlin
Agenda
1. The Company DB ProjektBauOverview
2. Logistics concept for Berlin
3. ABS Berlin - Frankfurt/Oder, Oderbrcke (Oder-bridge)
a) Berlin Hauptbahnhof (Berlin central station)
b) The new Ostkreuz
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
3/38
3
EFRTC General Meeting, Berlin
Agenda
1. The Company DB ProjektBauOverview
2. Logistics concept for Berlin
3. ABS Berlin - Frankfurt/Oder, Oderbrcke (Oder-bridge)
a) Berlin Hauptbahnhof (Berlin central station)
b) The new Ostkreuz
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
4/38
4
1. The Company Facts and Figures
Foundation of DB AGs project management serviceprovider on 1 January 2003
Bundling of railway engineering know-how:competence in planning, project management andconstruction supervision
All services from a single provider, from conceptualplanning through to project completion
Consulting - planning - construction
for projects of all sizes and for all transportationroutes
Projects for the future, for customer-friendly andenvironmentally compatible mobility
Total project costs 3,2 bill. thereof construction costs 2,6 bill.
Number of projects 4.647thereof number of major projects 28
Employees 3.721
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
5/38
5
Talbrcke Froschgrundsee, VDE 8.1
Stuttgart 21
Terminals (for commercial transport)
Planning
- Major projects- Railway transportation routes- Bridges, tunnels, support constructions- Passenger transport facilities- Terminals (for commercial transport)
- Roads, railway crossings, ring roads- Railway control centres, safety facilities for railway crossings- Factories, plants, depots- Landscape planning, environment protection
1. The Company DB ProjektBau project handling from one source
Projectmanagement
Constructionsupervision
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
6/38
6
With decentralisedstructure, straight tothe customer!
7 Regional units
1. The Company DB ProjektBau office locations
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
7/38
7
Civil engineeringstructures
Passenger transportfacilities
Terminals (forcommercial transport)
1. The Company Range of products
Railway transportationroutes
Roads, overpasses,ring roads
Safety facilities forrailway crossings
Plants, factories,depots
Noise remediation,environmentprotection
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
8/38
8
EFRTC General Meeting, Berlin
Agenda
1. The Company DB ProjektBauOverview
2. Logistics concept for Berlin
3. ABS Berlin - Frankfurt/Oder, Oderbrcke (Oderbridge)
a) Berlin Hauptbahnhof (Berlin central station)
b) The new Ostkreuz
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
9/38
9
2a) Berlin Hauptbahnhof (Berlin central station) Opening Ceremony, 26.05.2006
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
10/38
10
Significant contents:
Station Gesundbrunnen Berlin Hauptbahnhof (Lehrter Bf) Station Potsdamer Platz Station Sdkreuz (Papestrae) North-south-connection
(Tiergartentunnel) Construction of the underground
railway line U5 and rapid-transit lineS21
East-west connection (city railway)
Considerable decrease of the travel time from / to Berlin
Considerable decrease of the time needed to change train connectionsComfortable travelling due to of modern train stations
Targets:
Frankfurt (O)Warschau
Hannover
StralsundBf. Gesund-
brunnen
Bf. Ostkreuz
Bf. Sdkreuz(Papestrae)
Bf. Spandau
Bf. Westkreuz
Bf. ZooBerlin Hbf.(Lehrter Bf.)
Ostbf.
LeipzigMnchen Dresden
Dessau
Magdeburg
Hamburg
2a) Berlin Hauptbahnhof (Berlin central station) The mushroom concept
Customising the railwayinfrastructure to upcoming
requirements
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
11/38
11
BerlinHbf.
Hamburg
Hannover
Frankfurt a. M.
