108-12-18 gui for development of remes models remes gui group
TRANSCRIPT
Content
• What’s done so far
• Experiences
• What’s yet to be done
• Future plans and activity plan
• Prototype demonstration
208-12-18
Reaching the target
308-12-18
Pablo Ibanez-Veron
Guido DiodatoVidar Rinne
Bariša Obradović
Josip Maričević
Krešimir Krečak
Anuradha Suryadevara
1
2
3
4
Done so far
• Project prototype– Create a new project tree view– Create a new project design view– Save– Import– Tree view design of submodel– Drag & drop of atomic mode– Connectors between atomic mode– Property modification
408-12-18
Experiences
• Workgroup– Distributed in different locations
• Overcome constraints– Language– Cultural differences
• Spend more time on work coordination– Mails– Skype chat
• Always optimistic to meet milestones• Better understanding and try to make fun of stress
508-12-18
To be done
• Prototype will be incremented with complete– Metamodel
• Composite mode• Other connection types• Some constraints
– Model view like time, functional and resource
• Testing plug-in• Final documentation
608-12-18
Next steps (1)
• Incremental development– Fast prototype– Customer feedback– Feedback analysis– GMF model update– GMF model implementation– New prototype testing
708-12-18
Statistics
• 77 days to develop REMES GUI– 48 days already passed– 28 days to go
• 727 work hours spent– Average of 17.3 hours a week per person