    1DB ProjektBau GmbH, 01.06.2008

    EFRTC General Meeting,Berlin 20th November 2009

    DB ProjektBau GmbH CompanyConsulting Planning Construction

    Major railway infrastructure projects at DB I.BV-O-PDr. Katharina Klemt-Albert

    DB ProjektBau GmbH

    20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    2/38

    2DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

    EFRTC General Meeting, Berlin

    Agenda

    1. The Company DB ProjektBauOverview

    2. Logistics concept for Berlin

    3. ABS Berlin - Frankfurt/Oder, Oderbrcke (Oder-bridge)

    a) Berlin Hauptbahnhof (Berlin central station)

    b) The new Ostkreuz

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    3/38

    3

    EFRTC General Meeting, Berlin

    Agenda

    1. The Company DB ProjektBauOverview

    2. Logistics concept for Berlin

    3. ABS Berlin - Frankfurt/Oder, Oderbrcke (Oder-bridge)

    a) Berlin Hauptbahnhof (Berlin central station)

    b) The new Ostkreuz

    DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    4/38

    4

    1. The Company Facts and Figures

    Foundation of DB AGs project management serviceprovider on 1 January 2003

    Bundling of railway engineering know-how:competence in planning, project management andconstruction supervision

    All services from a single provider, from conceptualplanning through to project completion

    Consulting - planning - construction

    for projects of all sizes and for all transportationroutes

    Projects for the future, for customer-friendly andenvironmentally compatible mobility

    Total project costs 3,2 bill. thereof construction costs 2,6 bill.

    Number of projects 4.647thereof number of major projects 28

    Employees 3.721

    DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    5/38

    5

    Talbrcke Froschgrundsee, VDE 8.1

    Stuttgart 21

    Terminals (for commercial transport)

    Planning

    - Major projects- Railway transportation routes- Bridges, tunnels, support constructions- Passenger transport facilities- Terminals (for commercial transport)

    - Roads, railway crossings, ring roads- Railway control centres, safety facilities for railway crossings- Factories, plants, depots- Landscape planning, environment protection

    1. The Company DB ProjektBau project handling from one source

    Projectmanagement

    Constructionsupervision

    DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    6/38

    6

    With decentralisedstructure, straight tothe customer!

    7 Regional units

    1. The Company DB ProjektBau office locations

    DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    7/38

    7

    Civil engineeringstructures

    Passenger transportfacilities

    Terminals (forcommercial transport)

    1. The Company Range of products

    Railway transportationroutes

    Roads, overpasses,ring roads

    Safety facilities forrailway crossings

    Plants, factories,depots

    Noise remediation,environmentprotection

    DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    8/38

    8

    EFRTC General Meeting, Berlin

    Agenda

    1. The Company DB ProjektBauOverview

    2. Logistics concept for Berlin

    3. ABS Berlin - Frankfurt/Oder, Oderbrcke (Oderbridge)

    a) Berlin Hauptbahnhof (Berlin central station)

    b) The new Ostkreuz

    DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    9/38

    9

    2a) Berlin Hauptbahnhof (Berlin central station) Opening Ceremony, 26.05.2006

    DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    10/38

    10

    Significant contents:

    Station Gesundbrunnen Berlin Hauptbahnhof (Lehrter Bf) Station Potsdamer Platz Station Sdkreuz (Papestrae) North-south-connection

    (Tiergartentunnel) Construction of the underground

    railway line U5 and rapid-transit lineS21

    East-west connection (city railway)

    Considerable decrease of the travel time from / to Berlin

    Considerable decrease of the time needed to change train connectionsComfortable travelling due to of modern train stations

    Targets:

    Frankfurt (O)Warschau

    Hannover

    StralsundBf. Gesund-

    brunnen

    Bf. Ostkreuz

    Bf. Sdkreuz(Papestrae)

    Bf. Spandau

    Bf. Westkreuz

    Bf. ZooBerlin Hbf.(Lehrter Bf.)

    Ostbf.

    LeipzigMnchen Dresden

    Dessau

    Magdeburg

    Hamburg

    2a) Berlin Hauptbahnhof (Berlin central station) The mushroom concept

    Customising the railwayinfrastructure to upcoming

    requirements

    DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    11/38

    11

    BerlinHbf.

    Hamburg

    Hannover

    Frankfurt a. M.

