Page 1: 1029 MP PH II Risk Assessment ERP - Template Xlsx

1 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page1of271

Attachments Y/N

H&S Site Survey Report Yes

Lifting Plan na EHS Manager:Hot Work Permit No

Site Emergency Response Plan Yes Supervisor:

Date of implementation: __24 ___/____02___/__2016_

RISK ASSESSMENTRISK ASSESSMENT Site ID - 1029 MP (GF) Site ID - 1029 MP (GF)

Page 2: 1029 MP PH II Risk Assessment ERP - Template Xlsx

2 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page2of271

I herby confirm that I have read the below requirements and risk assessment and shall strictly follow and implement, and in case of conflicts or doubts I shall consult with company H&S Manager to use the dynamic risk assessment, and I am fully responsible for my own safety and the safety of all the crew working on my site. and I confirm that all H&S documents shall be on site whenever any work is carried out.

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

General Notes

Page 3: 1029 MP PH II Risk Assessment ERP - Template Xlsx

3 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page3of271

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

Page 4: 1029 MP PH II Risk Assessment ERP - Template Xlsx

4 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page4of271

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

Site Photos

Risk Assessment

Page 5: 1029 MP PH II Risk Assessment ERP - Template Xlsx

5 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page5of271

Risk Assessment

Page 6: 1029 MP PH II Risk Assessment ERP - Template Xlsx

6 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page6of271

TASK HAZARD RISK

Page 7: 1029 MP PH II Risk Assessment ERP - Template Xlsx

7 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page7of271

TASK HAZARD RISK

Transportation Driving/Traffic Hazards

fatality,Injury, Property Damage

Page 8: 1029 MP PH II Risk Assessment ERP - Template Xlsx

8 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page8of271

TASK HAZARD RISK

Shifting of material from vehicle to site workplace (Manual Handling)

Weight or/and Dimensions of the material

back injury, foot injury

Page 9: 1029 MP PH II Risk Assessment ERP - Template Xlsx

9 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page9of271

TASK HAZARD RISK

Working at heightHeight, Falling Objects

Fatality,Injury, Property Damage

Page 10: 1029 MP PH II Risk Assessment ERP - Template Xlsx

10 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page10of271

TASK HAZARD RISK

RIGGING (Pulling material from Ground to Tower height)

Falling of object/Strong wind

Material damage/Injury

Page 11: 1029 MP PH II Risk Assessment ERP - Template Xlsx

11 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page11of271

TASK HAZARD RISK

Installation of RRUs and Anntennas

falling objects, dropping objects

fatality, injury, property damage

Page 12: 1029 MP PH II Risk Assessment ERP - Template Xlsx

12 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page12of271

TASK HAZARD RISK

Installation of RRUs and Anntennas

falling objects, dropping objects

fatality, injury, property damage

Page 13: 1029 MP PH II Risk Assessment ERP - Template Xlsx

13 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page13of271

TASK HAZARD RISK

FallingFixing cables from anntenas to the cabinet

Injury, Fatalty, Property Damage

Page 14: 1029 MP PH II Risk Assessment ERP - Template Xlsx

14 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page14of271

TASK HAZARD RISK

sharp cable, wrong coConnect BTS power cable to Rectifier

Injury, Property Damage

Page 15: 1029 MP PH II Risk Assessment ERP - Template Xlsx

15 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page15of271

TASK HAZARD RISK

Using Of Hantools.Cut, Puncture, Abbravassion

injury, property damage

Page 16: 1029 MP PH II Risk Assessment ERP - Template Xlsx

16 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page16of271

TASK HAZARD RISK

RF Exposure RadiationsBad health effects, cancer

Page 17: 1029 MP PH II Risk Assessment ERP - Template Xlsx

17 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page17of271

TASK HAZARD RISK

Working on cable trays trip/fall injury

Page 18: 1029 MP PH II Risk Assessment ERP - Template Xlsx

18 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page18of271

TASK HAZARD RISK

injury/infectionWaste Collecting/site Cleaning and transfer to waste disposal area

