TerbilangKALAU MAU MENGCOPY HARUS KE BAWAH**.3,530,000,000*Model (1-3):1.****Tiga Milyar Lima Ratus Tiga Puluh Juta Rupiah.1*******Satu Dua Tiga Empat Lima Enam Tujuh Delapan Sembilan **** Ribu Juta Milyar ****003530000000**********0001****0 ****Sepuluh ****0****0 ********************0002****0 ****Sepuluh ****0****0 ********************5303****5Tiga Puluh ****Lima RatusSepuluh ****3****0Tiga Puluh ****Tiga Puluh Tiga Puluh ****Lima Ratus Tiga Puluh Juta ************0034****0 ****Tiga Belas ****0Tiga ****3 Tiga ****Tiga Tiga **** Tiga Milyar ********0001****0 ****Sepuluh ****0 *****0 ************46000****46***4600Tiga Milyar Lima Ratus Tiga Puluh Juta*Tiga Milyar Lima Ratus Tiga Puluh Juta Rupiah.Tiga Milyar Lima Ratus Tiga Puluh Juta*Tiga Milyar Lima Ratus Tiga Puluh Juta*Tiga Milyar Lima Ratus Tiga Puluh Juta Rupiah.Tiga Milyar Lima Ratus Tiga Puluh Juta Rupiah.*Tiga Milyar Lima Ratus Tiga Puluh Juta Rupiah.1Tiga Milyar Lima Ratus Tiga Puluh Juta Rupiah.2Tiga Milyar Lima Ratus Tiga Puluh Juta Rupiah.3Tiga Milyar Lima Ratus Tiga Puluh Juta Rupiah.******

Peta Quarry

Jarak Rata-rata dari Base Camp ke Lokasi Pekerjaan =

( (5+7,45/2)x7,45 + (7,45+7,45/2)*7,45) =8,73 km (7,45+7,45)Jarak Rata-rata dari Base Camp ke Quarry =

( (5+158/2)x158 + (5+7,45/2)*7,45) = 80,61 km (158+7,45)

InformasiINFORMASI UMUM

No.U R A I A NI N F O R M A S I

1.Kegiatan: PERENCANAAN REHABILITASI PEMELIHARAAN JALAN KABUPATEN2.Nomor Paket Kontrak: -3.Nama Paket: PENINGKATAN JALAN SIBREH - PEUKAN BILUYLokasi: KECAMATAN KUTA MALAKA: 20144.Propinsi / Kabupaten / Kotamadya: ACEH BESAR

5.Lokasi pekerjaanPeriksa lampiran

6.Kondisi jalan lama. . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

7.Panjang efektif( lihat sketsa di bawah )34.00Kilometer ( Leff = a + b )

8.Lebar jalan lama( bahu + perkerasan + bahu )(1.00+7.00+1.00) meter

9.Lebar Rencana( bahu + perkerasan + bahu )(2.00+7.00+2.00) meter

10.Penampang jalan, jenis dan volume pekerjaan pokokLihat lampiran.

11.Jangka waktu pelaksanaan pekerjaan180.0 hari kalenderAtau :6.00 bulan (Periode Pelaksanaan)

12.Jarak rata-rata Base Camp ke lokasi pekerjaan --->L =34.02 Kilometer

Perhitungan didasarkan pada sketsa di bawah ini :L = { (c+a/2)*a + (c+b/2)*b } / (a+b)ERROR:#REF!ERROR:#REF!

18.00Km = a16.00Km = bERROR:#REF!25.000 A25.49Km = c BERROR:#REF!ERROR:#REF!Base Camp --------->

Kalkulasi Jarak Rata-Rata =

13.Jam kerja efektif dalam 1 hari7.00 jam14.Asuransi, Pajak, dsb. untuk Peralatan0.002 x Harga Pokok Alat15.Tingkat Suku Bunga Investasi Alat20.00 %16.Biaya Umum dan Keuntungan10.00 % x Biaya Langsung

17.RINGKASAN METODE PELAKSANAAN

a.Mobilisasi dilaksanakan sesuai ketentuan yang berlaku dalam Kontrak.

b.Pekerjaan Tanah dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .c.Pekerjaan Lapis Pondasi Agregat dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .d.Pekerjaan Campuran Aspal Panas dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .e.Pekerjaan Pasangan Batu dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .f.Pekerjaan Pengembalian Kondisi dilaksanakan untuk . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

18.Lokasi QuarryPeriksa lampiran.

19.Jumlah Jembatan = ...................... BuahPeriksa lampiran.

20.Total Bentang Jembatan = .................. BuahPeriksa lampiran.

21.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

22.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

23.. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .

DC

Rekap74210000

ENGINEER ESTIMATE (EE)REKAPITULASI HARGA

KEGIATAN: PERENCANAAN REHABILITASI PEMELIHARAAN JALAN KABUPATENNo. Paket: -NAMA PAKET: PENINGKATAN JALAN SIBREH - PEUKAN BILUYLOKASI: KECAMATAN KUTA MALAKATH. ANGGARAN: 2014KABUPATEN: ACEH BESAR

Jumlah HargaNo. DivisiUraianPekerjaan(Rupiah)

1.Umum74,210,000.002.Drainase12,835,902.003.Pekerjaan Tanah19,626,802.304.Pelebaran Perkerasan dan Bahu Jalan154,178,640.005.Pekerasan Berbutir dan Perkerasan Beton Semen1,600,726,829.916.Perkerasan Aspal1,311,534,693.507.Struktur35,981,350.198.Pengembalian Kondisi dan Pekerjaan Minor-9.Pekerjaan Harian-10.Pekerjaan Pemeliharaan Rutin-

(A). Jumlah Harga Pekerjaan ( termasuk Biaya Umum dan Keuntungan )3,209,094,217.90 (B). Pajak Pertambahan Nilai ( PPN ) = 10% x (A)320,909,421.79 (C). JUMLAH TOTAL HARGA PEKERJAAN = (A) + (B)3,530,003,639.69 (D). DIBULATKAN3,530,000,000.002,520,000,000pagu Terbilang :Tiga Milyar Lima Ratus Tiga Puluh Juta Rupiah.(1,010,000,000.00)

KOTA JANTHO, 10 DESEMBER 2013

Diketahui/Disetujui :Disusun Oleh :Kepala Dinas Bina Marga dan Cipta KaryaCV. CENTRAL DESIGN CONSULTANTKabupaten Aceh Besar,Selaku Pengguna Anggaran

IR. ISMARYADI, M.SiFAISAL M, ALI, STNIP. 19560924 198706 1 001Direktur

BOQ

DAFTAR KUANTITAS DAN HARGA

KEGIATAN: PERENCANAAN REHABILITASI PEMELIHARAAN JALAN KABUPATENNo. Paket: -NAMA PAKET: PENINGKATAN JALAN SIBREH - PEUKAN BILUYLOKASI: KECAMATAN KUTA MALAKATH. ANGGARAN: 2014KABUPATEN: ACEH BESAR

No. Mata PembayaranUraianSatuanPerkiraan KuantitasHarga Satuan ( Rp. )Jumlah Harga-Harga ( Rp. )Harga25,750,000.00Satuan(Rupiah)abcdef = (d x e)e

DIVISI 1. UMUM1.2MobilisasiLS1.0074,210,000.0074,210,000.00198700001.8Manajemen dan Keselamatan Lalu Lintas LS-55710001.18.(1)Relokasi Utilitas dan Pelayanan Telkom yang AdaLS20,000,000.00-200000001.18.(2)Relokasi Utilitas dan Pelayanan PDAM yang AdaLS20,000,000.00-200000001.18.(3)Relokasi Utilitas dan Pelayanan PLN yang AdaLS12,167,000.00-121670001.18.(4)Relokasi Utilitas dan Pelayanan Gas yang AdaLS--1.18.(5)Relokasi Utilitas dan Pelayanan Lain yang AdaLS--1.20.1Pengeboran, termasuk SPT dan Laporan M1--1.20.2Sondir termasuk LaporanM1--1.21Manajemen Mutu LS--

Jumlah Harga Pekerjaan DIVISI 1 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)74,210,000.00500.64032.00DIVISI 2. DRAINASE0.3819.002.1Galian untuk Selokan Drainase dan Saluran AirM332.0044,125.001,412,000.0037,256.63318592.2Pasangan Batu dengan MortarM319.00601,258.0011,423,902.004986172.3.1Gorong-gorong Pipa Beton Bertulang, diameter dalam 50 cmM1-715,424.48-654054.0459945762.3.2Gorong-gorong Pipa Beton Bertulang, diameter 50 - 70 cmM1-1,034,892.43-945447.0506255462.3.3Gorong-gorong Pipa Beton Bertulang, diameter dalam 70 - 100 cmM1-1,892,299.46-1733274.043770942.3.4Gorong-gorong Pipa Beton Bertulang, diameter dalam 100 - 130 cmM1-2,442,828.68-2229986.008486562.3.5Gorong-gorong Pipa Baja BergelombangTon-24,049,942.07-20405922.43901032.3.6Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 20 cmM1-191,843.15-181788.0205294342.3.7Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 25 cmM1-212,081.42-201093.4213868472.3.8Gorong-gorong Pipa Beton Tanpa Tulangan diameter dalam 30 cmM1-232,499.36-220575.96931582.3.9Saluran berbentuk U Tipe DS 1M1--2.3.10Saluran berbentuk U Tipe DS 2M1--2.3.11Saluran berbentuk U Tipe DS 3M1--2.3.12Beton K250 (fc 20) untuk struktur drainase beton minorM3--2.3.13Baja Tulangan untuk struktur drainase beton minorKg--2.3.14Pasangan Batu tanpa Adukan (Aanstamping) M3--2.4.1Bahan Porous untuk Bahan Penyaring (Filter)M3-272,858.69-254566.7661558092.4.2Anyaman Filter PlastikM2-28,578.00-23083.52.4.3Pipa Berlubang Banyak (Perforated Pipe) untuk Pekerjaan Drainase Bawah M1-54,886.35-41153.18592Permukaan

382Jumlah Harga Pekerjaan DIVISI 2 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)12,835,902.002776351294DIVISI 3. PEKERJAAN TANAHPLTVVTOT3.1.1Galian BiasaM37.1450,736.00362,255.043,530,000,000.0079,649.724061.5180351573.1.2Galian BatuM3-192,217.43-186230.353.1.3Galian Struktur dengan kedalaman 0 - 2 meterM3-39,872.82-38830.373.1.4Galian Struktur dengan kedalaman 2 - 4 meterM3-1,038,907.31-1236511.963.1.5Galian Struktur dengan kedalaman 4 - 6 meterM3-1,042,962.77-1240482.16694543.1.6Galian Perkerasan Beraspal dengan Cold Milling MachineM3-63,797.16-353000000060193.49272854773.1.7Galian Perkerasan Beraspal tanpa Cold Milling MachineM3-818,755.86-776530.7794910113.1.8Galian Perkerasan BerbutirM3---10100000003.1.9.Galian Perkerasan BetonM3--3.2.1Timbunan BiasaM315.70123,008.951,931,240.52121176.713.2.2Timbunan PilihanM37.50149,326.001,119,945.00186,650.881461653.2.3Timbunan Pilihan berbutirM3-143,449.56-140722.3043648483.3Penyiapan Badan JalanM210,773.001,505.0016,213,361.751003.00300.003110.523.4.1Pembersihan dan Pengupasan Lahan M2-80,805.89-80727.73788788243.4.2Pemotongan Pohon Pilihan diameter 15 30 cmPohon-114,961.10-110480.050900363.4.3Pemotongan Pohon Pilihan diameter 30 50 cmPohon-154,704.14-148532.576350543.4.4Pemotongan Pohon Pilihan diameter 50 75 cmPohon-234,190.24-10,773.00224637.6272509013.4.5Pemotongan Pohon Pilihan diameter > 75 cmPohon-480,860.52-460951.792789844

373,838.63Jumlah Harga Pekerjaan DIVISI 3 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)19,626,802.30

DIVISI 4. PELEBARAN PERKERASAN DAN BAHU JALAN4.2.1Lapis Pondasi Agregat Kelas AM3-472,979.00-532,556.874268094.2.2Lapis Pondasi Agregat Kelas BM3360.00428,274.00154,178,640.00508,290.633863284.2.3Semen untuk Lapis Pondasi Semen TanahTon-1,635,341.05-1338791.124.2.4Lapis Pondasi Semen TanahM3-257,180.51-245311.2030853414.2.5Agregat Penutup BURTUM2-6,471.79-6201.46036755354.2.6Bahan Aspal untuk Pekerjaan PelaburanLiter-16,557.42-12290.18745141814.2.7Lapis Resap PengikatLiter-13,445.00-9,474.4010011

Jumlah Harga Pekerjaan DIVISI 4 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)154,178,640.00

DIVISI 5. PERKERASAN BERBUTIR DAN PERKERASAN BETON SEMEN5.1.1Lapis Pondasi Agregat Kelas AM31,615.95471,532.00761,972,135.40398924531,471.321004.50.1567.54252865.1.2Lapis Pondasi Agregat Kelas BM31,975.05424,675.17838,754,694.511,975.051004.50.290383078.065.1.3Lapis Pondasi Agregat Kelas SM3-409,129.80-369628.7444106735.2,1Lapis Pondasi Agregat Kelas CM3---05.3.1Perkerasan Beton Semen M3-1,923,110.77-1750796.140864235.3.2Perkerasan Beton Semen dengan Anyaman Tulangan Tunggal M3--5.3.3Lapis Pondasi bawah Beton KurusM3--5.4.1Semen untuk Lapis Pondasi Semen TanahTon-1,737,115.84-1433840.465374345.4.2Lapis Pondasi Tanah SemenM3-326,337.15-309278.7177605645.5.(1)Lapis Beton Semen Pondasi Bawah (Cement Treated Sub Base (CTSB))M3-5.5.(2)Lapis Pondasi Agregat Dengan Cement Treated Base (CTB)M3-

Jumlah Harga Pekerjaan DIVISI 5 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)1,600,726,829.91

