102c. 5) field testing of hybrid ultra … › ongoing_files › oct2018 › 05_huc.pdf10 102c. 5)...

4
10 102C. 5) FIELD TESTING OF HYBRID ULTRA CAPACITORS (HUC) POWERED SOLAR LIGHTING KITS AND SOLAR STREET LIGHTS FOR GRID DEPRIVED RURAL AREAS, LIGHTING IN VARYING CLIMATIC ZONES OF INDIA Principal Investigator : Executive Secretary, KSCST Co-Principal Investigator : Mr. S N Jayaram, Project Engineer, KSCST Budget : Total Budget Rs.76.44 Lakhs DST, GoI Rs.37.74 Lakhs, Industry Rs.25.50 Lakhs KSCST Rs.13.20 Lakhs Introduction: The Department of Science and Technology, Government of India has sanctioned the project titled “Field testing of Hybrid Ultra Capacitor (HUC) Powered Solar PV Lighting Kits and Street Lights for Grid Deprived Rural area for Lighting in Varying Climatic Zones of India” to KSCST, vide sanction oorder No. DST/SSTP/Karnataka/484(G), dated 18.05.2017 for field testing the performance of the HUC Technology. This project is jointly funded by Department of Science and Technology, Government of India, KSCST and the Industrial Partner M/s MESHA Energy Solutions Private Limited Bengaluru. KSCST is procuring 960 units of 5 W capacity and 40 units of 10W capacity lighting kits from MESHA Energy Solutions and installing these lighting kits eight states for field testing the performance of the HUC technology in varying climatic zones. Progress during March 2018 – July 2018 As on August 2018, KSCST has installed total of 620 HUC lighting kits in the following Six States. SL No STATE NO OF HUC LIGHTING KITS SL No STATE NO OF HUC LIGHTING KITS 1 Karnataka 230 4 Odissa 90 2 Assam 80 5 Himachal Pradesh 75 3 Nagaland 70 6 Arunachal Pradesh 75 Arunachal Pradesh – Boha and Kalatang villages in west Kameng district Assam – Amerigog village, Tepesia post, Kamrup district Guwahati – S&T Council office, Regional Science Center Nagaland – Dimapur and Myanmar Himachal Pradesh – Mandi, Kullu, and Chamba districts Odissa – Kolhi village in Denkanal district

Upload: others

Post on 24-Jun-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 102C. 5) FIELD TESTING OF HYBRID ULTRA … › ongoing_files › Oct2018 › 05_HUC.pdf10 102C. 5) FIELD TESTING OF HYBRID ULTRA CAPACITORS (HUC) POWERED SOLAR LIGHTING KITS AND SOLAR

10

102C. 5) FIELD TESTING OF HYBRID ULTRA CAPACITORS

(HUC) POWERED SOLAR LIGHTING KITS AND

SOLAR STREET LIGHTS FOR GRID DEPRIVED

RURAL AREAS, LIGHTING IN VARYING CLIMATIC

ZONES OF INDIA

Principal Investigator : Executive Secretary, KSCST

Co-Principal Investigator : Mr. S N Jayaram,

Project Engineer, KSCST

Budget : Total Budget Rs.76.44 Lakhs

DST, GoI Rs.37.74 Lakhs,

Industry Rs.25.50 Lakhs

KSCST Rs.13.20 Lakhs

Introduction:

The Department of Science and Technology, Government of India has sanctioned

the project titled “Field testing of Hybrid Ultra Capacitor (HUC) Powered Solar

PV Lighting Kits and Street Lights for Grid Deprived Rural area for Lighting in

Varying Climatic Zones of India” to KSCST, vide sanction oorder No.

DST/SSTP/Karnataka/484(G), dated 18.05.2017 for field testing the performance

of the HUC Technology. This project is jointly funded by Department of Science

and Technology, Government of India, KSCST and the Industrial Partner M/s

MESHA Energy Solutions Private Limited Bengaluru.

KSCST is procuring 960 units of 5 W capacity and 40 units of 10W capacity

lighting kits from MESHA Energy Solutions and installing these lighting kits

eight states for field testing the performance of the HUC technology in varying

climatic zones.

Progress during March 2018 – July 2018

As on August 2018, KSCST has installed total of 620 HUC lighting kits in the

following Six States.

SL

No STATE

NO OF HUC

LIGHTING

KITS

SL No STATE

NO OF HUC

LIGHTING

KITS

1 Karnataka 230 4 Odissa 90

2 Assam 80 5 Himachal

Pradesh 75

3 Nagaland 70 6 Arunachal

Pradesh 75

Arunachal Pradesh – Boha and Kalatang villages in west Kameng district

Assam – Amerigog village, Tepesia post, Kamrup district

Guwahati – S&T Council office, Regional Science Center

Nagaland – Dimapur and Myanmar

Himachal Pradesh – Mandi, Kullu, and Chamba districts

Odissa – Kolhi village in Denkanal district

Page 2: 102C. 5) FIELD TESTING OF HYBRID ULTRA … › ongoing_files › Oct2018 › 05_HUC.pdf10 102C. 5) FIELD TESTING OF HYBRID ULTRA CAPACITORS (HUC) POWERED SOLAR LIGHTING KITS AND SOLAR

KSCST and M/s. Mesha Energy Solutions Pvt Ltd jointly trained the caretakers

of HUC lighting for day tday operations and maintenance of lightening kits.

Nagaland State

Odissa State

Page 3: 102C. 5) FIELD TESTING OF HYBRID ULTRA … › ongoing_files › Oct2018 › 05_HUC.pdf10 102C. 5) FIELD TESTING OF HYBRID ULTRA CAPACITORS (HUC) POWERED SOLAR LIGHTING KITS AND SOLAR

12

Himachal Pradesh

Page 4: 102C. 5) FIELD TESTING OF HYBRID ULTRA … › ongoing_files › Oct2018 › 05_HUC.pdf10 102C. 5) FIELD TESTING OF HYBRID ULTRA CAPACITORS (HUC) POWERED SOLAR LIGHTING KITS AND SOLAR

Arunachal Pradesh