House keeping/sharp edges/tripping hazard/dust

Page 19: 1029 MP PH II Risk Assessment ERP - Template Xlsx

19 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page19of271

TASK HAZARD RISK

Page 20: 1029 MP PH II Risk Assessment ERP - Template Xlsx

20 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page20of271

TASK HAZARD RISK

Page 21: 1029 MP PH II Risk Assessment ERP - Template Xlsx

21 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page21of271

TASK HAZARD RISK

Page 22: 1029 MP PH II Risk Assessment ERP - Template Xlsx

22 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page22of271

TASK HAZARD RISK

Page 23: 1029 MP PH II Risk Assessment ERP - Template Xlsx

23 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page23of271

TASK HAZARD RISK

Page 24: 1029 MP PH II Risk Assessment ERP - Template Xlsx

24 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page24of271

TASK HAZARD RISK

Page 25: 1029 MP PH II Risk Assessment ERP - Template Xlsx

25 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page25of271

TASK HAZARD RISK

Page 26: 1029 MP PH II Risk Assessment ERP - Template Xlsx

26 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page26of271

TASK HAZARD RISK

Page 27: 1029 MP PH II Risk Assessment ERP - Template Xlsx

27 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page27of271

TASK HAZARD RISK

Page 28: 1029 MP PH II Risk Assessment ERP - Template Xlsx

28 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page28of271

TASK HAZARD RISK

Page 29: 1029 MP PH II Risk Assessment ERP - Template Xlsx

29 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page29of271

TASK HAZARD RISK

Page 30: 1029 MP PH II Risk Assessment ERP - Template Xlsx

30 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page30of271

TASK HAZARD RISK

Page 31: 1029 MP PH II Risk Assessment ERP - Template Xlsx

31 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page31of271

TASK HAZARD RISK

Page 32: 1029 MP PH II Risk Assessment ERP - Template Xlsx

32 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page32of271

TASK HAZARD RISK

Page 33: 1029 MP PH II Risk Assessment ERP - Template Xlsx

33 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page33of271

TASK HAZARD RISK

Page 34: 1029 MP PH II Risk Assessment ERP - Template Xlsx

34 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page34of271

TASK HAZARD RISK

Page 35: 1029 MP PH II Risk Assessment ERP - Template Xlsx

35 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page35of271

TASK HAZARD RISK

Page 36: 1029 MP PH II Risk Assessment ERP - Template Xlsx

36 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page36of271

TASK HAZARD RISK

Page 37: 1029 MP PH II Risk Assessment ERP - Template Xlsx

37 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page37of271

TASK HAZARD RISK

Page 38: 1029 MP PH II Risk Assessment ERP - Template Xlsx

38 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page38of271

TASK HAZARD RISK

Page 39: 1029 MP PH II Risk Assessment ERP - Template Xlsx

39 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page39of271

TASK HAZARD RISK

Page 40: 1029 MP PH II Risk Assessment ERP - Template Xlsx

40 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page40of271

TASK HAZARD RISK

Page 41: 1029 MP PH II Risk Assessment ERP - Template Xlsx

41 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page41of271

TASK HAZARD RISK

Page 42: 1029 MP PH II Risk Assessment ERP - Template Xlsx

42 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page42of271

TASK HAZARD RISK

Page 43: 1029 MP PH II Risk Assessment ERP - Template Xlsx

43 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page43of271

TASK HAZARD RISK

Page 44: 1029 MP PH II Risk Assessment ERP - Template Xlsx

44 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page44of271

TASK HAZARD RISK

Page 45: 1029 MP PH II Risk Assessment ERP - Template Xlsx

45 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page45of271

TASK HAZARD RISK

Page 46: 1029 MP PH II Risk Assessment ERP - Template Xlsx

46 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page46of271

Dennis

Ayub

Date of implementation: __24 ___/____02___/__2016_

Site ID - 1029 MP (GF) Site ID - 1029 MP (GF)

Page 47: 1029 MP PH II Risk Assessment ERP - Template Xlsx

47 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page47of271

I herby confirm that I have read the below requirements and risk assessment and shall strictly follow and implement, and in case of conflicts or doubts I shall consult with company H&S Manager to use the dynamic risk assessment, and I am fully responsible for my own safety and the safety of all the crew working on my site. and I confirm that all H&S documents shall be on site whenever any work is carried out.

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

General Notes

Page 48: 1029 MP PH II Risk Assessment ERP - Template Xlsx

48 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page48of271

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

Page 49: 1029 MP PH II Risk Assessment ERP - Template Xlsx

49 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page49of271

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

Site Photos

Risk Assessment

Page 50: 1029 MP PH II Risk Assessment ERP - Template Xlsx

50 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page50of271

Risk Assessment

Page 51: 1029 MP PH II Risk Assessment ERP - Template Xlsx

51 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page51of271

WHO IS EXPOSED?

Page 52: 1029 MP PH II Risk Assessment ERP - Template Xlsx

52 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page52of271

WHO IS EXPOSED?

Passengers /General Public

Page 53: 1029 MP PH II Risk Assessment ERP - Template Xlsx

53 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page53of271

WHO IS EXPOSED?

Technician & Rigger

Page 54: 1029 MP PH II Risk Assessment ERP - Template Xlsx

54 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page54of271

WHO IS EXPOSED?

Employees

Page 55: 1029 MP PH II Risk Assessment ERP - Template Xlsx

55 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page55of271

WHO IS EXPOSED?

workers on site

Page 56: 1029 MP PH II Risk Assessment ERP - Template Xlsx

56 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page56of271

WHO IS EXPOSED?

Riggers and operatives

Page 57: 1029 MP PH II Risk Assessment ERP - Template Xlsx

57 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page57of271

WHO IS EXPOSED?Riggers and operatives

Page 58: 1029 MP PH II Risk Assessment ERP - Template Xlsx

58 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page58of271

WHO IS EXPOSED?

Riggers

Page 59: 1029 MP PH II Risk Assessment ERP - Template Xlsx

59 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page59of271

WHO IS EXPOSED?

Site Engineer & Technicians.

Page 60: 1029 MP PH II Risk Assessment ERP - Template Xlsx

60 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page60of271

WHO IS EXPOSED?

employees

Page 61: 1029 MP PH II Risk Assessment ERP - Template Xlsx

61 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page61of271

WHO IS EXPOSED?

employees

Page 62: 1029 MP PH II Risk Assessment ERP - Template Xlsx

62 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page62of271

WHO IS EXPOSED?

workers on site

Page 63: 1029 MP PH II Risk Assessment ERP - Template Xlsx

63 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page63of271

WHO IS EXPOSED?

site Workers

Page 64: 1029 MP PH II Risk Assessment ERP - Template Xlsx

64 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page64of271

WHO IS EXPOSED?