DIVISI 6. PERKERASAN ASPAL6.1 (1)(a)Lapis Resap Pengikat - Aspal CairLiter8,618.4013,190.00113,676,696.009,538.6610030.824098156.1 (1)(b)Lapis Resap Pengikat - Aspal EmulsiLiter-6.1 (2)(a)Lapis Perekat - Aspal CairLiter-14,379.00-10,858.60106856.1 (2)(b)Lapis Perekat - Aspal EmulsiLiter6.1 (2)(c)Lapis Perekat - Aspal Emulsi ModifikasiLiter6.2 (1)Agregat Penutup BURTUM214,199.64-13782.446.2 (2)Agregat Penutup BURDAM222,490.48-21844.586.2 (3)(a)Bahan Aspal untuk Pekerjaan Pelaburan yang diencerkanLiter15,567.35-11556.126.2 (3)(b)Bahan Aspal untuk Pekerjaan PelaburanLiter6.2 (4)(a)Bahan Aspal Modifikasi untuk Pekerjaan PelaburanLiter6.2 (4)(b)Aspal Emulai Cair untuk PrecoatedLiter6.2 (4)(c)Aspal Emulai untuk PrecoatedLiter6.2 (4)(d)Aspal Emulai Modifikasi untuk PrecoatedLiter6.2 (4)(e)Bahan anti pengelupasanLiter6.3 (1)Latasir Kelas A (SS-A), (t = 1,5 cm)M263,130.23-49898.56.3 (2)Latasir Kelas B (SS-B), (t = 2,0 cm)M277,584.00-616536.3(3a)Lataston Lapis Aus (HRS-WC) 3.0 cm (gradasi senjang/semi senjang)Ton371,283.99-365440.0383473116.3(3b)Lataston Lapis Aus Perata (HRS-WC(L)) (gradasi senjang/semi senjang)Ton371,283.99-365440.0383473116.3.4aLataston Lapis Pondasi (HRS-Base) (gradasi senjang/semi senjang)Ton374,126.63-MaterialAspalAditifFillerHarga Satuan367246.116.3.4bLataston Lapis Pondasi Perata (HRS-Base(L)) (gradasi senjang/semi senjang)Ton374,126.63-367246.1062874916.3(5a)Laston Lapis Aus (AC-WC) (gradasi halus/kasar)Ton981.07403,128.00395,498,005.881403,128.00850,500.000160,000.0013,000.001,426,628.00453767.093895756.3(5b)Laston Lapis Aus Modifikasi (AC-WC Mod) (gradasi halus/kasar)Ton403,018.17-389465.798641766.3(5c)Laston Lapis Aus Perata (AC-WC(L)) (gradasi halus/kasar)Ton403,018.17-100.004.50.052.3552.88389465.79864176

6.3(5d)Laston Lapis Aus Perata (AC-WC(L)Mod) (gradasi halus/kasar)Ton403,018.17-389465.798641766.3(6a)Laston Lapis Antara (AC-BC) (gradasi halus/kasar)Ton404,258.00-1404,258.00742,500.00160,000.0013,000.001,319,758.00455956.313904406.3(6b)Laston Lapis Antara Modifikasi (AC-BC Mod)(gradasi halus/kasar)Ton404,907.35-390998.7044358736.3(6c)Laston Lapis Antara Perata (AC-BC(L)) (gradasi halus/kasar)Ton404,148.11-390330.156.3(6d)Laston Lapis Antara Modifikasi Perata (AC-BC(L)Mod) (gradasi halus/kasar)Ton404,907.35-390998.76.3(7a)Laston Lapis Pondasi (AC-Base) (gradasi halus/kasar)Ton408,550.00-1408,550.00702,000.00160,000.0013,000.001,283,550.003941606.3(7b)Laston Lapis Pondasi Modifikasi (AC-Base Mod) (gradasi halus/kasar)Ton411,438.98-397039.549341576.3(7c)Laston Lapis Antara Perata (AC-Base(L)) (gradasi halus/kasar)Ton408,440.55-394050.066.3(7d)Laston Lapis Antara Modifikasi Perata (AC-Base(L)Mod) (gradasi halus/kasar)Ton411,438.98-397039.556.3.8.aAspal MinyakTon56.5413,500,000.00763,282,624.1310,159,878.00100000006.3.8.bAspal ModifikasiERROR:#REF!(a) Asbuton yang diprosesTon--802,359,991.62ERROR:#DIV/0!0(b) Elastomer AlamTon--ERROR:#REF!802,359,991.620(c) Elastomer SintesisTon--06.3.9Aditif anti pengelupasanKg169.6280,000.0013,569,468.8740,000.00380006.3.10Bahan Pengisi (Filler) TambahanKg19,621.461,300.0025,507,898.621,098.641050

6.4 (1)LasbutagM2-11751.176.4 (2)Latasbusir Kelas AM2-5559.70707850396.4 (3)Latasbusir Kelas BM2-7668.65624398946.4 (4)Bitumen AsbutonTon-1775812.56.4 (5)Bitumen Bahan PeremajaTon-7635636.383309456.4 (6)Bahan Anti Pengelupasan (anti stripping agent) Liter46,000.00-240006.5Campuran Aspal Dingin untuk PelapisanM32,989,346.25-2336510.829870616.6.1Lapis Permukaan Penetrasi Macadam M32,153,372.88-1705051.319792486.6.2Lapis Fondasi atau Perata Penetrasi MacadamM32,270,426.16-1798914.60776067

Jumlah Harga Pekerjaan DIVISI 6 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)1,311,534,693.50

DIVISI 7. STRUKTUR7.1 (1)Beton mutu tinggi dengan fc=50 MPa (K-600)M3-7.1 (2)Beton mutu tinggi dengan fc=45 MPa (K-500)M32,898,685.78-2935515.797788597.1 (3)Beton mutu tinggi dengan fc=40 MPa (K-450)M3-7.1 (4)Beton mutu tinggi dengan fc=35 MPa (K-400)M32,792,600.67-VTOT2851533.039757827.1 (5)Beton mutu sedang dengan fc=30 MPa (K-350)M3-2,736,435.28-gelagar10.000.41.24.819.22811473.287.1 (6)Beton mutu sedang dengan fc= 25 MPa (K-300)M32,011,868.67-1967602.239882757.1 (7)Beton mutu sedang dengan fc= 20 MPa (K-250)M36.811,545,669.0010,526,005.89lantai10.004.50.125.424.615667717.1 (8)Beton mutu rendah dengan fc= 15 MPa (K-175)M32.301,234,759.382,839,946.5710.000.50.2121166251.557.1 (9)Beton Siklop fc=15 MPa (K-175)M3843,236.60-(3.19)5.767.76725522.5485001357.1 (10)Beton mutu rendah dengan fc= 10 MPa (K-125)M3-970,657.00-1,083,291.7850.009400127.2 (1)Unit Pracetak Gelagar Tipe I7.2 (1)(a) Bentang 16 meterBuah35,412,604.02-32342958.41991887.2 (1)(b) Bentang 25 meterBuah54,372,069.01-49624724.5881667.2 (1)(c) Bentang 35 meterBuah75,152,141.22-68562686.99732957.2 (1)(d) Bentang ....... meter Buah896,345.63-866632.8509714157.2 (2)Unit Pracetak Gelagar Tipe U(a) Bentang 16 meterBuah35,412,604.02-32342958.4199188(b) Bentang 25 meterBuah54,372,069.01-49624724.588166(c) Bentang 35 meterBuah75,152,141.22-68562686.9973295(d) Bentang ....... meter Buah896,345.63-866632.8509714157.2 (3)Unit Pracetak Gelagar Tipe V(a) Bentang 16 meterBuah-(b) Bentang 25 meterBuah-(c) Bentang 35 meterBuah-(d) Bentang ....... meter Buah-7.2.(4)Baja Prategang Kg334,929.13-317436.3513592247.2.(5)Pelat Berongga (Hollow Slab) Pracetak bentang 21 meterBuah60,043,325.55-47266722.7281317.2.(6)Beton Diafragma K350 (fc 30 MPa) termasuk pekerjaan penegangan setelah M32,113,814.09-1531349.27442238pengecoran (post-tension)7.3 (1)Baja Tulangan BJ 24 PolosKg651.2520,925.0013,627,424.5013,160.31144767.3 (2)Baja Tulangan BJ 32 PolosKg18,839.70-14690.57.3 (3)Baja Tulangan BJ 32 UlirKg-24,708.20-PLAT INJAKLT JMBTNGELAGAR19530.57.3 (4)Baja Tulangan BJ 39 UlirKg23,690.70-3.605.44.8164237.3 (5)Baja Tulangan BJ 48 UlirKg28,943.20-13.801,656.0023160.57.3 (6)Anyaman Kawat Yang Dilas (Welded Wire Mesh)Kg-98,180.00--10100000001056827.4 (1)Baja Struktur BJ 34 (Titik Leleh 210 MPa), penyediaan dan pemasangan.Kg-7.4 (2)Baja Struktur BJ 37 (Titik Leleh 240 MPa), penyediaan dan pemasangan.Kg-7.4 (3)Baja Struktur BJ 41 (Titik Leleh 250 MPa), penyediaan dan pemasangan.Kg34,818.85-16641.98280697267.4 (4)Baja Struktur BJ 50 (Titik Leleh 290 MPa), penyediaan dan pemasangan.Kg34,818.85-16641.98280697267.4 (5)Baja Struktur BJ 55 (Titik Leleh 410 MPa), penyediaan dan pemasangan.Kg34,818.85-16641.98280697267.4 (6)Pengadaan Struktur Jembatan Rangka Baja -a) Panjang 40 m, Lebar 9 mKg-b) Panjang 45 m, Lebar 9 mKg-c) Panjang 50 m, Lebar 9 mKg-d) Panjang 60 m, Lebar 9 mKg-e) Panjang .... m, Lebar 9mKg-7.4 (7)Pemasangan jembatan baja fabrikasiBuah1,128.73-1206.33260799317.4 (8)Pengangkutan Bahan Jembatan Rangka BajaBuah403.88-385.07229391027.5 (1)Pemasangan jembatan rangka bajaBuah1,128.73-1206.33260799317.5 (2)Pengangkutan Bahan JembatanBuah403.88-385.07229391027.6 (1)Fondasi Cerucuk, Pengadaan dan PemancanganM132,017.86-30210.71428571437.6 (2)Pengadaan Tiang Pancang Kayu Tanpa Pengawetan. ukuran ....M142,690.48-40280.95238095247.6 (3)Pengadaan Tiang Pancang Kayu Dengan Pengawetan. ukuran ....M154,057.14-51647.6190476197.6 (4)Pengadaan Tiang Pancang Baja ukuran:135,497.33-122601.483425358a) Diameter 400 mm tebal 10 mmKgb) Diameter 600 mm tebal 12 mmKgc) Diameter 1000 mm tebal 16 mmKg

7.6 (5)Pengadaan Tiang Pancang Beton Bertulang Pracetak ukuran/diameter:a) 350 mm x 350 mmM18,887,813.73-7762760.65607171b) 400 mm x 400 mmM1-c) 450 mm x 450 mmM1-7.6 (6)Pengadaan Tiang Pancang Beton Prategang Pracetak ukuran / diameter ......a) Diameter 350 mmM1782,549.44-742657.338326322b) Diameter 400 mmM1c) Diameter 450 mmM17.6 (7)Pemancangan Tiang Pancang Kayu. ukuran ....M196,026.88-91048.12351799547.6 (8)Pemancangan Tiang Pancang Beton bertulang pracetak. Ukuran:a) 350 mm x 350 mmM134,659.56-32999.976915637b) 400 mm x 400 mmM1c) 450 mm x 450 mmM17.6 (9)Pemancangan Tiang Pancang Beton Prategang Pracetak ukuran .... a) 350 mm x 350 mmM1b) 400 mm x 400 mmM1c) 450 mm x 450 mmM17.6 (10)Pemancangan Tiang Pancang Pipa Baja ukuran ....a) Diameter 400 mm tebal 10 mmM132,008.96-30349.3745059985b) Diameter 600 mm tebal 12 mmM1c) Diameter 1000 mm tebal 16 mmM17.6 (11)Tiang Bor Beton ukuran ....M11,129,180.93-988186.2757884467.6 (12)Tambahan Biaya untuk no. Mata Pembayaran 7.6.(7) s/d 7.6.(10) bila tiang pancangM13,293.66-3083.6812991838dikerjakan di air7.6 (13)Tambahan Biaya untuk no. Mata Pembayaran 7.6.(11) bila tiang bor dikerjakan di airM116,266.35-15030.74941157257.6 (14)Tiang Uji ukuran .... jenis M1-7.6 (15)Pengujian Pembebanan Statis pada Tiang ukuran/ diameter ....-a) Cara Meja BebanBuah-b) Cara DongkrakBuah-7.6 (16)Pengujian Pembebanan Dinamis jnis-a) PDA ( Pile Driving Analisys)Buah-b) PDLT ( Pile Dynamic Load Test)Buah-7.6 (17)Pengujian Keutuhan Tiang dengan Pile Integrated TestBuah--10100000007.7 (1)Pengadaan Dinding Sumuran Silinder, diameter ..M'--07.7 (2)Penurunan Dinding Sumuran Silinder, diameter M'--21.001.50.34.72518.928.9807.9Pasangan BatuM313.48667,011.008,987,973.2321.000.40.32.5210.085669637.10 (1)Pasangan Batu Kosong yang Diisi AdukanM3-591,738.00-749,939.731,503.405033537.10 (2)Pasangan Batu KosongM3281,880.50-231979.777.10 (3)BronjongM3598,026.00-2057044.337.11 (1)Expansion Joint Tipe Asphaltic PlugM'7.11 (2)Expansion Joint Tipe Rubber 1 (celah 21 mm - 41 mm)M'37,700,000.0037,700,000.007.11 (3)Expansion Joint Tipe Rubber 2 (celah 32 mm - 62 mm)M'24,804,350.0024,804,350.007.11 (4)Expansion Joint Tipe Rubber 3 (celah 42 mm - 82 mm)M'1,366,440.002,850,690.007.11 (5)Join Filler untuk sambungan konstruksiM'1,484,250.007.11 (6)Expansion Joint Tipe baja bersudutM'-275,000.00-114,456,637.00114,456,637.002750007.12 (1)Perletakan Logam Buah108,350.00-262,011,107.00358,721,107.00992757.12 (2)Perletakan Elastomer jenis 1 (300 x 350 x 36)Buah-96,710,000.007.12 (3)Perletakan Elastomer jenis 2 (350 x 400 x 39)Buah-30,472,132.00438,609,429.007.12 (4)Perletakan Elastomer jenis 3 (400 x 450 x 45)Buah-775,000.00-408,137,297.007750007.12 (5)Perletakan StripM'-1,760,592.0022,857,784.007.13.Sandaran (Railing)M'-189,157.00-2,563,372.001891577.14Papan Nama JembatanBuah216,700.00-18,533,820.001947007.15 (1)Pembongkaran Pasangan Batu M3-237,441.58-999,999,997.00228384.443797967.15 (2)Pembongkaran BetonM3-458,557.77-438323.3229629667.15 (3)Pembongkaran Beton PratekanM3240,281.85-232282.0321353637.15 (4)Pembongkaran Bangunan Gedung M290,223.75-86674.57384930727.15 (5)Pembongkaran Rangka BajaM2302,264.85-293761.399271577.15 (6)Pembongkaran Balok Baja (Steel Stringers)M2203,430.94-194385.1384966677.15 (7)Pembongkaran Lantai Jembatan KayuM295,265.40-90704.64306186557.15 (8)Pembongkaran Jembatan KayuM2208,546.90-199743.2984499067.15.(9)Pengangkutan Hasil Bongkaran yang melebihi 5 kmM3 / Km-7.16Pipa Cucuran BajaM1-7.17Wet Lean ConcreteM27.18Geotektil Non Woven Untuk Penyaringan Badan JalanM2--74492

Jumlah Harga Pekerjaan DIVISI 7 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)35,981,350.19

DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR8.1 (1)Lapis Pondasi Agregat Kelas A utk Pekerjaan MinorM3ERROR:#REF!ERROR:#REF!426438.293342428.1 (2)Lapis Pondasi Agregat Kelas B utk Pekerjaan MinorM3ERROR:#REF!ERROR:#REF!534670.7176995178.1 (3)Agregat untuk Perkerasan Tanpa Penutup Aspal untuk Pekerjaan MinorM3 (vol.gembur)ERROR:#REF!ERROR:#REF!M3 (vol. gembur)360917.9122568288.1 (4)Waterbound Macadam untuk Pekerjaan MinorM3ERROR:#REF!ERROR:#REF!400513.9707476038.1 (5)Campuran Aspal Panas untuk Pekerjaan MinorM3ERROR:#REF!ERROR:#REF!2892184.692827678.1 (6)Lasbutag atau Latasbusir untuk Pekerjaan MinorM3-8.1 (7)Penetrasi Macadam untuk Pekerjaan MinorM3ERROR:#REF!ERROR:#REF!1779366.968417358.1 (8)Campuran Aspal Dingin untuk Pekerjaan MinorM3ERROR:#REF!ERROR:#REF!2203841.735645358.1 (9)Residu Bitumen untuk Pekerjaan MinorLiterERROR:#REF!ERROR:#REF!11929.96993243658.2(1) Galian untuk Bahu Jalan dan Pekerjaan Minor LainnyaM3ERROR:#REF!ERROR:#REF!79192.33557393878.2(2) Pembersihan dan Pembongkaran Tanaman (diamater < 30 cm)M2ERROR:#REF!ERROR:#REF!144705.9486068978.2(3) Pemotongan Pohon diameter 30 - 50 cmBuahERROR:#REF!ERROR:#REF!148532.576350548.2(4) Pemotongan Pohon diameter 50 - 75 cmBuahERROR:#REF!ERROR:#REF!224637.6272509018.2(5) Pemotongan Pohon diameter > 75 cmBuahERROR:#REF!ERROR:#REF!460951.7927898448.3.(1) Stabilisasi dengan TanamanM2ERROR:#REF!ERROR:#REF!ERROR:#REF!773638.3.(2) Semak / PerduM2ERROR:#REF!ERROR:#REF!770118.3.(3) Penanaman PohonBatangERROR:#REF!ERROR:#REF!ERROR:#REF!70,903.25631248.4.(1) Marka Jalan TermoplastikM2ERROR:#REF!ERROR:#REF!ERROR:#REF!289,793.101912698.4.(2) Marka Jalan Bukan TermoplastikM2ERROR:#REF!ERROR:#REF!173284.5649079548.4.(3) .(a)Rambu Jalan Tunggal dengan Permukaan Pemantul Engineer GradeBuahERROR:#REF!ERROR:#REF!536324.4351302658.4.(3) .(b)Rambu Jalan Ganda dengan Permukaan Pemantul Engineer GradeBuahERROR:#REF!ERROR:#REF!621340.1791302658.4.(4) .(a)Rambu Jalan Tunggal dengan Pemantul High Intensity GradeBuahERROR:#REF!ERROR:#REF!563824.4351302658.4.(4) .(b)Rambu Jalan Ganda dengan Pemantul High Intensity GradeBuahERROR:#REF!ERROR:#REF!673824.4351302658.4.(5) Patok PengarahBuahERROR:#REF!ERROR:#REF!921428.4.(6) .(a)Patok KilometerBuahERROR:#REF!ERROR:#REF!568912.6940477668.4.(6) .(b)Patok HektometerBuahERROR:#REF!ERROR:#REF!279914.2182630588.4.(7) Rel PengamanM1-ERROR:#REF!ERROR:#REF!345904.1776249858.4.(8) Paku Jalan BuahERROR:#REF!ERROR:#REF!120916.2327033638.4.(9) Mata Kucing BuahERROR:#REF!ERROR:#REF!107716.2327033638.4.(10)(a)Kerb Pracetak Jenis 1 (Peninggi/Mountable)M1ERROR:#REF!ERROR:#REF!ERROR:#REF!158993.7222645528.4.(10)(b)Kerb Pracetak Jenis 2 (Penghalang/Barrier)M1-8.4.(10)(c)Kerb Pracetak Jenis 3 (Kerb Berparit/Gutter)M1-8.4.(10)(d)Kerb Pracetak Jenis 4 (Penghalang Berparit / Barrier Gutter) t = 20 cmM1-8.4.(10)(e)Kerb Pracetak Jenis 5 (Penghalang Berparit / Barrier Gutter) t = 30 cmM1-8.4.(10)(f)Kerb Pracetak Jenis 6 (Kerb dengan Bukaan)M1-8.4.(10)(g)Kerb Pracetak Jenis 7a (Kerb pada Pelandaian Trotoar)M1-8.4.(10)(h)Kerb Pracetak Jenis 7b (Kerb pada Pelandaian Trotoar)M1-8.4.(10)(i)Kerb Pracetak Jenis 7c (Kerb pada Pelandaian Trotoar)M1-8.4.(11)Kerb yang digunakan kembaliM1ERROR:#REF!ERROR:#REF!31514.3927709898.4.(12)Perkerasan Blok Beton pada Trotoar dan MedianM2ERROR:#REF!ERROR:#REF!137212.7226333158.5(1)Pengembalian Kondisi Lantai Jembatan BetonM1ERROR:#REF!ERROR:#REF!96179.68128928538.5(2)Pengembalian Kondisi Lantai Jembatan KayuM1ERROR:#REF!ERROR:#REF!350554.2857142868.5(3)Pengembalian Kondisi Pelapisan Permukaan Baja StrukturM1ERROR:#REF!ERROR:#REF!30276.19047619058.6(1)Kerb Pracetak Pemisah Jalan (Concrete Barrier)M1ERROR:#REF!ERROR:#REF!1097693.059744758.7(1)Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Sodium 250 WattBuahERROR:#REF!ERROR:#REF!23416257.75743578.7(2)Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Sodium 250 WattBuahERROR:#REF!ERROR:#REF!2333089.713200598.7(3)Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 250 WattBuahERROR:#REF!ERROR:#REF!2291401.609306728.7(4)Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 250 WattBuahERROR:#REF!ERROR:#REF!2333089.713200598.7(5)Unit Lampu Penerangan Jalan Lengan Tunggal, Tipe Merkuri 400 WattBuahERROR:#REF!ERROR:#REF!2291401.609306728.7(6)Unit Lampu Penerangan Jalan Lengan Ganda, Tipe Merkuri 400 WattBuahERROR:#REF!ERROR:#REF!2333089.713200598.8(1)Pagar Pemisah Pedestrian Carbon SteelM1ERROR:#REF!ERROR:#REF!428684.202700158.8(2)Pagar Pemisah Pedestrian GalvanizedM1ERROR:#REF!ERROR:#REF!428684.20270015

Jumlah Harga Pekerjaan DIVISI 8 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)ERROR:#REF!

DIVISI 9. PEKERJAAN HARIAN9.1MandorJam-13,357.14-10214.299.2Pekerja BiasaJam-8,800.00-88009.3Tukang Kayu, Tukang Batu, dsbJam-13,357.14-11314.299.4Dump Truck, kapasitas 3-4 mJam---09.5Truk Bak Datar 3 - 4 tonJam---09.6Truk Tangki 3000 - 4500 LiterJam---09.7Bulldozer 100 - 150 PKJam---09.8Motor Grader min 100 PKJam---09.9Loader Roda Karet 1.0 - 1.6 M3Jam---09.10Loader Roda Berantai 75 - 100 PKJam---09.11Alat Penggali (Excavator) 80 - 140 PKJam---09.12Crane 10 - 15 TonJam---09.13Penggilas Roda Besi 6 - 9 TonJam---09.14Penggilas Bervibrasi 5 - 8 TonJam---09.15Pemadat Bervibrasi 1.5 - 3.0 PKJam---09.16Penggilas Roda Karet 8 - 10 TonJam---09.17Kompresor 4000 - 6500 Ltr/mntJam---09.18Beton Pengaduk (Molen) 0.3 - 0.6 M3Jam---09.19Pompa Air 70 - 100 mmJam---09.20Jack HammerJam---0

Jumlah Harga Pekerjaan DIVISI 9 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)-

DIVISI 10. PEKERJAAN PEMELIHARAAN RUTIN10.1 (1)Pemeliharaan Rutin Perkerasan LS---010.1 (2)Pemeliharaan Rutin Bahu JalanLS---010.1 (2b)Pemel. Rutin damija (pemotongan rumput, batang, akar dan sampah, dll)M2---10.1 (3)Pemeliharaan Rutin Selokan, Saluran Air, Galian dan TimbunanLS---010.1 (4)Pemeliharaan Rutin Perlengkapan JalanLS---010.1 (5)Pemeliharaan Rutin JembatanLS---0

Jumlah Harga Pekerjaan DIVISI 10 (masuk pada Rekapitulasi Perkiraan Harga Pekerjaan)-

JEMBATANLANTAI1.80BAJA TULANGAN116.1=67.12=134.20.88776=119.137392411.6=65.62=131.20.88776=116.474112235.611504GELAGAR1.08BAJA TULANGAN511.70=86.72=173.40.39456=68.416704TROMOL26.45=12.92=25.81.57824=40.718592TULANGAN UTAMA36.20=18.62=37.21.20834=44.95024836.20=18.62=37.21.20834=44.950248199.035792BALOK TUMPUAN1.23BAJA TULANGANBEGEL 30/70111.90=20.92=41.80.39456=16.492608BEGEL 40/80112.30=25.32=50.60.39456=19.96473671.60=11.22=22.41.20834=27.066816121.60=19.22=38.41.20834=46.400256109.924416SANDARAN 1.5K-175BAJA TULANGANBEGEL812.00=961=960.39456=37.87776312.50=77.51=77.50.88776=68.8014106.67916651.250872LENNING0.8RABAT BETON2.7PAS. BATU KALI7.29TIMBUNAN OPRIT7.5GALIAN7.14TALUD OPRIT5.975=13.265K-250 =6.81K-175 =2.3BAJA TULANGAN =651.250872

HIT-VOL

AC WC= 4 CMAC WC = 5,6PERHITUNGAN :AC BC= 6 CMAC BC = 5,42394 + 0.150.50Dinding Penahan / TaludNo.STATIONLEBARLEBAR RATA-RATAPANJANGTEBALVOLUME CAMPURAN (AC-WC)BERAT JENIS ( AC -WC)BERAT CAMPURAN (AC-WC)ASPAL + ADITIFAGREGAT + FILLERBAHAN PENGISI (FILLER)AGREGAT (Gradasi Halus/Kasar)ADITIF ANTI PENGELUPASANASPAL MINYAKSketsaSTAPanjangDinding KananDinding KiriTapak kananTapak kiri( Dinding kanan & kiri ) + ( Tapak Kanan & kiri)VolumeVolume Galian TanahTimbunan OpritGalian SaluranPersentaseVol.PersentaseVol.Koef.Vol.Vol.Koef.Vol.Vol.PEYIAPANPRIME COATTEAK COATKLAS BKLAS AB BAHU Lebar 1Lebar 2Tinggim2Lebar 1Lebar 2Tinggim2LebarTinggim2LebarTinggim2m2(m)(m)(m)(m)(m3)( ton/m3)(ton)(%)(ton)(%)(ton)(%)(Kg)(ton)(%)(Kg)(ton)BADAN JALANabcdefg = d*e*fhi = g*hjk = i*(j/100)l = 100-jm = i*(l/100)no=(n/(100+n)*m)*1000p=(100/(100+n))*mqr=(q/(100+q)*k)*1000s=(100/(100+q))*k

RUAS 1RUAS 10000.00 + 4.500+0004.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.001,975.0533.757.5050.000050.00 + 4.500+0504.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.5050.00- 0- 0- 00100.00 + 4.500+1004.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.5050.00- 0- 0- 00150.00 + 4.500+1504.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.5050.00- 0- 0- 00200.00 + 4.500+2004.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.5050.00- 0- 0- 00250.00 + 4.500+2504.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.5050.00- 0- 0- 00300.00 + 4.500+3004.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.5050.00- 0- 0- 00350.00 + 4.500+3504.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.5050.00- 0- 0- 00400.00 + 4.500+4004.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.50- 0- 0- 00450.00 + 4.500+4504.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.500500.00 + 4.500+5004.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.500550.00 + 4.500+5504.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.500600.00 + 4.500+6004.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.500650.00 + 4.500+6504.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.500700.00 + 4.500+7004.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.500750.00 + 4.500+7504.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.500800.00 + 4.500+8004.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.500850.00 + 4.500+8504.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.500900.00 + 4.500+9004.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.500950.00 + 4.500+9504.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.501000.00 + 4.501+0004.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.501050.00 + 4.501+0504.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.501100.00 + 4.501+1004.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.501150.00 + 4.501+1504.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.501200.00 + 4.501+2004.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.501250.00 + 4.501+2504.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.501300.00 + 4.501+3004.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.501350.00 + 4.501+3504.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.501400.00 + 4.501+4004.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.501450.00 + 4.501+4504.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.501500.00 + 4.501+5004.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.501550.00 + 4.501+5504.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.501600.00 + 4.501+6004.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.501650.00 + 4.501+6504.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.501700.00 + 4.501+7004.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.501750.00 + 4.501+7504.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.501800.00 + 4.501+8004.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.501850.00 + 4.501+8504.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.501900.00 + 4.501+9004.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.501950.00 + 4.501+9504.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.502000.00 + 4.502+0004.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.502050.00 + 4.502+0504.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.502100.00 + 4.502+1004.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.502150.00 + 4.502+1504.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.502200.00 + 4.502+2004.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.502250.00 + 4.502+2504.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.502300.00 + 4.502+3004.5050.000.049.002.3521.155.601.1898.8220.902.00409.7920.490.303.541.18225.00180.000.0033.757.502350.00 + 4.502+3504.5044.000.047.922.3518.615.601.0498.9618.422.00361.1418.060.303.121.04198.00158.400.0029.707.502394.00 + 4.502+394

JUMLAH2394 + 430.9219,621.46981.07169.6256.5410,773.008,618.400.001,975.051,615.95360.00BAHAN PENGISI (FILLER)AGREGAT (Gradasi Halus/Kasar)ADITIF ANTI PENGELUPASANASPAL MINYAKPEYIAPANPRIME COATTEAK COATKLAS BKLAS AB BAHU Jumlah 10.000.000.00Pas. Batu KaliGalian Tanah