Erfurt Leipzig
Mnchen
4:03
1:30
4:12 1:34
3:297:43
3:45
Development of travel time1990Schedule 2009
2:301:50
1:07
8:30
5:52
2:20
2:10
Dresden
Stralsund3:20
2:40
Rostock2:54
2:03
2a) Berlin Hauptbahnhof (Berlin central station) Target reduce travel time
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
12/38
12
Hauptbahnhof(central station)
S-Bf Lehrter Bahnhof
BfGesund-
brunnen
BerlinHaupt-bahnhof
PotsdamerPlatz
Berlin BfSdkreuz
2a) Berlin Hauptbahnhof (Berlin central station) From the past to the present
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
13/38
13
Diversion of the river Spree
Caisson
Initial excavation pit for a shield machine
2a) Berlin Hauptbahnhof (Berlin central station) Construction site sections
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
14/38
14
Wall sole building method
Aerial view 1998
2a) Berlin Hauptbahnhof (Berlin central station) Method of construction
groutinganchor
retainingwall
slotted wall uplifting anchor
Underwater concrete floor Pump off ground water tunnel
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
15/38
15
2a) Berlin Hauptbahnhof (Berlin central station) Aerial view 2002
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
16/38
16
2a) Berlin Hauptbahnhof (Berlin central station) Excavation 2004
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
17/38
17
Flap bridge of the Beam Buildings 2005
Movement of north south roof
2a) Berlin Hauptbahnhof (Berlin central station) State of construction 2005
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
18/38
18
Estimated travellers and visitors daily 300.000Total floor-space approx. 70.000 mTotal industrial real estate approx. 15.000 mParking spaces for cars approx. 900Long-distance traffic daily 164 trainsRegional rail traffic daily 324 trainsRapid-transit railway daily 616 trainsConcrete 500.000 mSteel 85.000 t
Escalators 54Elevators 43
Panorama-elevators 6Solar cells 2.700 mLength of the staion concourse north-south 160 mLength of the station concourse east-west 321 mHeight of the Beam Buildings 46 m
2a) Berlin Hauptbahnhof (Berlin central station) Facts and Figures
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
19/38
19
EFRTC General Meeting, BerlinAgenda
1. The Company DB ProjektBauOverview
2. Logistics concept for Berlin
3. ABS Berlin - Frankfurt/Oder, Oderbrcke (Oder-bridge)
a) Berlin Hauptbahnhof (Berlin central station)
b) The new Ostkreuz
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
20/38
20
Berlin Ostkreuz, 2007
2b) The new Ostkreuz Facts and Figures
Ostkreuz after the reconstruction,With new platforms for the regionalrail traffic (simulation), 2016
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
21/38
2121
2b) The new Ostkreuz Start of construction
Project costs 432,1 mill.
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
22/38
2b) The new Ostkreuz The advantages for the customer
In the future also trains of the regionalrail traffic can stop at Ostkreuz
Barrier-free and convenient access(for everyone)
Accessible from all parts of the city
Protection against wind and weather
Better orientation when changing to
other trains
Tram connection close to the station
The old charm of Ostkreuz will stillremain after the reconstruction
Overview of the 7 advantages of the new station:
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
23/38
23
2b) The new Ostkreuz State of construction in September 2008
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
24/38
24
2b) The new Ostkreuz State of construction in November 2008
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
25/38
2525
2b) The new Ostkreuz Aerial view, 13.01.2009
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
26/38
2b) The new Ostkreuz State of construction in September/October 2009
DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
27/38
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
28/38
3. ABS Berlin Frankfurt/Oder, Oderbrcke (Oder-bridge) Old Oderbrcke
28DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
29/38
PL
O d er
O d r a
N
D1951 1900 1900 1900 1900 1951
1925 1925 1925 1925 1925 1925
1870/ 1946
1951 1951 1900
1925 1925 1951
1870/ 1946
1951
1870/ 1946
1870/ 1946
1870/ 1946
1870/ 1946
1870/ 1946
1870/ 1946
1870/ 1946
1870/ 1967
1870/ 1946
Caption:Numbers = Date of commissioninge
X X
X X Track Polen Germany closed
3. ABS Berlin Frankfurt/Oder, Oderbrcke (Oder-bridge) Age of the segments from the bridge
29DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
30/38
3. ABS Berlin Frankfurt/Oder, Oderbrcke (Oder-bridge) Transport links
30DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
31/38
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
32/38
3. ABS Berlin Frankfurt/Oder, Oderbrcke (Oder-bridge) Installation of the auxiliary bridge
32DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
New building railway bridge across the river Oder, removal of the old bridge, foundation for piles
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
33/38
3. ABS Berlin Frankfurt/Oder, Oderbrcke (Oder-bridge) Vorlandbrcke (Vorlandbridge)
33DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
34/38
3. ABS Berlin Frankfurt/Oder, Oderbrcke (Oder-bridge) Swim out of the old bridge
34DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
35/38
3. ABS Berlin Frankfurt/Oder, Oderbrcke (Oder-bridge) New bridge
35DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
36/38
3. ABS Berlin Frankfurt/Oder, Oderbrcke (Oder-bridge) Swim in of the new bridge
36DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
37/38
-
8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final
38/38
Thank you for your attention
38DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009