Page 65: 1029 MP PH II Risk Assessment ERP - Template Xlsx

65 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page65of271

WHO IS EXPOSED?

Page 66: 1029 MP PH II Risk Assessment ERP - Template Xlsx

66 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page66of271

WHO IS EXPOSED?

Page 67: 1029 MP PH II Risk Assessment ERP - Template Xlsx

67 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page67of271

WHO IS EXPOSED?

Page 68: 1029 MP PH II Risk Assessment ERP - Template Xlsx

68 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page68of271

WHO IS EXPOSED?

Page 69: 1029 MP PH II Risk Assessment ERP - Template Xlsx

69 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page69of271

WHO IS EXPOSED?

Page 70: 1029 MP PH II Risk Assessment ERP - Template Xlsx

70 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page70of271

WHO IS EXPOSED?

Page 71: 1029 MP PH II Risk Assessment ERP - Template Xlsx

71 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page71of271

WHO IS EXPOSED?

Page 72: 1029 MP PH II Risk Assessment ERP - Template Xlsx

72 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page72of271

WHO IS EXPOSED?

Page 73: 1029 MP PH II Risk Assessment ERP - Template Xlsx

73 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page73of271

WHO IS EXPOSED?

Page 74: 1029 MP PH II Risk Assessment ERP - Template Xlsx

74 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page74of271

WHO IS EXPOSED?

Page 75: 1029 MP PH II Risk Assessment ERP - Template Xlsx

75 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page75of271

WHO IS EXPOSED?

Page 76: 1029 MP PH II Risk Assessment ERP - Template Xlsx

76 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page76of271

WHO IS EXPOSED?

Page 77: 1029 MP PH II Risk Assessment ERP - Template Xlsx

77 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page77of271

WHO IS EXPOSED?

Page 78: 1029 MP PH II Risk Assessment ERP - Template Xlsx

78 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page78of271

WHO IS EXPOSED?

Page 79: 1029 MP PH II Risk Assessment ERP - Template Xlsx

79 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page79of271

WHO IS EXPOSED?

Page 80: 1029 MP PH II Risk Assessment ERP - Template Xlsx

80 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page80of271

WHO IS EXPOSED?

Page 81: 1029 MP PH II Risk Assessment ERP - Template Xlsx

81 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page81of271

WHO IS EXPOSED?

Page 82: 1029 MP PH II Risk Assessment ERP - Template Xlsx

82 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page82of271

WHO IS EXPOSED?

Page 83: 1029 MP PH II Risk Assessment ERP - Template Xlsx

83 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page83of271

WHO IS EXPOSED?

Page 84: 1029 MP PH II Risk Assessment ERP - Template Xlsx

84 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page84of271

WHO IS EXPOSED?

Page 85: 1029 MP PH II Risk Assessment ERP - Template Xlsx

85 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page85of271

WHO IS EXPOSED?

Page 86: 1029 MP PH II Risk Assessment ERP - Template Xlsx

86 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page86of271

WHO IS EXPOSED?

Page 87: 1029 MP PH II Risk Assessment ERP - Template Xlsx

87 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page87of271

WHO IS EXPOSED?

Page 88: 1029 MP PH II Risk Assessment ERP - Template Xlsx

88 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page88of271

WHO IS EXPOSED?

Page 89: 1029 MP PH II Risk Assessment ERP - Template Xlsx

89 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page89of271

WHO IS EXPOSED?

Page 90: 1029 MP PH II Risk Assessment ERP - Template Xlsx

90 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page90of271

WHO IS EXPOSED?

Page 91: 1029 MP PH II Risk Assessment ERP - Template Xlsx

91 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page91of271

Contractor: JAIDAH

Sign: _________________

Sign: _________________

__24 ___/____02___/__2016_

Site ID - 1029 MP (GF) Site ID - 1029 MP (GF)

Scope of work - MW Installation Date - 24 - 02- 2016 Date - 24 - 02- 2016

Page 92: 1029 MP PH II Risk Assessment ERP - Template Xlsx

92 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page92of271

I herby confirm that I have read the below requirements and risk assessment and shall strictly follow and implement, and in case of conflicts or doubts I shall consult with company H&S Manager to use the dynamic risk assessment, and I am fully responsible for my own safety and the safety of all the crew working on my site. and I confirm that all H&S documents shall be on site whenever any work is carried out.