MobilisasiITEM PEMBAYARAN NO.: 1.2JENIS PEKERJAAN: MOBILISASI

% TERHADAP TOTAL BIAYA KEGIATAN =2.31%FASILITAS LABORATORIUMLembar 1.2-1HARGAJUMLAHSATUAN PENGUKURAN:Lump sumNo.U R A I A NSATUANVOL.SATUANHARGAHARGA SATUAN:Rp. 96,340,000.00(Rp.)(Rp.)NO.URAIANSATUANVOLUMEHARGA TOTALKETERANGANSATUANA.Sewa TanahM2400750300,0002,000I.Laboratory Building1.Laboratory Buildingm220.00150,000.003,000,000.00B.PERALATANSUB TOTAL3,000,000.00Periksa lembar 1.2-21.0025,700,00025,700,000II.Soil & Aggregate Testing1.Compaction TestSet1.003,000,000.003,000,000.00Sewa15,000,000.003,000,000.00C.FASILITAS KONTRAKTOR2.CBR TestSet1.004,000,000.004,000,000.00Sewa20,000,000.004,000,000.001Base CampM2050,00003.Specific GravitySet1.00240,000.00240,000.00Sewa1,200,000.00240,000.002KantorM2150,000020.004.Atterberg LimitsSet1.001,000,000.001,000,000.00Sewa5,000,000.001,000,000.003BarakM2400.00100,00040,000,00032.005.Grain Size AnalysisSet1.002,500,000.002,500,000.00Sewa12,500,000.002,500,000.004BengkelM2-25,0000-6.Field Density Test by Sand Cone MethodeSet2.001,300,000.002,600,000.00Sewa6,500,000.001,300,000.005Gudang, dan lain-lainM2100,000060.007.Moisture ContentSet2.001,200,000.002,400,000.00Sewa6,000,000.001,200,000.006. . . . . . . . . . . . . . . . . . . . . .. . . .8.Abrasion of Aggregate by Los Angeles MachineBln2.004,800,000.009,600,000.00Sewa24,000,000.004,800,000.00SUB TOTAL25,340,000.00SUB TOTAL

D.FASILITAS LABORATORIUMIII.Bituminous Testing1Ruang Laboratorium (sesuai Gambar)M2-150,00001.Marshall Asphalt TestSet1.006,800,000.006,800,000.00Sewa34,000,000.006,800,000.002.Extraction Test, Centrifuge/Reflux MethodSet1.001,800,000.001,800,000.00Sewa9,000,000.001,800,000.002Soil & Aggregate TestingLS-25,340,00003.Specific Gravity of Coarse AggregateSet1.001,800,000.001,800,000.00Sewa9,000,000.001,800,000.004.Specific Gravity of Fine AggregateSet1.001,800,000.001,800,000.00Sewa9,000,000.001,800,000.003Bituminous TestingLS-27,100,00005.Mix Air Viod Content (Accurate Method)Set1.003,000,000.003,000,000.00Sewa15,000,000.003,000,000.006.Core DrillSet1.005,300,000.005,300,000.00Sewa26,500,000.005,300,000.004Concrete TestingLS-14,100,00007.Metal ThermometerSet1.00200,000.00200,000.00Sewa1,000,000.00200,000.008.Accessories and TollsSet1.001,000,000.001,000,000.00Sewa5,000,000.001,000,000.005Pendukung(Periksa Fasilitas Laboratorium)LS-400,00009.Penetration TestBln6.00200,000.001,200,000.00Sewa1,000,000.00200,000.0010.Softening PointSet1.001,200,000.001,200,000.00Sewa6,000,000.001,200,000.006Operasional(Periksa Fasilitas Laboratorium)LS-26,400,000011.Refusal Density CompactorSet1.003,000,000.003,000,000.00Sewa15,000,000.003,000,000.00SUB TOTAL27,100,000.00SUB TOTAL

E.MOBILISASI LAINNYAIV.Concrete TestingE.I.PEKERJAAN DARURAT1.Slump Cone Set1.00100,000.00100,000.00Sewa500,000.00100,000.001Perkuatan Jembatan LamaLS-100,000,00002.Cylinder/Cube Mould for Compressive StrengthSet1.002,000,000.002,000,000.00Sewa10,000,000.002,000,000.002Pemeliharaan Jalan Kerja / SampingLS-100,000,00003.Beam Mould for Flexural StrengthSet1.002,000,000.002,000,000.00Sewa10,000,000.002,000,000.003. . . . . . . . . . . . . . . . . . . . . .. . . .4.Crushing MachineSet1.0010,000,000.0010,000,000.00Sewa50,000,000.0010,000,000.004. . . . . . . . . . . . . . . . . . . . . .. . . .SUB TOTAL14,100,000.00SUB TOTAL

E.II.LAIN-LAINV.Peralatan pendukung1Komunikasi Lapangan LengkapSet-5,000,00001.Mobil Pick UpUnit1.00200,000.00200,000.00Mobilisasi100,000,000.002Papan Nama Proyek. . . .1.00500,000500,0002.Komputer + PrinterSet1.00100,000.00100,000.00Mobilisasi10,000,000.003. . . . . . . . . . . . . . . . . . . . . .. . . .3.FurnitureSet1.00100,000.00100,000.00Mobilisasi15,000,000.004. . . . . . . . . . . . . . . . . . . . . .. . . .SUB TOTAL400,000.00SUB TOTAL

VI.OperasionalF.DEMOBILISASILS1.007,710,0007,710,000Teknisi LaboratoriumBln8.001,300,000.0010,400,000.008,000,000.00Tenaga Kerja TerampilBln16.001,000,000.0016,000,000.003,000,000.00SUB TOTAL26,400,000.00SUB TOTALTotal Biaya Mobilisasi74,210,000125,230,000120,230,000VII.Test LuarCatatan :Jumlah yang tercantum pada masing-masing item mobilisasi di atas sudah termasuk over-head dan laba46,020,000Test Luar, sesuai kebutuhan atau atasLs1.000-serta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.perintah Direksi SUB TOTAL-

ITEM PEMBAYARAN NO.: 1.2JENIS PEKERJAAN : MOBILISASILembar 1.2-2KODEHARGAJUMLAHNo.JENIS ALATALATSATUANVOL.SATUANHARGATOTAL HARGA ( I - VII )Rp96,340,000.00(Rp.)(Rp.)

B.PERALATANCatatan :1ASPHALT MIXING PLANTE01Unit0200,000,0000200,000,0001.Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN2ASPHALT FINISHERE02Unit13,000,0003,000,000500,000yang dibayar kontrak) dan biaya lain-lainnya.3ASPHALT SPRAYERE03Unit1800,000800,000100,0002.Test luar adalah test ke lembaga pengujian yang disetujui oleh Konsultan Pengawas.4BULLDOZER 100-150 HPE04Unit0700,0000500,0005COMPRESSOR 4000-6500 L\ME05Unit1800,000800,000150,0006CONCRETE MIXER 0.3-0.6 M3E06Unit1200,000200,000100,0007CRANE 10-15 TONE07Unit0400,0000150,0008DUMP TRUCK 3-4 M3E08Unit6600,0003,600,000150,0009DUMP TRUCKE09Unit2800,0001,600,000150,00010EXCAVATOR 80-140 HPE10Unit03,000,0000500,00011FLAT BED TRUCK 3-4 M3E11Unit1600,000600,000150,00012GENERATOR SETE12Unit300,00013MOTOR GRADER >100 HPE13Unit13,000,0003,000,000500,00014TRACK LOADER 75-100 HPE14Unit0700,0000500,00015WHEEL LOADER 1.0-1.6 M3E15Unit500,00016THREE WHEEL ROLLER 6-8 TE16Unit0700,0000500,00017TANDEM ROLLER 6-8 T.E17Unit13,000,0003,000,000500,00018TIRE ROLLER 8-10 T.E18Unit13,000,0003,000,000500,00019VIBRATORY ROLLER 5-8 T.E19Unit13,000,0003,000,000500,00020CONCRETE VIBRATORE20Unit0200,000050,00021STONE CRUSHERE21Unit00040,000,00022WATER PUMP 70-100 mmE22Unit0200,000050,00023WATER TANKER 3000-4500 L.E23Unit1600,000600,000150,00024PEDESTRIAN ROLLERE24Unit0100,000050,00025TAMPERE25Unit0100,000050,00026JACK HAMMERE26Unit100,000050,00027FULVI MIXERE27Unit00500,00028CONCRETE PUMPE28Unit00500,00029TRAILER 20 TONE29Unit400,00001,000,00030PILE DRIVER + HAMMERE30Unit015,000,00001,000,00031CRANE ON TRACK 35 TONE31Unit040,000,00001,000,00032WELDING SETE32Unit0200,0000200,00033BORE PILE MACHINEE33Unit0400,0000500,00034ASPHALT LIQUID MIXERE34Unit0400,0000300,00035TRONTONE35Unit400,000036COLD MILLING MACHINEE37Unit37ROCK DRILL BREAKERE36Unit38COLD RECYCLERE38Unit39HOT RECYCLERE39Unit40AGGREGAT (CHIP) SPREADERE40Unit41ASPHALT DISTRIBUTORE41Unit400,000042SLIP FORM PAVERE42Unit43CONCRETE PAN MIXERE43Unit44CONCRETE BREAKERE44Unit45ASPAHLT TANKERE45Unit46CEMENT TANKERE46Unit47CONDRETE MIXER (350)E47Unit48VIBRATING RAMMERE48Unit49TRUK MIXER (AGITATOR)E49Unit50BORE PILE MACHINEE50Unit51CRANE ON TRACK 75-100 TONE51Unit52SURVEY EQUIPMENT-Set1.002,500,0002,500,000

Total untuk Item B pada Lembar 125,700,000

Perhitungan Mobilisasi AlatPerhitungan Kebutuhan Alat untuk Mobilisasi

NoNama AlatKodeJadwal PekerjaanKuantitasSatTargetPeralatan Yang DiperlukanNo Item PekerjaanAlatbulanHari KerjaJam KerjaPekerjaanProduksikoefisien alatjumlah alatjumlahminimalkebut. diper haritotalTiap Jamper itemper itemalatlapangan

123456=4x578=7:6910=8x9111213

1Asphalt Mixing PlantE016.3 (1)3757525981.0730236621M21.8690.00080.001486ERROR:#REF!116.3 (2)9225715750M20.0000.00110.0000006.3 (3)9225715750M20.000ERROR:#REF!ERROR:#REF!6.3(3a)9225715750Ton0.0000.02410.0000006.3(4)9225715750M30.000ERROR:#REF!ERROR:#REF!6.3(4a)9225715750Ton0.0000.02410.0000006.3(5a)9225715750M20.000ERROR:#REF!ERROR:#REF!6.3(5b)9225715750M20.000ERROR:#REF!ERROR:#REF!6.3(5c)9225715750Ton0.0000.02410.0000006.3(5d)25073500Ton0.0000.02410.0000006.3(6a)9225715750M30.0000.00000.0000006.3(6b)9225715750M30.0000.00000.0000006.3(6c)9225715750Ton0.0000.02410.0000006.3(6d)9225715750Ton0.0000.02410.0000006.3(7a)9225715750M30.0000.00960.0000006.3(7b)9225715750M30.0000.00000.0000006.3(7c)9225715750Ton0.0000.02410.0000006.3(7d)9225715750Ton0.0000.02410.0000008.1 (5)9225715750M30.000ERROR:#REF!ERROR:#REF!

2Asphalt FinisherE026.3 (1)922571575981.0730236621M20.6230.00130.000794ERROR:#REF!116.3 (2)9225715750M20.0000.00130.0000006.3 (3)9225715750M20.000ERROR:#REF!ERROR:#REF!6.3(3a)9225715750Ton0.0000.01910.0000006.3(4)25073500M30.000ERROR:#REF!ERROR:#REF!6.3(4a)9225715750Ton0.0000.00410.0000006.3(5a)9225715750M20.000ERROR:#REF!ERROR:#REF!6.3(5b)9225715750M20.000ERROR:#REF!ERROR:#REF!6.3(5c)9225715750Ton0.0000.01370.0000006.3(5d)9225715750Ton0.0000.01370.0000006.3(6a)9225715750M30.0000.00000.0000006.3(6b)9225715750M30.0000.00000.0000006.3(6c)9225715750Ton0.0000.01100.0000006.3(6d)9225715750Ton0.0000.01100.0000006.3(7a)9225715750M30.0000.37770.0000006.3(7b)9225715750M30.0000.00000.0000006.3(7c)9225715750Ton0.0000.00920.0000006.3(7d)9225715750Ton0.0000.00920.0000006.4 (1)9225715750M20.000ERROR:#REF!ERROR:#REF!6.4 (2)9225715750M20.000ERROR:#REF!ERROR:#REF!6.4 (3)9225715750M20.000ERROR:#REF!ERROR:#REF!

3Asphalt SprayerE036.6.19225715750M30.0000.00040.000000ERROR:#REF!116.6.29225715750M30.0000.00040.0000008.1 (7)9225715750M30.000ERROR:#REF!ERROR:#REF!8.1 (9)9225715750Liter0.000ERROR:#REF!ERROR:#REF!

4BulldozerE049.7717571225jam0.0000.0000.00011

5Concrete MixerE067.1(5)41007700m30.0000.0000.000117.1(6)41007700m30.0000.0007.1(8)41007700m30.0000.0007.941007700m30.0000.0009.18717571225jam0.0000.000

6Concrete Vibrator7.1(5)41007700m30.0000.0000.000117.1(6)41007700m30.0000.0007.1(8)41007700m30.0000.000

7CompressorE056.1(1)922571575liter0.0000.0000.000119.17717571225jam0.0000.000

8CraneE079.12717571225jam0.0000.0000.00011

9Dump TruckE082.1717571225m30.0000.0000.00018183.1(1)615071050m30.0000.0003.2(2)615071050m30.0000.0004.2(1)717571225m30.0000.0005.1(1)51257875m30.0000.0005.1(2)51257875m30.0000.0006.1(1)922571575liter0.0000.0006.1(2)922571575liter0.0000.0006.3(5)922571575m20.0000.0006.3(6)922571575m30.0000.0006.3(6)a922571575m30.0000.0006.3(7)922571575m30.0000.0008.1(1)2507350m30.0000.0008.1(5)2507350m30.0000.0008.4(4)2507350bh0.0000.0008.4(6)2507350bh0.0000.0009.4717571225jam0.0000.000

10ExcavatorE102.1717571225m30.0000.0000.000333.1(1)615071050m30.0000.0009.11717571225jam0.0000.000

11Flat Bed TruckE119.5717571225jam0.0000.0000.00011

12Generator SetE126.3(5)922571575m20.0000.0000.000116.3(6)922571575m30.0000.0006.3(6)a922571575m30.0000.0006.3(7)922571575m30.0000.0008.1(5)2507350m30.0000.000

13Motor GraderE133.2(2)615071050m30.0000.0000.000113.3(1)615071050m20.0000.0004.2(1)717571225m30.0000.0005.1(1)51257875m30.0000.0005.1(2)51257875m30.0000.0009.8717571225jam0.0000.000

14Pneumatic Tyred Roller5.1(1)717571225m30.0000.0000.000115.1(2)51257875m30.0000.0006.3(5)51257875m20.0000.0006.3(6)922571575m30.0000.0006.3(6)a922571575m30.0000.0006.3(7)922571575m30.0000.000

15Tandem RollerE176.3(5)922571575m20.0000.0000.000116.3(6)922571575m30.0000.0006.3(6)a922571575m30.0000.0006.3(7)922571575m30.0000.0008.1(5)2507350m30.0000.000

16Vibrator RollerE193.2(2)615071050m30.0000.0000.000115.1(1)51257875m30.0000.0005.1(2)51257875m30.0000.0009.14717571225jam0.0000.000

17Water TankE233.3(1)615071050m20.0000.0000.000114.2(1)717571225m30.0000.0005.1(1)51257875m30.0000.0007.1(5)41007700m30.0000.0007.1(6)41007700m30.0000.0007.1(8)41007700m30.0000.0007.941007700m30.0000.0008.1(1)2507350m30.0000.0009.6717571225jam0.0000.000

18Wheel LoaderE153.2(2)615071050m30.0000.0000.000334.2(1)717571225m30.0000.0005.1(1)51257875m30.0000.0005.1(2)51257875m30.0000.0006.3(5)922571575m20.0000.0006.3(6)922571575m30.0000.0006.3(6)a922571575m30.0000.0006.3(7)922571575m30.0000.0008.1(1)2507350m30.0000.0008.1(5)2507350m30.0000.0009.9717571225jam0.0000.000

19Pedestrian RollerE248.1(1)2507350m30.0000.0000.00011

Lalu LintasITEM PEMBAYARAN NO.: 1.8 (1)JENIS PEKERJAAN: Pemeliharaan & Perlindungan Lalu Lintas

% TERHADAP TOTAL BIAYA PROYEK =0.9430%

HARGAJUMLAHNo.U R A I A NSATUANVOL.SATUANHARGA(Rp.)(Rp.)

