108-12-18 gui for development of remes models remes gui group

10
1 08-12-18 GUI for development of REMES models REMES GUI group

Upload: christina-paul

Post on 14-Dec-2015

227 views

Category:

Documents


4 download

TRANSCRIPT

108-12-18

GUI for development of REMES models

REMES GUI group

Content

• What’s done so far

• Experiences

• What’s yet to be done

• Future plans and activity plan

• Prototype demonstration

208-12-18

Reaching the target

308-12-18

Pablo Ibanez-Veron

Guido DiodatoVidar Rinne

Bariša Obradović

Josip Maričević

Krešimir Krečak

Anuradha Suryadevara

1

2

3

4

Done so far

• Project prototype– Create a new project tree view– Create a new project design view– Save– Import– Tree view design of submodel– Drag & drop of atomic mode– Connectors between atomic mode– Property modification

408-12-18

Experiences

• Workgroup– Distributed in different locations

• Overcome constraints– Language– Cultural differences

• Spend more time on work coordination– Mails– Skype chat

• Always optimistic to meet milestones• Better understanding and try to make fun of stress

508-12-18

To be done

• Prototype will be incremented with complete– Metamodel

• Composite mode• Other connection types• Some constraints

– Model view like time, functional and resource

• Testing plug-in• Final documentation

608-12-18

Next steps (1)

• Incremental development– Fast prototype– Customer feedback– Feedback analysis– GMF model update– GMF model implementation– New prototype testing

708-12-18

Statistics

• 77 days to develop REMES GUI– 48 days already passed– 28 days to go

• 727 work hours spent– Average of 17.3 hours a week per person

808-12-18

Current project status

• Where we were supposed to be right now

• Where we actually are