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

General Notes

Page 93: 1029 MP PH II Risk Assessment ERP - Template Xlsx

93 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page93of271

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

Page 94: 1029 MP PH II Risk Assessment ERP - Template Xlsx

94 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page94of271

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

Site Photos

Risk Assessment

Page 95: 1029 MP PH II Risk Assessment ERP - Template Xlsx

95 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page95of271

Risk Assessment

Page 96: 1029 MP PH II Risk Assessment ERP - Template Xlsx

96 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page96of271

EXISTING CONTROLS

RISK ASSESS

L

Page 97: 1029 MP PH II Risk Assessment ERP - Template Xlsx

97 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page97of271

EXISTING CONTROLS

RISK ASSESS

L

2

• Driver must have valid driving license• Vehicle must be fit for the job• Vehicle must be in good working conditions• Inspect the vehicle using roadworthy inspection checklist• Fix the identified problems before moving to site• All passengers must fasten the seat belts (front and rear)• Any load in the vehicle should be properly secured and distributed• No material in the front or rear seats of the vehicle• Do not use mobile phone while driving• Never over speed • Never drive under the influence of the drugs• Must follow VF 07 absolute safety rules• Drivers must be very watchfull of other road users during driving for any unexpected situation • Drivers must always keep the volume of the car tape as low as possible if at all to be on. • Drivers must always avoid any deep discussion with passengers to avoid lost of concentration.All drivers must have Defensive Driving Training

Page 98: 1029 MP PH II Risk Assessment ERP - Template Xlsx

98 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page98of271

EXISTING CONTROLS

RISK ASSESS

L

2

- Conduct Tool box talk before start of work'- Employees should be trained about manual handling, and safety lifting techniques- Appropriate PPE must be use such as safety boots and hard hats and gloves.- Avoid awkward postures- Ensure good house keeping at site

Page 99: 1029 MP PH II Risk Assessment ERP - Template Xlsx

99 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page99of271

EXISTING CONTROLS

RISK ASSESS

L

2

o Full body harness, Double Lanyard, Positioning Lanyard, Safety shoes, Tower Climbing Helmets, Tower Climbing gloves, safety goggles• Only trained and certified tower climbing & rescue workers will work on tower • Work on hold in case of strong wind (24kT) or adverse weather (call the safety inspector for review) • Accessories must be kept in protected bags in order not to fall on the ground• Inspect PPE, Rescue Equipment Inspection prior use• Proper PPE to be used:• Tower climbers must inspect the tower before climbing, In case of finding any abnormality do not climb and report to safety department- Always use connectors/carabiners/hooks in verticale position - Never put double lanyard hooks on the same anchor point - All damaged PPEs must be marked as damaged and removed from site immediately - Never work after sunset or before sunrise- There must be a regular visual or audio contact between Rescuer and Tower Climber- Supervisor must ensure that tower climber and rescuer are physicall and mentally fit on the day> Riggers (tower climber) must use double lanyard to connect themselves with the tower all the time> Ringgers should never remove both hooks of the double lananyard from tower at the same time

Page 100: 1029 MP PH II Risk Assessment ERP - Template Xlsx

100 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page100of271

EXISTING CONTROLS

RISK ASSESS

L

2

• Must ensure that o Certified rigger (having rigging & slinging training) available at siteo All ropes and pulleys have EN & CE markingo Material Fall Arrest System is properly installedo Drop zone is identifiedo Certificates Rigger , Tower Climbers and First Aider are available at siteo Tag lines are used• Ensure the pulley is in good condition• Ensure the pulley is properly attached with the tower• Recheck the condition of the pulley attachment in intervals during the work• No one should be standing under the tower when material is being pulled up• There should be enough no. of workers to handle the rope with the material• Hold the work in case of adverse weather

Page 101: 1029 MP PH II Risk Assessment ERP - Template Xlsx

101 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page101of271

EXISTING CONTROLS

RISK ASSESS

L

2

~ Make sure the area is barricaded and nobody is working beneath-Appropriate PPE must be warn such as hard hat, gloves, safety boots and safety harness. ~ No alone working.~ No night time working.- Follow the lifting procedure- Use pulley and rope having EN standard- Use material fall arrestor to save material from falling- Must inspect ropes, pulley, slings, material fall arretor and ensure that it is fit for use- check the weight before lifting that it is suitable- ensure that weight is securely attached with the rope and material fall arrestor- No work at site when material is detatched from structure and comming down- no work during high wind speed, rain or adverse weather- Follow the above working at height risk assessment- ensure that weight is securely attached with the rope and material fall arrestor- No work at site untill lifted equipment is fixed with the tower- use taglines to control movement of the equipment- • careful while working on sharp edges like on cable trays, and must use gloves• Accessories must be placed in a protective bag in order not to be scattered - Only trained workers should participate in the delivery, movement and positioning of all the equipments.No Horseplay during work.

Page 102: 1029 MP PH II Risk Assessment ERP - Template Xlsx

102 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page102of271

EXISTING CONTROLS

RISK ASSESS

L

2

~ Make sure the area is barricaded and nobody is working beneath-Appropriate PPE must be warn such as hard hat, gloves, safety boots and safety harness. ~ No alone working.~ No night time working.- Follow the lifting procedure- Use pulley and rope having EN standard- Use material fall arrestor to save material from falling- Must inspect ropes, pulley, slings, material fall arretor and ensure that it is fit for use- check the weight before lifting that it is suitable- ensure that weight is securely attached with the rope and material fall arrestor- No work at site when material is detatched from structure and comming down- no work during high wind speed, rain or adverse weather- Follow the above working at height risk assessment- ensure that weight is securely attached with the rope and material fall arrestor- No work at site untill lifted equipment is fixed with the tower- use taglines to control movement of the equipment- • careful while working on sharp edges like on cable trays, and must use gloves• Accessories must be placed in a protective bag in order not to be scattered - Only trained workers should participate in the delivery, movement and positioning of all the equipments.No Horseplay during work.