    Erfurt Leipzig

    Mnchen

    4:03

    1:30

    4:12 1:34

    3:297:43

    3:45

    Development of travel time1990Schedule 2009

    2:301:50

    1:07

    8:30

    5:52

    2:20

    2:10

    Dresden

    Stralsund3:20

    2:40

    Rostock2:54

    2:03

    2a) Berlin Hauptbahnhof (Berlin central station) Target reduce travel time

    DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    12/38

    12

    Hauptbahnhof(central station)

    S-Bf Lehrter Bahnhof

    BfGesund-

    brunnen

    BerlinHaupt-bahnhof

    PotsdamerPlatz

    Berlin BfSdkreuz

    2a) Berlin Hauptbahnhof (Berlin central station) From the past to the present

    DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    13/38

    13

    Diversion of the river Spree

    Caisson

    Initial excavation pit for a shield machine

    2a) Berlin Hauptbahnhof (Berlin central station) Construction site sections

    DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    14/38

    14

    Wall sole building method

    Aerial view 1998

    2a) Berlin Hauptbahnhof (Berlin central station) Method of construction

    groutinganchor

    retainingwall

    slotted wall uplifting anchor

    Underwater concrete floor Pump off ground water tunnel

    DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    15/38

    15

    2a) Berlin Hauptbahnhof (Berlin central station) Aerial view 2002

    DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    16/38

    16

    2a) Berlin Hauptbahnhof (Berlin central station) Excavation 2004

    DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    17/38

    17

    Flap bridge of the Beam Buildings 2005

    Movement of north south roof

    2a) Berlin Hauptbahnhof (Berlin central station) State of construction 2005

    DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    18/38

    18

    Estimated travellers and visitors daily 300.000Total floor-space approx. 70.000 mTotal industrial real estate approx. 15.000 mParking spaces for cars approx. 900Long-distance traffic daily 164 trainsRegional rail traffic daily 324 trainsRapid-transit railway daily 616 trainsConcrete 500.000 mSteel 85.000 t

    Escalators 54Elevators 43

    Panorama-elevators 6Solar cells 2.700 mLength of the staion concourse north-south 160 mLength of the station concourse east-west 321 mHeight of the Beam Buildings 46 m

    2a) Berlin Hauptbahnhof (Berlin central station) Facts and Figures

    DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    19/38

    19

    EFRTC General Meeting, BerlinAgenda

    1. The Company DB ProjektBauOverview

    2. Logistics concept for Berlin

    3. ABS Berlin - Frankfurt/Oder, Oderbrcke (Oder-bridge)

    a) Berlin Hauptbahnhof (Berlin central station)

    b) The new Ostkreuz

    DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    20/38

    20

    Berlin Ostkreuz, 2007

    2b) The new Ostkreuz Facts and Figures

    Ostkreuz after the reconstruction,With new platforms for the regionalrail traffic (simulation), 2016

    DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    21/38

    2121

    2b) The new Ostkreuz Start of construction

    Project costs 432,1 mill.

    DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    22/38

    2b) The new Ostkreuz The advantages for the customer

    In the future also trains of the regionalrail traffic can stop at Ostkreuz

    Barrier-free and convenient access(for everyone)

    Accessible from all parts of the city

    Protection against wind and weather

    Better orientation when changing to

    other trains

    Tram connection close to the station

    The old charm of Ostkreuz will stillremain after the reconstruction

    Overview of the 7 advantages of the new station:

    DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    23/38

    23

    2b) The new Ostkreuz State of construction in September 2008

    DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    24/38

    24

    2b) The new Ostkreuz State of construction in November 2008

    DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    25/38

    2525

    2b) The new Ostkreuz Aerial view, 13.01.2009

    DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    26/38

    2b) The new Ostkreuz State of construction in September/October 2009

    DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    27/38

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    28/38

    3. ABS Berlin Frankfurt/Oder, Oderbrcke (Oder-bridge) Old Oderbrcke

    28DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    29/38

    PL

    O d er

    O d r a

    N

    D1951 1900 1900 1900 1900 1951

    1925 1925 1925 1925 1925 1925

    1870/ 1946

    1951 1951 1900

    1925 1925 1951

    1870/ 1946

    1951

    1870/ 1946

    1870/ 1946

    1870/ 1946

    1870/ 1946

    1870/ 1946

    1870/ 1946

    1870/ 1946

    1870/ 1967

    1870/ 1946

    Caption:Numbers = Date of commissioninge

    X X

    X X Track Polen Germany closed

    3. ABS Berlin Frankfurt/Oder, Oderbrcke (Oder-bridge) Age of the segments from the bridge

    29DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    30/38

    3. ABS Berlin Frankfurt/Oder, Oderbrcke (Oder-bridge) Transport links

    30DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    31/38

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    32/38

    3. ABS Berlin Frankfurt/Oder, Oderbrcke (Oder-bridge) Installation of the auxiliary bridge

    32DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

    New building railway bridge across the river Oder, removal of the old bridge, foundation for piles

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    33/38

    3. ABS Berlin Frankfurt/Oder, Oderbrcke (Oder-bridge) Vorlandbrcke (Vorlandbridge)

    33DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    34/38

    3. ABS Berlin Frankfurt/Oder, Oderbrcke (Oder-bridge) Swim out of the old bridge

    34DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    35/38

    3. ABS Berlin Frankfurt/Oder, Oderbrcke (Oder-bridge) New bridge

    35DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    36/38

    3. ABS Berlin Frankfurt/Oder, Oderbrcke (Oder-bridge) Swim in of the new bridge

    36DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    37/38

  • 8/9/2019 11 EFRTC Presentation DB ProjektBau GmbH Final

    38/38

    Thank you for your attention

    38DB ProjektBau GmbH, Dr. Katharina Klemt-Albert, 20.11.2009