I.Data & Asumsi

1Jumlah lokasi pekerjaanLokasi52Total Masa Pelaksanaan ProyekHari1803Masa Pemeliharaan & Perlindungan LalinHari1354Sudah termasuk persiapan/pemasangan5Pembongkaran termasuk Demobilisasi

II.Pekerja Pengatur Lalu LintasJumlah lokasi pekerjaanLokasi51Petugas Rambu "Stop-Jalan"2Org/hari1,3508,80011,880,0002Pengendali kecepatan kendaraan2Org/hari1,3508,80011,880,0003Pemimpin Regu (Mandor)1Org/hari13513,3571,803,214

III.Bahan & PerlengkapanJumlah lokasi pekerjaanLokasi51Rambu "Stop-Jalan"Buah1025,000250,0002Rambu lain (Batas kec., hati2, dll)Buah1525,000375,0003Bendera Kuning/Hijau/MerahBuah3015,000450,0004Barikade Kayu 1/2 lebar jalanBuah10100,0001,000,0005Traffic Cone, jumlah per lokasi =5Buah2535,000875,0006Bahan Cat Pantul + Pengencer + KuasSet540,000200,0007Perlengkapan Keamanan PekerjaSet2150,0001,050,0008Perlengkapan lainnyaLS1500,000500,000

Total Biaya Pemeliharaan & Perlindungan Lalu Lintas30,263,214

Catatan :Jumlah yang tercantum pada masing-masing item di atas sudah termasuk over-head dan labaserta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.

&"Arial,Italic"&7File : &F

Jembatan SementaraITEM PEMBAYARAN NO.: 1.8 (2)JENIS PEKERJAAN: Pemasangan & Pemeliharaan Jembatan Sementara

% TERHADAP TOTAL BIAYA PROYEK =5%

HARGAJUMLAHNo.U R A I A NSATUANVOL.SATUANHARGA(Rp.)(Rp.)

I.Data & Asumsi

1Jembatan sementara jenis BailleyM22502Jembatan sementara konstruksi kayuM21503Sewa jembatan Bailley sudah termasukangkut, pasang dan bongkar4Detour diperlukanlength (m) =300M21,2005Total Masa Pelaksanaan ProyekHari1806Masa Pemeliharaan Jembatan EfektifHari90

II.Bahan & Perlengkapan

1Biaya jembatan BailleyM2250115,00028,750,0002Biaya jembatan kayuM2150100,00015,000,0003Agg.Kls.B Detourtebal (cm) =10M3120428,27451,392,8804Agg.Kls.A Detourtebal (cm) =10M3120472,97956,757,4805Prime Coat DetourLiter1,20013,19015,828,0006Sewa tanah M21,300500650,000

III.Pekerja Untuk Pemeliharaan

1Pekerja9Org/hari8108,0006,480,0002Tukang ( Batu/Cat/Las)3Org/hari27012,1433,278,5713Pemimpin Regu (Mandor)1Org/hari9012,1431,092,857

Total Biaya Pemeliharaan & Perlindungan Lalu Lintas179,229,789

Catatan :Jumlah yang tercantum pada masing-masing item di atas sudah termasuk over-head dan labaserta seluruh pajak dan bea (kecuali PPn), dan pengeluaran lainnya.

&"Arial,Italic"&7File : &F

4-Basic Price HARGA DASAR SATUAN UPAHHARGA PEROLEHAN ALAT

HARGAHARGA/hariHargaHargaSumber HARGANo.U R A I A NKODESATUANSATUAN/JAMSATUAN/HARI1,680,000.00No.Jenis AlatyangcontohHargaDataKeteranganSATUAN( Rp.)( Rp.)digunakan( Rp.)