Page 103: 1029 MP PH II Risk Assessment ERP - Template Xlsx

103 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page103of271

EXISTING CONTROLS

RISK ASSESS

L

2

Ensure all riggers are worn appropriate PPE.Ensure Ringing and slinging rope shall be used to pull the cables.Ensure area is barricaded.Ensure cable pulling route is identified and understood by riggers.Ensure double lanyard is connected to proper stable anchor point all the time during task.

Page 104: 1029 MP PH II Risk Assessment ERP - Template Xlsx

104 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page104of271

EXISTING CONTROLS

RISK ASSESS

L

1

Ensure right person for the task is assigned by site engineer.Ensure hand gloves are worn all the time during work.Ensure site engineer is present all the time.Ensure all cables are connected as per SDD.

Page 105: 1029 MP PH II Risk Assessment ERP - Template Xlsx

105 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page105of271

EXISTING CONTROLS

RISK ASSESS

L

2

Ensure All workers are trained and competent to use of hand tools and power tools.Ensure Right tools for the right task rule is in place.Ensure All power tools must be inspected visually before use by competent person.e.g power cable, cabinet, etc.Ensure no passing of tools by throwing.Ensure no homemade tools are used at site.Ensure No Horsplay.

Page 106: 1029 MP PH II Risk Assessment ERP - Template Xlsx

106 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page106of271

EXISTING CONTROLS

RISK ASSESS

L

1

Exclusion zone to be followedAll riggers should be trained about RF hazards and use of RF monitorUse RF Monitors Supervisor is required to set the value of RF monitor to 39 V/m before each useRF signage should be in place, In case of find beep from the RF monitor, the rigger is required to change his location to go out of the high radiation zone. If it is requried to work within high radiation area then rigger is required to come out of the high radiation zone, inform the site supervisor about the situation. The site supervisor shall arrange to shut dowing the site or sector with coordination of company Project Control and the Client.

Page 107: 1029 MP PH II Risk Assessment ERP - Template Xlsx

107 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page107of271

EXISTING CONTROLS

RISK ASSESS

L

2

PPE Inspection prior use.Proper PPE to be used:Gloves, safety shoes, Helmetscareful while working on sharp edges, and must use gloves.the right equipment should be use with the appropriate running of the cables•

Page 108: 1029 MP PH II Risk Assessment ERP - Template Xlsx

108 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page108of271

EXISTING CONTROLS

RISK ASSESS

L

2

• Participants instructed to cover any cuts, however minor, with surgical tape or waterproof plasters.• Waste must be stored at designated area, . • appropriate and minimum PPE should be used by participants: Safety boot, appropriate hand gloves, helmet. and dust masksWorkers participating in the waste collecting should be cautious for:o Sharp objects (glass, nails, metal pieces, etc.)o obstacles to avoid tripping hazard.