1.Pekerja(L01)Jam8,000.0056,000.0056,000.0047,000.007,142.8650,700.001Asphalt Mixing Plant1,917,000,0003,135,000,0001,917,000,0001,917,000,000ERROR:#REF!ASPHALT MIXING PLANTE0115050T/Jam1,917,000,0002Asphalt Finisher400,600,0002,205,000,000400,600,000402,600,000385,000,000ASPHALT FINISHERE02476Ton385,000,0002.Tukang(L02)Jam12,142.8685,000.0085,000.0075,000.0010,714.2975,000.003Asphalt Sprayer132,000,00087,000,000132,000,000132,000,000126,000,000ERROR:#REF!ASPHALT SPRAYERE0315800Liter126,000,0004Bulldozer 100-150 Hp1,200,000,000900,000,0001,200,000,0001,210,000,000950,000,000BULLDOZER 100-150 HPE04140 -950,000,0003.M a n d o r(L03)Jam12,142.8685,000.0080,000.0075,000.0010,085.7167,500.005Compressor 4000-6500 L\M85,000,000110,000,00085,000,00085,800,00082,000,000ERROR:#REF!COMPRESSOR 4000-6500 L\ME0580 -82,000,0006Concrete Mixer 0.3-0.6 M339,500,000175,500,00039,500,00039,600,00038,000,000CONCRETE MIXER 0.3-0.6 M3E0615500Liter38,000,0004.Operator(L04)Jam17,142.86120,000.00120,000.00120,000.0016,428.57115,500.007Crane 10-15 Ton835,000,0001,488,000,000835,000,000836,000,000800,000,000ERROR:#REF!CRANE 10-15 TONE0715015Ton800,000,0008Dump Truck 3-4 M3207,000,000120,000,000207,000,000209,000,000207,000,000DUMP TRUCK 3-4 M3E081006Ton207,000,0005.Pembantu Operator(L05)Jam8,571.4360,000.0052,000.0050,000.006,857.1448,000.009Dump Truck320,000,000360,000,000320,000,000330,000,000300,000,000ERROR:#REF!DUMP TRUCKE091258Ton300,000,00010Excavator 80-140 Hp760,000,000850,000,000760,000,000770,000,000640,000,000EXCAVATOR 80-140 HPE10800.5M3640,000,0006.Sopir / Driver(L06)Jam11,428.5780,000.0080,000.0075,000.0011,400.0077,300.0011Flat Bed Truck 3-4 M3162,000,000330,800,000162,000,000165,000,000158,000,000ERROR:#REF!FLAT BED TRUCK 3-4 M3E111004M3158,000,00012Generator Set140,500,000207,000,000140,500,000140,800,000135,000,000GENERATOR SETE12175125KVA135,000,0007.Pembantu Sopir / Driver(L07)Jam7,428.5752,000.0052,000.0050,000.006,828.5747,800.0013Motor Grader >100 Hp635,000,000676,000,000635,000,000660,000,000545,000,000ERROR:#REF!MOTOR GRADER >100 HPE13125 -545,000,00014Track Loader 75-100 Hp623,000,000542,000,000623,000,000623,700,000600,000,000TRACK LOADER 75-100 HPE14901.6M3600,000,0008.Mekanik(L08)Jam11,428.5780,000.0080,000.0075,000.0010,714.2975,000.0015Wheel Loader 1.0-1.6 M3670,000,000564,000,000670,000,000715,000,000600,000,000ERROR:#REF!WHEEL LOADER 1.0-1.6 M3E151051.5M3600,000,00016Three Wheel Roller 6-8 T264,000,000350,000,000264,000,000264,000,000252,000,000THREE WHEEL ROLLER 6-8 TE16558Ton252,000,0009.Pembantu Mekanik(L09)Jam7,428.5752,000.0052,000.0050,000.006,828.5747,800.0017Tandem Roller 6-8 T.360,000,0001,195,425,000360,000,000366,300,000350,000,000ERROR:#REF!TANDEM ROLLER 6-8 T.E17508Ton350,000,00018Tire Roller 8-10 T.386,100,000900,000,000386,100,000386,100,000370,000,000TIRE ROLLER 8-10 T.E186010Ton370,000,00010.Kepala Tukang(L10)Jam14,285.71100,000.00100,000.0080,000.0013,700.0090,100.0019Vibratory Roller 5-8 T.431,200,000918,787,500431,200,000431,200,000415,000,000ERROR:#REF!VIBRATORY ROLLER 5-8 T.E19757Ton415,000,00020Concrete Vibrator21,120,0004,000,00021,120,00021,120,00020,000,000CONCRETE VIBRATORE2010 -20,000,00021Stone Crusher665,000,0001,010,989,671665,000,000693,000,000665,000,000STONE CRUSHERE2122030T/Jam665,000,00022Water Pump 70-100 Mm19,800,0005,000,00019,800,00019,800,00019,000,000WATER PUMP 70-100 mmE226 -19,000,00023Water Tanker 3000-4500 L.144,500,000105,000,000144,500,000145,200,000140,000,000WATER TANKER 3000-4500 L.E231004000Liter140,000,00024Pedestrian Roller77,000,000150,000,00077,000,00077,000,00075,000,000PEDESTRIAN ROLLERE24110.98Ton75,000,00025Tamper29,000,00017,000,00029,000,00029,150,00028,000,000TAMPERE2550.17Ton28,000,00026Jack Hammer29,150,00035,000,00029,150,00029,150,00028,000,000JACK HAMMERE263 -28,000,00027Fulvi Mixer159,500,000900,000,000159,500,000159,500,000153,000,000FULVI MIXERE2775 -153,000,00028Concrete Pump175,000,000112,500,000175,000,000176,000,000170,000,000CONCRETE PUMPE281008M3170,000,00029Trailer 20 Ton372,900,000600,000,000372,900,000372,900,000360,000,000TRAILER 20 TONE2917520Ton360,000,00030Pile Driver + Hammer122,100,000875,000,000122,100,000122,100,000118,000,000PILE DRIVER + HAMMERE30252.5Ton118,000,00031Crane On Track 35 Ton1,000,000,000850,000,0001,000,000,0001,000,000,000850,000,000CRANE ON TRACK 35 TONE3112535Ton850,000,00032Welding Set23,100,00017,500,00023,100,00023,100,00022,100,000WELDING SETE3240250Amp22,100,00033Bore Pile Machine2,250,000,0002,250,000,0002,250,000,0002,250,000,0002,180,000,000BORE PILE MACHINEE331502000Meter2,180,000,000DAFTAR34Asphalt Liquid Mixer16,500,00015,000,00016,500,00016,500,00016,000,000ASPHALT LIQUID MIXERE3451000Liter16,000,000HARGA DASAR SATUAN BAHAN35Trailler 15 Ton276,000,000450,000,000276,000,000276,000,000276,000,00036Rock Drill Breaker0900,000,000000HARGA37Cold Milling04,945,000,000000HARGANo.U R A I A NKODESATUANSATUANKETERANGAN519,400.0038Cold Recycler019,500,000,000000SATUAN( Rp.)HARGA SAT TK.139Hot Recycler029,250,000,000000( Rp.)40Aggregat (chip) Spreader0395,000,0000001Pasir Pasang (Sedang)M01bM3148,400.00 Base Camp108,000.0028,400.00120,000.00111,000.0041Asphalt Distribution0395,000,000000148,400.002Pasir Beton (Kasar)M01aM3157,400.00 Base Camp17,400.00140,000.00113,100.0042Split Form Paver01,337,142,857000-3Pasir Halus (untuk HRS)M01cM3120,000.00 Base Camp120,000.0028,400.00120,000.00120,000.0043Concrete Pan Mixer405,000,0001,000,000,000405,000,000405,000,000405,000,000120,000.004Pasir Urug (ada unsur lempung)M01dM3110,000.00 Base Camp110,000.00110,000.00113,100.0044Concrete Breaker29,150,000900,000,00029,150,00029,150,00029,150,000-5Batu KaliM02M3155,600.00 Lokasi Pekerjaan21,840.00133,760.00134,900.0045Asphalt Tanker0500,000,000000155,600.006Agregat KasarM03M3231,714.81 Base Camp45,924.80185,790.01195,704.6446Cement Tanker0500,000,000000231,714.817Agregat HalusM04M3231,714.81 Base Camp42,314.75189,400.06195,704.6447Concrete Mixer (350)035,000,000000231,714.818F i l l e rM05Kg1,300.00 Proses/Base Camp1,300.00250.001,050.001,300.0048Vibrating Rammer020,000,0000001,040.009Batu Belah / KerakalM06M3165,800.00 Lokasi Pekerjaan25,800.00140,000.00150,200.0049Truk Mixer405,000,000750,000,000405,000,000405,000,000405,000,000-10G r a v e lM07M3160,000.00 Base Camp28,000.00132,000.00122,500.0050Bore Pile Machine Dia 6001,170,000,000000-11Bahan Tanah TimbunanM08M360,000.00 Borrow Pit/quarry10,000.0050,000.0028,500.0051Crane On Track 75 - 100Ton0900,000,000000-12Bahan PilihanM09M380,000.00 Quarry10,000.0070,000.0071,000.0052Blending Equipment0500,000,000000-13Aspal Semen Pen.60/70 atau Pen.80/100M10TON13,500,000.00 Base Camp13,500,000.009,000,000.0053Asphalt Liquid Mixer (kap 20000)0150,000,00000013,500,000.00M10Kg13,500.00 Base Camp13,500.004,022.009,478.009,000.0054Alat tambahan Batubara Direct0300,000,000000-14Kerosen / Minyak TanahM11LITER7,350.00 Base Camp7,350.001,850.005,500.006,500.0055Alat tambahan Gas Batubara 0800,000,0000006,000.0015Semen / PC (40kg)M12Zak52,000.00 Base Camp50,190.0010,000.0042,000.0058,600.0056Chain Saw00058,000.0016Semen / PC (kg)M12Kg1,300.00 Base Camp250.001,050.001,465.001,040.0017Besi Beton PolosM13Kg13,650.00 Lokasi Pekerjaan13,650.003,150.0010,500.0013,000.0011,400.0018Kawat BetonM14Kg21,100.00 Lokasi Pekerjaan21,100.007,100.0014,000.0020,000.0016,500.0019Kawat BronjongM15Kg19,200.00 Lokasi Pekerjaan19,200.00(90,800.00)110,000.0020,000.00Harga 1 drum Aspal Curah1,159,450.001,050,000.0019,500.00Kawat Bronjong PabrikanM15aUnit495,000.00 Lokasi Pekerjaan495,000.0095,000.00400,000.00400,000.0020S i r t uM16M3136,900.00 Lokasi Pekerjaan(3,100.00)140,000.00131,700.001 drum = 155 kg155.00-21Cat Marka (Non Thermoplas)M17aKg65,000.00 Lokasi Pekerjaan65,000.0015,500.0049,500.00- 0Drum/kg7,480.3259,400.0022Cat Marka (Thermoplastic)M17bKg78,000.00 Lokasi Pekerjaan78,000.0023,000.0055,000.00- 0PPn 10%748.0365,000.0023P a k uM18Kg18,375.00 Lokasi Pekerjaan18,375.006,375.0012,000.0015,000.00Ongkos Angkut 7%523.62523.6217,000.0024Kayu PerancahM19M33,100,000.00 Lokasi Pekerjaan3,100,000.00(600,000.00)3,700,000.003,700,000.00Over Head&Profit 10% (Bongkar,Muat)748.031,250,000.00Papan Perancah/Papan BekistingM19aM32,900,000.00 Lokasi Pekerjaan2,900,000.00(300,000.00)3,200,000.003,200,000.0025B e n s i nM20LITER8,715.00 Pertamina8,715.003,063.005,652.004,970.00Jumlah Harga Aspal/Kg9,500.00(22.00)4,970.0026S o l a rM21LITER8,200.00 Pertamina8,200.001,700.006,500.005,450.005,450.0027Minyak Pelumas / OlieM22LITER44,500.00 Pertamina44,500.0014,500.0030,000.0030,000.00ERROR:#REF!30,000.0028Plastik FilterM23M214,000.00 Lokasi Pekerjaan14,000.003,500.0010,500.00- 0ERROR:#REF!15,000.0029Pipa Galvanis Dia. 3"M24Batang340,000.00 Lokasi Pekerjaan340,000.0030,000.00310,000.00512,000.00502,000.00M'56,660.00ERROR:#REF!-56,660.0085,330.0056,660.0030Pipa PorusM25M'25,000.00 Lokasi Pekerjaan25,000.009,250.0015,750.00- 040,000.0031Bahan Agr.Base Kelas AM26M3228,483.39 Base Camp33,769.83194,713.56193,628.66Wheel Loader-32Bahan Agr.Base Kelas BM27M3196,272.50 Base Camp51,559.03144,713.47178,559.51Dump Truck-33Bahan Agr.Base Kelas CM28M3145,000.00 Base Camp145,000.0041,176.56103,823.44- 0Motor Grader-34Bahan Agr.Base Kelas C2M29M3- Tidak tersedia-- 0Tandem Roller-35Geotextile non woven Penyaringan Badan JalanM30aM277,000.00 Lokasi Pekerjaan77,000.0022,000.0055,000.0055,000.00Water Tanker40,000.00Geotextile non woven Penyaringan Pada SaluranM30bM246,000.00 Lokasi Pekerjaan46,000.0011,000.0035,000.0035,000.0036Geotextile Sand ContainerM31M2450,000.00 Lokasi Pekerjaan450,000.0051,000.00399,000.00399,000.0037GeogridM32M257,750.00 Lokasi Pekerjaan-57,750.0057,750.0038Aspal EmulsiM33Kg13,500.00 Base Camp4,022.009,478.009,478.0012,700.0039Gebalan Rumput Gajah MiniM34M280,000.00 Lokasi Pekerjaan80,000.0020,000.0060,000.0060,000.0022,000.0040ThinnerM35LITER23,000.00 Lokasi Pekerjaan23,000.0012,000.0011,000.00- 012,000.0041Glass BeadM36Kg300,000.00 Lokasi Pekerjaan273,250.0026,750.00- 028,600.0042Pelat Rambu (Eng. Grade)M37aBH90,000.00 Lokasi Pekerjaan90,000.0015,000.0075,000.00- 0176,000.0043Pelat Rambu (High I. Grade)M37bBH115,000.00 Lokasi Pekerjaan115,000.0015,000.00100,000.00- 0216,500.0044Rel PengamanM38M'60,000.00 Lokasi Pekerjaan60,000.005,000.0055,000.00- 055,000.0045Beton K-250M39M31,545,669.00 Lokasi Pekerjaan330,632.001,215,037.001,931,604.391,893,333.2646Baja Tulangan (Polos) U24M39aKg13,650.00 Lokasi Pekerjaan13,650.003,150.0010,500.0013,000.0012,500.0047Baja Tulangan (Ulir) D32M39bKg18,500.00 Lokasi Pekerjaan18,500.004,000.0014,500.0016,000.0017,100.0048KapurM40M3595,000.00 Hasil Proses595,000.0010,000.00585,000.00- 040,000.0049ChippingM41M3190,000.00 Base Camp190,000.004,209.17185,790.83195,704.64231,714.81M41Kg100.81 Base Camp100.81103.83122.9450CatM42Kg30,000.00 Base Camp30,000.0030,000.00-30,000.0028,000.0039,600.0051Pemantul Cahaya (Reflector)M43Bh.12,000.00 Base Camp12,000.0010,000.002,000.0010,000.00- 012,600.0052Pasir UrugM44M3131,700.00 Base Camp123,912.0021,700.00110,000.00107,000.00-53ArbocellM45Kg.26,000.00 Base Camp26,000.0025,000.001,000.0025,000.0045,000.0032,000.0054Baja BergelombangM46Kg18,000.00 Lokasi Pekerjaan18,000.0015,000.003,000.0015,000.0017,000.0012,500.0055Beton K-125M47M3970,657.00 Lokasi Pekerjaan889,275.00108,691.78861,965.22973,164.67882,416.3456Baja StrukturM48Kg31,000.00 Pelabuhan terdekat31,000.0014,500.0016,500.0014,500.007,000.0011,000.0057Tiang Pancang BajaM49M'175,000.00 Lokasi Pekerjaan175,000.00166,623.148,376.86166,623.143,373,805.9325,247.3758Tiang Pancang Beton PratekanM50M3170,000.00 Pelabuhan terdekat170,000.00160,650.009,350.00160,650.00424,000.00423,957.9359Kawat LasM51Dos55,000.00 Lokasi Pekerjaan55,000.0055,000.00-55,000.0074,000.0065,000.0060Pipa BajaM52Kg6,500.00 Pelabuhan terdekat6,500.005,500.001,000.005,500.0012,000.0017,000.0061Minyak FluksM53Liter550.00 Base Camp550.00550.00-550.001,300.006,237.0062Bunker OilM54Liter600.00 Base Camp600.00600.00-600.00- 03,000.0063Asbuton HalusM55Ton345,000.00 Base Camp345,000.00315,000.0030,000.00315,000.00- 0325,000.0064Baja PrategangM56Kg13,000.00 Base Camp13,000.0012,000.001,000.0012,000.00- 08,000.0065Baja Tulangan (Polos) U32M57aKg13,650.00 Lokasi Pekerjaan10,500.003,150.0010,500.008,400.008,400.0066Baja Tulangan (Ulir) D39M39cKg18,500.00 Lokasi Pekerjaan12,500.006,000.0012,500.008,450.008,450.0067Baja Tulangan (Ulir) D48M39dKg22,000.00 Lokasi Pekerjaan17,500.004,500.0017,500.009,000.009,000.0068PCI Girder L=13mM58aBuah99,000,000.00 Pelabuhan terdekat99,000,000.00-99,000,000.00- 086,000,000.0069PCI Girder L=16mM58bBuah40,455,000.00 Pelabuhan terdekat40,455,000.00-40,455,000.00- 097,000,000.0070PCI Girder L=18mM58cBuah48,305,000.00 Pelabuhan terdekat48,305,000.00-48,305,000.00- 0124,000,000.0071PCI Girder L=22mM58dBuah140,000,000.00 Pelabuhan terdekat140,000,000.00-140,000,000.00- 0157,000,000.0072PCI Girder L=25mM58eBuah152,995,500.00 Pelabuhan terdekat152,995,500.00-152,995,500.00- 0168,000,000.0073PCI Girder L=28mM58fBuah197,329,376.00 Pelabuhan terdekat197,329,376.00-197,329,376.00- 0192,000,000.0074Beton K-300M59M32,011,868.67 Lokasi Pekerjaan1,840,068.002,011,868.671,860,597.741,828,971.5275Beton K-175M60M31,234,759.38 Lokasi Pekerjaan1,136,063.131,234,759.381,187,203.021,122,508.5276CerucukM61M---- 015,000.0077Elastomer M62buah---- 0300,000.0078Bahan pengawet: kreosotM63liter---- 05,000.0079Mata KucingM64buah---- 075,000.0076AnchorageM65buah780,000.00720,000.00780,000.00- 0480,000.0077Anti strpping agentM66liter46,000.0024,000.0046,000.00- 046,000.0078Bahan ModifikasiM67Kg---- 040,000.0078Beton K-500M68M32,898,685.782,665,487.802,898,685.782,794,403.83-79Beton K-400M69M32,792,600.672,572,335.512,792,600.672,681,361.23-80Ducting (Kabel prestress)M70M'---- 0150,000.0081Ducting (Strand prestress)M71M'---- 050,000.0080Beton K-350M72M32,736,435.282,530,262.832,736,435.282,632,173.96-81Multipleks 12 mmM73Lbr---- 0181,500.0081Elastomer jenis 1M74abuah678,000.00 Base Camp678,000.00-678,000.00- 0385,500.0082Elastomer jenis 2M74bbuah- Base Camp--- 0650,000.0083Elastomer jenis 3M74cbuah- Base Camp--- 0838,000.0084Expansion Tipe Joint Asphaltic PlugM75dM- Base Camp--- 01,000,000.0085Expansion Join Tipe RubberM75eM- Base Camp--- 01,200,000.0082Expansion Join Baja SikuM75fM750,000.00 Base Camp750,000.00-750,000.00- 0275,000.0083MarmerM76Buah- Base Camp--- 0400,000.0084Kerb Type AM77Buah- Base Camp--- 045,000.0083Paving BlockM78Buah60,000.00 Lokasi Pekerjaan60,000.0060,000.00- 040,000.0084Mini Timber PileM79Buah- Lokasi Pekerjaan--- 027,000.0085Expansion Joint Tipe TormaM80M1- Lokasi Pekerjaan--- 01,200,000.0086Strip BearingM81Buah- Lokasi Pekerjaan--- 0229,500.0087Joint Socket Pile 35x35M82Set- Lokasi Pekerjaan--- 0607,500.0088Joint Socket Pile 16x16x16M83Set- Lokasi Pekerjaan--- 067,500.0089Mikro Pile 16x16x16M84M1- Lokasi Pekerjaan--- 060,750.0090Matras ConcreteM85Buah- Lokasi Pekerjaan--- 0405,000.0091AssetillineM86Botol- Lokasi Pekerjaan--- 0229,500.0084OxygenM87Botol366,300.00 Lokasi Pekerjaan366,300.00366,300.00366,300.00114,750.0085Batu BaraM88Kg600.00 Lokasi Pekerjaan600.00600.00- 0600.0086Pipa Galvanis Dia 3"M24aM565,000.00-565,000.00- 020,000.0087Pipa Galvanis Dia 1,5"M24bM200,000.00-200,000.00- 015,000.0088Agregat Pecah Mesin 0-5 mmM91M3231,714.81Base Camp216,487.94231,714.81195,704.64-89Agregat Pecah Mesin 5-10 & 10-20 mmM92M3231,714.81Base Camp216,487.94231,714.81195,704.64-90Agregat Pecah Mesin 20-30 mmM93M3231,714.81Base Camp216,487.94231,714.81195,704.64-91Joint SealentM94Kg---- 034,100.0092Cat Anti KaratM95Kg---- 035,750.0093Expansion CapM96M2---- 06,050.0094Polytene 125 mikronM97Kg---- 019,250.0095Curing CompoundM98Ltr---- 038,500.0091Kayu AcuanM99M33,100,000.003,000,000.003,100,000.003,700,000.003,100,000.0092AdditiveM67aLtr---- 038,500.0093CasingM100M2---- 09,000.0094Pasir TailingM3-Base Camp--- 0259,000.0095Polimer-Base Camp--- 045,000.0092Kerb jenis 1 (60 cm)Buah90,000.0090,000.0090,000.00- 045,000.0093Kerb jenis 2 (40 cm)Buah75,000.0075,000.0075,000.00- 050,000.0094Kerb jenis 3Buah---- 055,000.0094Aditif anti pengelupasanKg80,000.0040,000.0038,000.0080,000.0038,000.0038,000.0095Bahan Pengisi (Filler) TambahanKg1,300.001,150.001,300.001,300.00-96Asbuton yang diprosesKg---- 030,000.0097Elastomer AlamKg---- 030,000.0098Elastomer SintesisKg---- 030,000.0096PohonBatang45,000.0025,000.0045,000.0025,000.0020,000.0097Tanah humus setebal 20 cmKg---- 05,000.0098PupukKg---- 05,000.0099Patok Pengarah (Deliniator)Buah---- 0168,000.0097Rangka BajaM53aKg32,500.00Pabrikasi28,000.0032,500.0028,000.00

4-Analisa QuarryHARGA & JARAK RATA-RATADARI SUMBER BAHAN (QUARRY)

HARGAJARAKERROR:#REF!Agregat kasar231,714.81199,102.51No.U R A I A NSATUANROYALTYQUARRYKET.Agregat halus231,714.81200,037.32(Rp)( Km )Harga Gub.OE1.M01 - Pasir PasangM374,00016.00 Ke Base Camp148,400.000.8125,750.0020.00117,900.00148,400.003000040000040000M01 - Pasir BetonM374,00016.00 Ke Lokasi Pek.157,400.000.8920,000.007.00132,100.00157,400.0030000

2.M02 - Batu KaliM367,00016.00 Ke Lokasi Pek.155,600.00140,0000.8619,500.0020.00145,400.00155,600.0040000

3.M06 - Batu Belah/Batu Quarry BesarM356,00016.00 Ke Lokasi Pek.165,800.000.849,000.0025.00163,200.00165,800.00

4.M07 - G r a v e lM346,08116.00 Ke Base Camp160,000.000.838,000.0025.00135,000.00160,000.00,5.M10 - Aspal Cement (Pelabuhan)KG- Ke Base Camp190.00

6.M16 - S i r t uM359,50016.00 Ke Lokasi Pek.136,900.001.0217,500.0020.00249,300.00136,900.00ERROR:#REF!