Page 109: 1029 MP PH II Risk Assessment ERP - Template Xlsx

109 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page109of271

EXISTING CONTROLS

RISK ASSESS

L

Page 110: 1029 MP PH II Risk Assessment ERP - Template Xlsx

110 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page110of271

EXISTING CONTROLS

RISK ASSESS

L

Page 111: 1029 MP PH II Risk Assessment ERP - Template Xlsx

111 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page111of271

EXISTING CONTROLS

RISK ASSESS

L

Page 112: 1029 MP PH II Risk Assessment ERP - Template Xlsx

112 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page112of271

EXISTING CONTROLS

RISK ASSESS

L

Page 113: 1029 MP PH II Risk Assessment ERP - Template Xlsx

113 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page113of271

EXISTING CONTROLS

RISK ASSESS

L

Page 114: 1029 MP PH II Risk Assessment ERP - Template Xlsx

114 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page114of271

EXISTING CONTROLS

RISK ASSESS

L

Page 115: 1029 MP PH II Risk Assessment ERP - Template Xlsx

115 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page115of271

EXISTING CONTROLS

RISK ASSESS

L

Page 116: 1029 MP PH II Risk Assessment ERP - Template Xlsx

116 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page116of271

EXISTING CONTROLS

RISK ASSESS

L

Page 117: 1029 MP PH II Risk Assessment ERP - Template Xlsx

117 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page117of271

EXISTING CONTROLS

RISK ASSESS

L

Page 118: 1029 MP PH II Risk Assessment ERP - Template Xlsx

118 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page118of271

EXISTING CONTROLS

RISK ASSESS

L

Page 119: 1029 MP PH II Risk Assessment ERP - Template Xlsx

119 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page119of271

EXISTING CONTROLS

RISK ASSESS

L

Page 120: 1029 MP PH II Risk Assessment ERP - Template Xlsx

120 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page120of271

EXISTING CONTROLS

RISK ASSESS

L

Page 121: 1029 MP PH II Risk Assessment ERP - Template Xlsx

121 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page121of271

EXISTING CONTROLS

RISK ASSESS

L

Page 122: 1029 MP PH II Risk Assessment ERP - Template Xlsx

122 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page122of271

EXISTING CONTROLS

RISK ASSESS

L

Page 123: 1029 MP PH II Risk Assessment ERP - Template Xlsx

123 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page123of271

EXISTING CONTROLS

RISK ASSESS

L

Page 124: 1029 MP PH II Risk Assessment ERP - Template Xlsx

124 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page124of271

EXISTING CONTROLS

RISK ASSESS

L

Page 125: 1029 MP PH II Risk Assessment ERP - Template Xlsx

125 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page125of271

EXISTING CONTROLS

RISK ASSESS

L

Page 126: 1029 MP PH II Risk Assessment ERP - Template Xlsx

126 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page126of271

EXISTING CONTROLS

RISK ASSESS

L

Page 127: 1029 MP PH II Risk Assessment ERP - Template Xlsx

127 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page127of271

EXISTING CONTROLS

RISK ASSESS

L

Page 128: 1029 MP PH II Risk Assessment ERP - Template Xlsx

128 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page128of271

EXISTING CONTROLS

RISK ASSESS

L

Page 129: 1029 MP PH II Risk Assessment ERP - Template Xlsx

129 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page129of271

EXISTING CONTROLS

RISK ASSESS

L

Page 130: 1029 MP PH II Risk Assessment ERP - Template Xlsx

130 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page130of271

EXISTING CONTROLS

RISK ASSESS

L

Page 131: 1029 MP PH II Risk Assessment ERP - Template Xlsx

131 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page131of271

EXISTING CONTROLS

RISK ASSESS

L

Page 132: 1029 MP PH II Risk Assessment ERP - Template Xlsx

132 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page132of271

EXISTING CONTROLS

RISK ASSESS

L

Page 133: 1029 MP PH II Risk Assessment ERP - Template Xlsx

133 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page133of271

EXISTING CONTROLS

RISK ASSESS

L

Page 134: 1029 MP PH II Risk Assessment ERP - Template Xlsx

134 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page134of271

EXISTING CONTROLS

RISK ASSESS

L

Page 135: 1029 MP PH II Risk Assessment ERP - Template Xlsx

135 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page135of271

EXISTING CONTROLS

RISK ASSESS

L

Page 136: 1029 MP PH II Risk Assessment ERP - Template Xlsx

136 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page136of271

Contractor: JAIDAH

Sign: _________________

Sign: _________________

Scope of work - MW Installation

Page 137: 1029 MP PH II Risk Assessment ERP - Template Xlsx

137 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page137of271

I herby confirm that I have read the below requirements and risk assessment and shall strictly follow and implement, and in case of conflicts or doubts I shall consult with company H&S Manager to use the dynamic risk assessment, and I am fully responsible for my own safety and the safety of all the crew working on my site. and I confirm that all H&S documents shall be on site whenever any work is carried out.

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

Page 138: 1029 MP PH II Risk Assessment ERP - Template Xlsx

138 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page138of271

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

Page 139: 1029 MP PH II Risk Assessment ERP - Template Xlsx

139 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page139of271

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

Page 140: 1029 MP PH II Risk Assessment ERP - Template Xlsx

140 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page140of271

Page 141: 1029 MP PH II Risk Assessment ERP - Template Xlsx

141 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page141of271

RISK ASSESS

S RV Risk Level Action required

Page 142: 1029 MP PH II Risk Assessment ERP - Template Xlsx

142 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page142of271

RISK ASSESS

S RV Risk Level Action required

4

8 Medium

Additional control measures required

Page 143: 1029 MP PH II Risk Assessment ERP - Template Xlsx

143 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page143of271

RISK ASSESS

S RV Risk Level Action required

3

6 Medium

Additional control measures required

Page 144: 1029 MP PH II Risk Assessment ERP - Template Xlsx

144 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page144of271

RISK ASSESS

S RV Risk Level Action required

4

8 Medium

Addition control measures to be taken.

Page 145: 1029 MP PH II Risk Assessment ERP - Template Xlsx

145 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page145of271

RISK ASSESS

S RV Risk Level Action required

4

8 Medium

Addition control measures to be taken.

Page 146: 1029 MP PH II Risk Assessment ERP - Template Xlsx

146 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page146of271

RISK ASSESS

S RV Risk Level Action required

4

8

MediumAddition control measures to

be taken.

Page 147: 1029 MP PH II Risk Assessment ERP - Template Xlsx

147 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page147of271

RISK ASSESS

S RV Risk Level Action required

4

8

MediumAddition control measures to

be taken.

Page 148: 1029 MP PH II Risk Assessment ERP - Template Xlsx

148 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page148of271

RISK ASSESS

S RV Risk Level Action required

4

8 Medium

Addition control measures to be taken.