7.M44 - Pasir UrugM357,33516.00 Ke Lokasi Pek.131,700.000.1618,000.0015.00113,300.00131,700.00

8M08 - Tanah TimbunM360,00016.00 Ke Lokasi Pek.60,000.000.8320,300.0010.00ERROR:#REF!ERROR:#REF!53,800.00dftr upah-bahan

9M09 - Material PilihanM380,00016.00 Ke Lokasi Pek.80,000.000.8820,300.0010.00ERROR:#REF!ERROR:#REF!128,000.00dftr upah-bahan

Catatan : Harga Royalty sudah ditambah biaya retribusi sebesar Rp. 300,-/m3228,483.39196,272.50

ROYALTI120,000

Catatan :

Patumbak - Medan = 10 kmMedan - Lokasi KEGIATAN = 165.20 kmTotal Sumber Quarry Patumbak s/d Lokasi KEGIATAN = 175.20 km

Lokasi KEGIATAN - Base Camp = 8.73 kmTotal Sumber Quarry Patumbak s/d Base Camp = 176.73 km

Jarak Quarry Bt. Kali/Belah ke B. Camp diperkirakan = 50 kmJarak Quarry Bt. Kali/Belah ke Lokasi KEGIATAN diperkirakan = 45 kmJarak Quarry Pasir ke Base Camp diperkirakan = 18.73 kmJarak Quarry Pasir ke Lokasi KEGIATAN diperkirakan = 10 km

ANALISA HARGA DASAR SATUAN BAHAN

Jenis:M01a - Pasir PasangLokasi:QuarryTujuan:Base Camp

HARGANo.URAIANKODEKOEF.SATUANSATUAN(Rp.)

I.ASUMSI1Menggunakan alat berat2Kondisi Jalan : baik3Jarak Quarry ke lokasi Base CampL16.00Km4Harga satuan pasir di QuarryRpM011.00M374,000.005Harga Satuan Dasar ExcavatorRpE101.00Jam338,039.296Harga Satuan Dasar Dump TruckRpE081.00Jam224,919.657Berat volume pasirBil1.42ton/m3

II.URUTAN KERJA1Pasir digali dengan Excavator2Excavator sekaligus memuat pasir hasilgalian ke dalam Dump Truck3Dump Truck mengangkut pasir ke lokasiBase Camp

III.PERHITUNGAN

EXCAVATOR(E10)Kapasitas BucketV0.50M3Faktor BucketFb0.90-Faktor Efisiensi alatFa0.83-Waktu siklusTs1- Menggali / memuatT10.50menit- Lain-lainT20.50menitTs11.00menitKap. Prod. / jam =V x Fb x Fa x 60Q122.41M3 / JamTs1

Biaya Excavator / M3 = (1 : Q1) x RpE10Rp115,084.31Rupiah

DUMP TRUCK(E08)Kapasitas bakV6.00tonFaktor efisiensi alatFa0.83-Kecepatan rata-rata bermuatanv140.00KM/JamKecepatan rata-rata kosongv250.00KM/JamWaktu siklusTs2 - Muat = (V x 60)/Q1 x Bil)T111.31menit- Waktu tempuh isi = (L/v1) x 60T224.00menit- Waktu tempuh kosong = (L/v2) x 60T319.20menit- Lain-lainT41.00menitTs255.51menit

Bersambung ANALISA HARGA DASAR SATUAN BAHAN

Jenis:M01a - Pasir PasangLokasi:QuarryTujuan:Base Camp

Lanjutan HARGANo.URAIANKODEKOEF.SATUANSATUAN(Rp.)

Kapasitas Produksi / Jam =V x Fa x 60Q23.79M3 / JamTs2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08Rp259,337.43Rupiah

IV.HARGA SATUAN DASAR BAHANDI LOKASI BASE CAMP

Harga Satuan Dasar Pasir =

( RpM01 + Rp1 + Rp2 )M01148,421.73Rupiah

Dibulatkan :M01148,400.00Rupiah

ANALISA HARGA DASAR SATUAN BAHAN

Jenis:M02 - Batu KaliLokasi:QuarryTujuan:Lokasi Pekerjaan

HARGANo.URAIANKODEKOEF.SATUANSATUAN(Rp.)

I.ASUMSI1Menggunakan alat berat2Kondisi Jalan : baik3Jarak Quarry ke Lokasi PekerjaanL16.00Km4Harga satuan batu kali di QuarryRpM021.00M367,000.005Harga Satuan Dasar ExcavatorRpE101.00Jam338,039.296Harga Satuan Dasar Dump TruckRpE081.00Jam224,919.657Berat volume batu kaliBil1.44ton/m3

II.URUTAN KERJA1Batu kali digali dengan Excavator2Excavator sekaligus memuat batu kalihasil galian ke dalam Dump Truck3Dump Truck mengangkut batu kali kelokasi pekerjaan

III.PERHITUNGAN

EXCAVATOR(E10)Kapasitas BucketV0.50M3Faktor BucketFb0.90-Faktor Efisiensi alatFa0.83-Waktu siklusTs1- Menggali / memuatT10.50menit- Lain-lainT21.00menitTs11.50menitKap. Prod. / jam =V x Fb x Fa x 60Q114.94M3 / JamTs1

Biaya Excavator / M3 = (1 : Q1) x RpE10Rp122,626.46Rupiah

DUMP TRUCK(E08)Kapasitas bakV6.00tonFaktor efisiensi alatFa0.83-Kecepatan rata-rata bermuatanv140.00KM/JamKecepatan rata-rata kosongv250.00KM/JamWaktu siklusTs2 - Muat = (V x 60)/(Q1 x Bil)T116.73menit- Waktu tempuh isi = (L/v1) x 60T224.00menit- Waktu tempuh kosong = (L/v2) x 60T319.20menit- Lain-lainT41.00menitTs260.93menit

Bersambung ANALISA HARGA DASAR SATUAN BAHAN

Jenis:M02 - Batu KaliLokasi:QuarryTujuan:Lokasi Pekerjaan

Lanjutan HARGANo.URAIANKODEKOEF.SATUANSATUAN(Rp.)

Kapasitas Produksi / Jam =V x Fa x 60Q23.41M3 / JamTs2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08Rp266,048.98Rupiah

IV.HARGA SATUAN DASAR BAHANDI LOKASI PEKERJAAN

Harga Satuan Dasar Batu kali =

( RpM02 + Rp1 + Rp2 )M02155,675.44Rupiah

Dibulatkan :M02155,600.00Rupiah

ANALISA HARGA DASAR SATUAN BAHAN

Jenis:M06 - Batu BelahLokasi:QuarryTujuan:Lokasi Pekerjaan

HARGANo.URAIANKODEKOEF.SATUANSATUAN(Rp.)

I.ASUMSI1Menggunakan alat berat2Kondisi Jalan : baik3Jarak Quarry ke Lokasi PekerjaanL16.00Km4Harga satuan batu kali di QuarryRpM061.00M356,000.005Harga Satuan Dasar ExcavatorRpE101.00Jam338,039.296Harga Satuan Dasar Dump TruckRpE081.00Jam224,919.657Harga Satuan Dasar Wheel LoaderRpE151.00Jam351,594.418Harga Satuan Upah PekerjaRpL011.00Jam8,000.009Berat volume batu belahBil 1.60ton/m3

II.URUTAN KERJA1Batu kali digali dengan Excavator2Batu kali dibelah oleh Pekerja3Dengan Wheel Loader batu belah dimuatke Dump Truck yang mengangkut batubelah ke lokasi pekerjaanIII.PERHITUNGAN

3.a EXCAVATOR(E10)Kapasitas BucketV0.50M3Faktor BucketFb0.75-Faktor Efisiensi alatFa0.83-Waktu siklusTs1- Menggali / memuatT10.75menit- Lain-lainT20.50menitTs11.25menitKap. Prod. / jam =V x Fb x Fa x 60Q114.94M3 / JamTs1

Biaya Excavator / M3 = (1 : Q1) x RpE10Rp122,626.46Rupiah

3.b WHEEL LOADER(E15)Kapasitas BucketV1.50M3Faktor BucketFb0.75-Faktor Efisiensi AlatFa0.83-Waktu sklusTs1- MuatT10.75menit- Lain-lainT20.50menitTs11.25menitKapasitas Produksi / Jam =V x Fb x Fa x 60Q244.82M3 / JamTs1Biaya Excavator / M3 = (1 : Q2) x RpE15Rp27,844.59Rupiah

Bersambung ANALISA HARGA DASAR SATUAN BAHAN

Jenis:M06 - Batu BelahLokasi:QuarryTujuan:Lokasi Pekerjaan

Lanjutan HARGANo.URAIANKODEKOEF.SATUANSATUAN(Rp.)

3.c DUMP TRUCK(E08)Kapasitas bakV6.00tonFaktor efisiensi alatFa0.83-Kecepatan rata-rata bermuatanv140.00KM/JamKecepatan rata-rata kosongv250.00KM/JamWaktu siklusTs2 - Muat = (V x 60)/(Q1 x Bil)T115.06menit- Waktu tempuh isi = (L/v1) x 60T224.00menit- Waktu tempuh kosong = (L/v2) x 60T319.20menit- Lain-lainT41.00menitTs259.26menit

Kapasitas Produksi / Jam =V x Fa x 60Q33.15M3 / JamTs2 x Bil

Biaya Dump Truck / M3 = (1 : Q3) x RpE08Rp371,372.38Rupiah

3.d PEKERJA

Produksi menentukan : ExcavatorQ114.94M3 / JamHasil galian batu / hari = Q1 x 7 JamQt104.58M3 / 7 jamKebutuhan PekerjaP15.00Orang

Biaya Pekerja / M3 = { (7 Jam x P) : Qt } x RpL01Rp48,032.13Rupiah

IV.HARGA SATUAN DASAR BAHANDI LOKASI PEKERJAAN

Harga Satuan Dasar Batu belah =

( RpM06 + Rp1 + Rp2 + Rp3 + Rp4 )M06165,875.56Rupiah

Dibulatkan :M06165,800.00Rupiah

ANALISA HARGA DASAR SATUAN BAHAN

Jenis:M07 - GravelLokasi:QuarryTujuan:Base Camp

HARGANo.URAIANKODEKOEF.SATUANSATUAN(Rp.)

I.ASUMSI1Menggunakan alat berat2Kondisi Jalan : baik3Jarak Quarry ke Lokasi PekerjaanL16.00Km4Harga satuan Gravel di QuarryRpM071.00M346,081.005Harga Satuan Dasar ExcavatorRpE101.00Jam338,039.296Harga Satuan Dasar Dump TruckRpE081.00Jam224,919.657Berat volume gravelBil2.20ton/m3

II.URUTAN KERJA1Gravel digali dengan Excavator2Excavator sekaligus memuat gravelhasil galian ke dalam Dump Truck3Dump Truck mengangkut gravel kelokasi pekerjaan

III.PERHITUNGAN

EXCAVATOR(E10)Kapasitas BucketV0.50M3Faktor BucketFb0.75-Faktor Efisiensi alatFa0.83-Waktu siklusTs1- Menggali / memuatT10.75menit- Lain-lainT20.50menitTs11.25menitKap. Prod. / jam =V x Fb x Fa x 60Q114.94M3 / JamTs1

Biaya Excavator / M3 = (1 : Q1) x RpE10Rp122,626.46Rupiah

DUMP TRUCK(E08)Kapasitas bakV6.00tonFaktor efisiensi alatFa0.83-Kecepatan rata-rata bermuatanv140.00KM/JamKecepatan rata-rata kosongv250.00KM/JamWaktu siklusTs2 - Muat = (V x 60)/(Q1 x Bil)T110.95menit- Waktu tempuh isi = (L/v1) x 60T224.00menit- Waktu tempuh kosong = (L/v2) x 60T319.20menit- Lain-lainT41.00menitTs255.15menit

Bersambung ANALISA HARGA DASAR SATUAN BAHAN

Jenis:M07 - GravelLokasi:QuarryTujuan:Base Camp

Lanjutan HARGANo.URAIANKODEKOEF.SATUANSATUAN(Rp.)

Kapasitas Produksi / Jam =V x Fa x 60Q22.46M3 / JamTs2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08Rp291,335.13Rupiah

IV.HARGA SATUAN DASAR BAHANDI LOKASI BASE CAMP

Harga Satuan Dasar Gravel =

( RpM07 + Rp1 + Rp2 )M07160,042.59Rupiah

Dibulatkan :M07160,000.00Rupiah

ANALISA HARGA DASAR SATUAN BAHAN

Jenis:M16 - SirtuLokasi:QuarryTujuan:Lokasi Pekerjaan

HARGANo.URAIANKODEKOEF.SATUANSATUAN(Rp.)

I.ASUMSI1Menggunakan alat berat2Kondisi Jalan : baik3Jarak Quarry ke lokasi Base CampL16.00Km4Harga satuan Sirtu di QuarryRpM161.00M359,500.005Harga Satuan Dasar ExcavatorRpE101.00Jam338,039.296Harga Satuan Dasar Dump TruckRpE081.00Jam224,919.657Berat volume sirtuBil1.51ton/m3

II.URUTAN KERJA1Sirtu digali dengan Excavator2Excavator sekaligus memuat sirtu hasilgalian ke dalam Dump Truck3Dump Truck mengangkut sirtu ke lokasiBase Camp

III.PERHITUNGAN

EXCAVATOR(E10)Kapasitas BucketV0.50M3Faktor BucketFb0.90-Faktor Efisiensi alatFa0.83-Waktu siklusTs1- Menggali / memuatT10.50menit- Lain-lainT20.50menitTs11.00menitKap. Prod. / jam =V x Fb x Fa x 60Q122.41M3 / JamTs1

Biaya Excavator / M3 = (1 : Q1) x RpE10Rp115,084.31Rupiah

DUMP TRUCK(E08)Kapasitas bakV6.00tonFaktor efisiensi alatFa0.83-Kecepatan rata-rata bermuatanv140.00KM/JamKecepatan rata-rata kosongv250.00KM/JamWaktu siklusTs2 - Muat = (V x 60)/(Q1 x Bil)T110.64menit- Waktu tempuh isi = (L/v1) x 60T224.00menit- Waktu tempuh kosong = (L/v2) x 60T319.20menit- Lain-lainT41.00menitTs254.84menit

Bersambung ANALISA HARGA DASAR SATUAN BAHAN

Jenis:M16 - SirtuLokasi:QuarryTujuan:Lokasi Pekerjaan

Lanjutan HARGANo.URAIANKODEKOEF.SATUANSATUAN(Rp.)

Kapasitas Produksi / Jam =V x Fa x 60Q23.61M3 / JamTs2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08Rp262,331.84Rupiah

IV.HARGA SATUAN DASAR BAHANDI LOKASI PEKERJAAN

Harga Satuan Dasar Sirtu =

( RpM16 + Rp1 + Rp2 )M16136,916.15Rupiah

Dibulatkan :M16136,900.00Rupiah

ANALISA HARGA DASAR SATUAN BAHAN

Jenis:M44 - Pasir UrugLokasi:QuarryTujuan:Lokasi PekerjaanHARGANo.URAIANKODEKOEF.SATUANSATUAN(Rp.)

I.ASUMSI1Menggunakan alat berat2Kondisi Jalan : baik3Jarak Quarry ke lokasi pekerjaanL16.00Km4Harga satuan pasir urug di QuarryRpM441.00M357,335.005Harga Satuan Dasar ExcavatorRpE101.00Jam338,039.296Harga Satuan Dasar Dump TruckRpE081.00Jam224,919.657Berat volume pasir urugBil1.42ton/m3

II.URUTAN KERJA1pasir urug digali dengan Excavator2Excavator sekaligus memuat pasir urughasil galian ke dalam Dump Truck3Dump Truck mengangkut pasir urugke lokasi pekerjaan

III.PERHITUNGAN

EXCAVATOR(E10)Kapasitas BucketV0.50M3Faktor BucketFb0.90-Faktor Efisiensi alatFa0.83-Waktu siklusTs1- Menggali / memuatT10.50menit- Lain-lainT20.50menitTs11.00menitKap. Prod. / jam =V x Fb x Fa x 60Q122.41M3 / JamTs1

Biaya Excavator / M3 = (1 : Q1) x RpE10Rp115,084.31Rupiah

DUMP TRUCK(E08)Kapasitas bakV6.00tonFaktor efisiensi alatFa0.83-Kecepatan rata-rata bermuatanv140.00KM/JamKecepatan rata-rata kosongv250.00KM/JamWaktu siklusTs2 - Muat = (V x 60)/(Q1 x Bil)T111.31menit- Waktu tempuh isi = (L/v1) x 60T224.00menit- Waktu tempuh kosong = (L/v2) x 60T319.20menit- Lain-lainT41.00menitTs255.51menit

Bersambung ANALISA HARGA DASAR SATUAN BAHAN

Jenis:M44 - Pasir UrugLokasi:QuarryTujuan:Lokasi Pekerjaan

Lanjutan HARGANo.URAIANKODEKOEF.SATUANSATUAN(Rp.)

Kapasitas Produksi / Jam =V x Fa x 60Q23.79M3 / JamTs2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08Rp259,337.43Rupiah

IV.HARGA SATUAN DASAR BAHANDI LOKASI PEKERJAAN

Harga Satuan Dasar pasir urug =

( RpM44 + Rp1 + Rp2 )M44131,756.73Rupiah

Dibulatkan :M44131,700.00Rupiah

ANALISA HARGA DASAR SATUAN BAHAN

Jenis:M1c- Pasir BetonLokasi:QuarryTujuan:Lokasi Pekerjaan

HARGANo.URAIANKODEKOEF.SATUANSATUAN(Rp.)

I.ASUMSI1Menggunakan alat berat2Kondisi Jalan : baik3Jarak Quarry ke lokasi pekerjaanL16.00Km4Harga satuan pasir urug di QuarryRpM441.00M374,000.005Harga Satuan Dasar ExcavatorRpE101.00Jam338,039.296Harga Satuan Dasar Dump TruckRpE081.00Jam224,919.657Berat isi volume pasir betonBil1.69ton/m3

II.URUTAN KERJA1pasir urug digali dengan Excavator2Excavator sekaligus memuat pasir urughasil galian ke dalam Dump Truck3Dump Truck mengangkut pasir urugke lokasi pekerjaan

III.PERHITUNGAN

EXCAVATOR(E10)Kapasitas BucketV0.50M3Faktor BucketFb0.90-Faktor Efisiensi alatFa0.83-Waktu siklusTs1- Menggali / memuatT10.50menit- Lain-lainT20.50menitTs11.00menitKap. Prod. / jam =V x Fb x Fa x 60Q122.41M3 / JamTs1

Biaya Excavator / M3 = (1 : Q1) x RpE10Rp115,084.31Rupiah

DUMP TRUCK(E08)Kapasitas bakV6.00tonFaktor efisiensi alatFa0.83-Kecepatan rata-rata bermuatanv140.00KM/JamKecepatan rata-rata kosongv250.00KM/JamWaktu siklusTs2 - Muat = (V x 60)/(Q1 x Bil)T19.51menit- Waktu tempuh isi = (L/v1) x 60T124.00menit- Waktu tempuh kosong = (L/v2) x 60T219.20menit- Lain-lainT41.00menitTs253.71menit

Bersambung

ANALISA HARGA DASAR SATUAN BAHAN

Jenis:M1c- Pasir BetonLokasi:QuarryTujuan:Lokasi Pekerjaan

Lanjutan HARGANo.URAIANKODEKOEF.SATUANSATUAN(Rp.)

Kapasitas Produksi / Jam =V x Fa x 60Q23.29M3 / JamTs2 x Bil

Biaya Dump Truck / M3 = (1 : Q2) x RpE08Rp268,320.67Rupiah

IV.HARGA SATUAN DASAR BAHANDI LOKASI PEKERJAAN

Harga Satuan Dasar pasir urug =

( RpM44 + Rp1 + Rp2 )M44157,404.97Rupiah

Dibulatkan :M44157,400.00Rupiah

Medankm 000+000KisaranKm 158+00010,00 kmLokasi Quarry Patumbak- Gravel- Batu Kali- Batu Belah

Tanah Jawa / Pematangsiantarke Tanjung Balaike Rantau PrapatBase CampTanah Timbun = 10.00 kmPasir = 30.00 km

Sp. KawatKm 172+9005,00 kmKisaran - Sp. KawatPETA LOKASI QUARRY7,45 km7,45 km

Agg AITEM PEMBAYARAN: AGREGAT KELAS A (kondisi lepas)JENIS PEKERJAAN: PENGADAAN AGREGAT KELAS ASATUAN PEMBAYARAN: M3 URAIAN ANALISA HARGA SATUANFORMULIR STANDAR UNTUKPEREKAMAN ANALISA MASING-MASING HARGA SATUAN No.U R A I A NKODEKOEFISIENSATUANKETERANGAN

KEGIATAN: PERENCANAAN REHABILITASI PEMELIHARAAN JALAN KABUPATENI.ASUMSINo. PAKET: -1.0Menggunakan alat berat (cara mekanik)NAMA PAKET2.0Lokasi pekerjaan : sepanjang jalanPROP / KAB / KODYA: ACEH BESAR3.0Kondisi existing jalan : sedangITEM PEMBAYARAN NO.: AGREGAT KELAS A (kondisi lepas):4.0Jarak rata-rata Base Camp ke lokasi pekerjaanL34.02KMJENIS PEKERJAAN: PENGADAAN AGREGAT KELAS A:5.0Tebal lapis agregat padatt0.15MSATUAN PEMBAYARAN: M3:6.0Berat isi padat Bip1.81-7.0Jam kerja efektif per-hariTk7.00jam8.0Proporsi Campuran :- Agregat Pecah Mesin 20 - 30 mm20-3028.00% Gradasi harusPERKIRAANHARGAJUMLAH- Agregat Pecah Mesin 5 - 10 & 10 - 20 mm5-10&10-2042.00% memenuhi Spec.NO.KOMPONENSATUANKUANTITASSATUANHARGA- Pasir UrugPU30.00%(Rp.)(Rp.)9.0Berat Isi Agregat (lepas)Bil1.51ton/m310.0Faktor kehilangan- Agregat Pecah Mesin 20 - 30 mmFh11.05- Agregat Pecah Mesin 5 - 10 & 10 - 20 mmFh21.05A.TENAGA- Pasir UrugFh31.051.Pekerja(L01)jam0.06308,000.00503.98II.URUTAN KERJA2.Mandor(L03)jam0.031512,142.86382.481.0Wheel Loader memuat material bahan campuran daristockpile ke alat blending2.0Blending equipment melakukan pencampuran (blending)JUMLAH HARGA TENAGA 886.46Aggregat kasar, aggregat halus dan pasir alam menjadi Aggregat AB.BAHAN

1.Agregat 20-30 M93M30.2940231,714.8168,124.152.Agregat 5-10 & 10-20M92M30.4410231,714.81102,186.233.0Pasir UrugM44M30.3150131,700.0041,485.50

III.PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.BAHANJUMLAH HARGA BAHAN 211,795.88- Agr 20-30= "20-30" x 1 M3 x Fh1M930.2940M3- Agr 5 - 10 & 10 - 20= "5-10 & 10-20" x 1 M3 x Fh2M920.4410M3C.PERALATAN- Pasir Urug= PU x 1 M3 x Fh3M440.3150M31.Wheel Loader(E15)jam0.0315351,594.4111,074.712.Blending Equpment(E52)jam0.048298,071.434,726.33 2.ALAT3.0Alat BantuLs1.00000.000.00 2.a.WHEEL LOADER(E15)Kapasitas bucketV1.50M3(lepas)Faktor bucketFb0.85-kondisi sedangJUMLAH HARGA PERALATAN 15,801.05Faktor Efisiensi alatFa0.83-Waktu Siklus :D.JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )228,483.39- Waktu pemuatan alat blendingT12.00menitjarak 50 meter

Ts12.00menit

Kap. Prod. / jam =V x Fb x Fa x 60Q131.75M3padatTs1Koefisien Alat / M3 = 1 : Q1(E15)0.0315jam

2.b.BLENDING EQIPMENT(E52)KapasitasV25.00M3/jamFaktor effesiensi alatFa0.83

Kap. Prod. / jam =V x FaQ220.75M3

Koefisien Alat / M3 = 1 : Q20.0482jam

3.TENAGAProduksi menentukan : WHEEL LOADERQ131.75M3/JamProduksi Agregat / hari = Tk x Q1Qt222.23M3Kebutuhan tenaga :- PekerjaP2.00orang- MandorM1.00orang

Koefisien tenaga / M3 :- Pekerja= (Tk x P) : Qt(L01)0.0630Jam- Mandor= (Tk x M) : Qt(L03)0.0315Jam

Agg Halus & KasarITEM PEMBAYARAN: AGREGAT KASAR & HALUSJENIS PEKERJAAN: PENGADAAN AGREGAT KASAR & HALUSSATUAN PEMBAYARAN: M3 URAIAN ANALISA HARGA SATUAN

No.U R A I A NKODEKOEFISIENSATUANKETERANGAN

IASUMSIIASUMSI1Bahan dasar (Batu dan Pasir) diterima di lokasi Alat1Bahan dasar (Batu dan Pasir) diterima di lokasi AlatPemecah Batu (di Base Camp)Pemecah Batu (di Base Camp)2Kegiatan dilakukan di dalam lokasi Base Camp2Kegiatan dilakukan di dalam lokasi Base Camp3Hasil produksi Alat Pemecah Batu :- Agregat HalusH35.00%3.00Hasil produksi Alat Pemecah Batu :- Agregat HalusH35%- Agregat KasarK65.00%- Agregat KasarK65%4Berat Isi Bahan :- Batu / GravelD11.20Ton/M3 Berongga4.00Berat Isi Bahan :- Batu / GravelD11.2Ton/M3 Berongga- PasirD21.40Ton/M3 Berongga- PasirD21.4Ton/M3 Berongga- Batu PecahD31.35Ton/M3 Berongga- Batu PecahD31.35Ton/M3 Berongga5Harga Satuan Bahan Dasar :- Batu KaliRp1155,600.00Rp./M35.00Harga Satuan Bahan Dasar :- Batu KaliRp1150000Rp./M3- PasirRp2148,400.00Rp./M3- PasirRp2120000Rp./M36Biaya Operasi Alat :- Pemecah Batu (Stone Crusher)Rp3526,784.38Rp./Jam6.00Biaya Operasi Alat :- Pemecah Batu (Stone Crusher)Rp3414476.810470867Rp./Jam- Wheel LoaderRp4351,594.41Rp./Jam- Wheel LoaderRp4287706.919533434Rp./Jam7Kapasitas Alat :- Pemecah Batu (Stone Crusher)Cp130.00Ton/Jam7.00Kapasitas Alat :- Pemecah Batu (Stone Crusher)Cp130Ton/Jam- Wheel LoaderCp21.50M3 Kap. Bucket- Wheel LoaderCp21.5M3 Kap. Bucket8Faktor Efisiensi Alat :- Pemecah Batu (Stone Crusher)Fa10.70-8.00Faktor Efisiensi Alat :- Pemecah Batu (Stone Crusher)Fa10.7-- Wheel LoaderFa20.83-- Wheel LoaderFa20.83-9Faktor Kehilangan MaterialFh1.10-9.00Faktor Kehilangan MaterialFh1.1-10Agregat Halus masih perlu dicampur dengan pasir10Agregat Halus masih perlu dicampur dengan pasir

IIMETHODE PELAKSANAANIIMETHODE PELAKSANAAN

1Wheel Loader mengangkut batu/gravel dari tumpukan1Wheel Loader mengangkut batu/gravel dari tumpukandan menuangkannya ke Alat Pemecah Batu.dan menuangkannya ke Alat Pemecah Batu.

2Batu/gravel dipecah dengan Alat Pemecah Batu2Batu/gravel dipecah dengan Alat Pemecah Batu(Stone Crusher) sehingga menghasilkan Agregat Batu(Stone Crusher) sehingga menghasilkan Agregat BatuPecah Kasar dan Halus.Pecah Kasar dan Halus.

3Agregat Halus dicampur dengan pasir menggunakan Loader3Agregat Halus dicampur dengan pasir menggunakan Loader

IIIPERHITUNGANIIIPERHITUNGAN

III.1.HARGA SATUAN AGREGAT PRODUKSI ST. CRUSHERIII.1.HARGA SATUAN AGREGAT PRODUKSI ST. CRUSHER

1.a. Kerja Stone Crusher memecah gravel :1.a. Kerja Stone Crusher memecah gravel : - Waktu kerja Stone CrusherTst1.00Jam - Waktu kerja Stone CrusherTst1Jam - Produksi Stone Crusher 1 jam= (Fa1 x Cp1) : D3Qb15.56M3/Jam Batu pecah - Produksi Stone Crusher 1 jam= (Fa1 x Cp1) : D3Qb15.5555555556M3/Jam Batu pecah - Kebutuhan batu/gravel 1 jam= (Fa1 x Cp1) : D1Qg17.50M3/Jam - Kebutuhan batu/gravel 1 jam= (Fa1 x Cp1) : D1Qg17.5M3/Jam

1.b. Kerja Wheel Loader melayani Stone Crusher :1.b. Kerja Wheel Loader melayani Stone Crusher : - Kap. Angkut / rit = (Fa2 x Cp2)Ka1.25M3 - Kap. Angkut / rit = (Fa2 x Cp2)Ka1.245M3 - Waktu Siklus (Muat, Tuang, Tunggu, dll)Ts1.00menit - Waktu Siklus (Muat, Tuang, Tunggu, dll)Ts2menit - Waktu kerja W.Loader memasok gravel - Waktu kerja W.Loader memasok gravel= {(Qg : Ka) x Ts} : 60 menitTw0.23Jam= {(Qg : Ka) x Ts} : 60 menitTw0.46854083Jam

1.c. Biaya Produksi Batu Pecah / M31.c. Biaya Produksi Batu Pecah / M3= {(Tst x Rp3) + (Tw x Rp4)} : QbBp39,159.81Rp./M3= {(Tst x Rp3) + (Tw x Rp4)} : QbBp35310.8088862684Rp./M3

1.d. Harga Satuan Batu Pecah Produksi St.Crusher / M31.d. Harga Satuan Batu Pecah Produksi St.Crusher / M3= {(Qg : Qb) x Fh x Rp1} +