Page 149: 1029 MP PH II Risk Assessment ERP - Template Xlsx

149 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page149of271

RISK ASSESS

S RV Risk Level Action required

3

3 Low

Continuous monitoring is requried

Page 150: 1029 MP PH II Risk Assessment ERP - Template Xlsx

150 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page150of271

RISK ASSESS

S RV Risk Level Action required

3

6 Medium

Additional control measures required

Page 151: 1029 MP PH II Risk Assessment ERP - Template Xlsx

151 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page151of271

RISK ASSESS

S RV Risk Level Action required

3

3 Low

Additional control measures required

Page 152: 1029 MP PH II Risk Assessment ERP - Template Xlsx

152 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page152of271

RISK ASSESS

S RV Risk Level Action required

3

6 Medium

Additional Control measures required

Page 153: 1029 MP PH II Risk Assessment ERP - Template Xlsx

153 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page153of271

RISK ASSESS

S RV Risk Level Action required

3

6 Medium

Review at next opportunity

Page 154: 1029 MP PH II Risk Assessment ERP - Template Xlsx

154 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page154of271

RISK ASSESS

S RV Risk Level Action required

Page 155: 1029 MP PH II Risk Assessment ERP - Template Xlsx

155 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page155of271

RISK ASSESS

S RV Risk Level Action required

Page 156: 1029 MP PH II Risk Assessment ERP - Template Xlsx

156 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page156of271

RISK ASSESS

S RV Risk Level Action required

Page 157: 1029 MP PH II Risk Assessment ERP - Template Xlsx

157 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page157of271

RISK ASSESS

S RV Risk Level Action required

Page 158: 1029 MP PH II Risk Assessment ERP - Template Xlsx

158 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page158of271

RISK ASSESS

S RV Risk Level Action required

Page 159: 1029 MP PH II Risk Assessment ERP - Template Xlsx

159 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page159of271

RISK ASSESS

S RV Risk Level Action required

Page 160: 1029 MP PH II Risk Assessment ERP - Template Xlsx

160 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page160of271

RISK ASSESS

S RV Risk Level Action required

Page 161: 1029 MP PH II Risk Assessment ERP - Template Xlsx

161 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page161of271

RISK ASSESS

S RV Risk Level Action required

Page 162: 1029 MP PH II Risk Assessment ERP - Template Xlsx

162 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page162of271

RISK ASSESS

S RV Risk Level Action required

Page 163: 1029 MP PH II Risk Assessment ERP - Template Xlsx

163 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page163of271

RISK ASSESS

S RV Risk Level Action required

Page 164: 1029 MP PH II Risk Assessment ERP - Template Xlsx

164 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page164of271

RISK ASSESS

S RV Risk Level Action required

Page 165: 1029 MP PH II Risk Assessment ERP - Template Xlsx

165 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page165of271

RISK ASSESS

S RV Risk Level Action required

Page 166: 1029 MP PH II Risk Assessment ERP - Template Xlsx

166 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page166of271

RISK ASSESS

S RV Risk Level Action required

Page 167: 1029 MP PH II Risk Assessment ERP - Template Xlsx

167 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page167of271

RISK ASSESS

S RV Risk Level Action required

Page 168: 1029 MP PH II Risk Assessment ERP - Template Xlsx

168 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page168of271

RISK ASSESS

S RV Risk Level Action required

Page 169: 1029 MP PH II Risk Assessment ERP - Template Xlsx

169 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page169of271

RISK ASSESS

S RV Risk Level Action required

Page 170: 1029 MP PH II Risk Assessment ERP - Template Xlsx

170 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page170of271

RISK ASSESS

S RV Risk Level Action required

Page 171: 1029 MP PH II Risk Assessment ERP - Template Xlsx

171 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page171of271

RISK ASSESS

S RV Risk Level Action required

Page 172: 1029 MP PH II Risk Assessment ERP - Template Xlsx

172 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page172of271

RISK ASSESS

S RV Risk Level Action required

Page 173: 1029 MP PH II Risk Assessment ERP - Template Xlsx

173 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page173of271

RISK ASSESS

S RV Risk Level Action required

Page 174: 1029 MP PH II Risk Assessment ERP - Template Xlsx

174 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page174of271

RISK ASSESS

S RV Risk Level Action required

Page 175: 1029 MP PH II Risk Assessment ERP - Template Xlsx

175 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page175of271

RISK ASSESS

S RV Risk Level Action required

Page 176: 1029 MP PH II Risk Assessment ERP - Template Xlsx

176 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page176of271

RISK ASSESS

S RV Risk Level Action required

Page 177: 1029 MP PH II Risk Assessment ERP - Template Xlsx

177 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page177of271

RISK ASSESS

S RV Risk Level Action required

Page 178: 1029 MP PH II Risk Assessment ERP - Template Xlsx

178 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page178of271

RISK ASSESS

S RV Risk Level Action required

Page 179: 1029 MP PH II Risk Assessment ERP - Template Xlsx

179 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page179of271

RISK ASSESS

S RV Risk Level Action required

Page 180: 1029 MP PH II Risk Assessment ERP - Template Xlsx

180 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page180of271

RISK ASSESS

S RV Risk Level Action required

Page 181: 1029 MP PH II Risk Assessment ERP - Template Xlsx

181 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page181of271

Scope of work - MW Installation

Page 182: 1029 MP PH II Risk Assessment ERP - Template Xlsx

182 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page182of271

I herby confirm that I have read the below requirements and risk assessment and shall strictly follow and implement, and in case of conflicts or doubts I shall consult with company H&S Manager to use the dynamic risk assessment, and I am fully responsible for my own safety and the safety of all the crew working on my site. and I confirm that all H&S documents shall be on site whenever any work is carried out.

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

Page 183: 1029 MP PH II Risk Assessment ERP - Template Xlsx

183 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page183of271

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

Page 184: 1029 MP PH II Risk Assessment ERP - Template Xlsx

184 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page184of271

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

Abnormal Situation of Site (Photos)Abnormal Situation of Site (Photos)

Page 185: 1029 MP PH II Risk Assessment ERP - Template Xlsx

185 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page185of271

Abnormal Situation of Site (Photos)Abnormal Situation of Site (Photos)

Page 186: 1029 MP PH II Risk Assessment ERP - Template Xlsx

186 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page186of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

Page 187: 1029 MP PH II Risk Assessment ERP - Template Xlsx

187 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page187of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

1 4

4

Site Vehicle will be parked near the site.The site vehilce must not carry more than 5 people inlucing driver.The car must be parked 5 meter far from the fence.Site Engineer will carry the key of site entrance gate.

Page 188: 1029 MP PH II Risk Assessment ERP - Template Xlsx

188 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page188of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

1 3

3

Max. 5 kg can be lifted by one person at one time.Ensure Rolling of cables must be performed by two person or more.Ensure nip and pinch points are identified.

Page 189: 1029 MP PH II Risk Assessment ERP - Template Xlsx

189 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page189of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

1 4

4

Two meter ladder will be used to work on the cable tray.Double lanyard will be used by riggers while climbing.Rigger's fall arrester will be connected to tower safety wire while climbing.Positioning lanyard will be used by each rigger.slings will be used.3 slings will be used to secure one anntena during installtion.1 rescue kit will be available near tower with assigned rescuer.

Page 190: 1029 MP PH II Risk Assessment ERP - Template Xlsx

190 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page190of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

1 4

4

The standard pulley will be installed at proper anchor point by rigger.The rope length must be twice according to tower height.1 meter sling will be used to hold the material.Rigger will use double lanyard, positioning lanyard and fall arrester.Conitinious monitoring by site enginner is required.Ensure the load will be attached with material fall arrestor.Tag lines will be used.Slings will be used.

Page 191: 1029 MP PH II Risk Assessment ERP - Template Xlsx

191 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page191of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

1 4

4

Riggers must be medically fit to climb the tower, Ensure

Wind speed meter is obtained by rigger at all the time.

Riggers must be careful while fixing of anntena to prevent from

hitting to tower. Anntenna and RRUs will be

secured with material fall arrestor.Riggers are trained by third party.Ensure continious monitoring by

site engineer.

Page 192: 1029 MP PH II Risk Assessment ERP - Template Xlsx

192 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page192of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

1 4

4

Riggers must be medically fit to climb the tower, Ensure

Wind speed meter is obtained by rigger at all the time.

Riggers must be careful while fixing of anntena to prevent from

hitting to tower. Anntenna and RRUs will be

secured with material fall arrestor.Riggers are trained by third party.Ensure continious monitoring by

site engineer.

Page 193: 1029 MP PH II Risk Assessment ERP - Template Xlsx

193 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page193of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

1 4

4

Page 194: 1029 MP PH II Risk Assessment ERP - Template Xlsx

194 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page194of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

1 3

3

Page 195: 1029 MP PH II Risk Assessment ERP - Template Xlsx

195 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page195of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

1 3

3

Tools must be carried in tools bag while working at height.Right tools for the right task shall be applied.

Page 196: 1029 MP PH II Risk Assessment ERP - Template Xlsx

196 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page196of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

The team must have RF monitor.

1 3

3

Page 197: 1029 MP PH II Risk Assessment ERP - Template Xlsx

197 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page197of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

1 3

3

2 Meter ladder will be used.One person will hold ladder while another person working on ladder.Ladder will be visually inspected before use by rigger.Ensure right cables are dismantled as per instruction by huawei.

Page 198: 1029 MP PH II Risk Assessment ERP - Template Xlsx

198 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page198of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

1 3

3

All waste material will be stored at one place and area will be barricaded by caution tape.After completion of work, all waste materials must be removed from site.

Page 199: 1029 MP PH II Risk Assessment ERP - Template Xlsx

199 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page199of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

Page 200: 1029 MP PH II Risk Assessment ERP - Template Xlsx

200 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page200of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

Page 201: 1029 MP PH II Risk Assessment ERP - Template Xlsx

201 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page201of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

Page 202: 1029 MP PH II Risk Assessment ERP - Template Xlsx

202 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page202of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

Page 203: 1029 MP PH II Risk Assessment ERP - Template Xlsx

203 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page203of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

Page 204: 1029 MP PH II Risk Assessment ERP - Template Xlsx

204 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page204of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

Page 205: 1029 MP PH II Risk Assessment ERP - Template Xlsx

205 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page205of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

Page 206: 1029 MP PH II Risk Assessment ERP - Template Xlsx

206 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page206of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

Page 207: 1029 MP PH II Risk Assessment ERP - Template Xlsx

207 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page207of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

Page 208: 1029 MP PH II Risk Assessment ERP - Template Xlsx

208 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page208of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

Page 209: 1029 MP PH II Risk Assessment ERP - Template Xlsx

209 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page209of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

Page 210: 1029 MP PH II Risk Assessment ERP - Template Xlsx

210 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page210of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

Page 211: 1029 MP PH II Risk Assessment ERP - Template Xlsx

211 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page211of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

Page 212: 1029 MP PH II Risk Assessment ERP - Template Xlsx

212 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page212of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

Page 213: 1029 MP PH II Risk Assessment ERP - Template Xlsx

213 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page213of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

Page 214: 1029 MP PH II Risk Assessment ERP - Template Xlsx

214 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page214of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

Page 215: 1029 MP PH II Risk Assessment ERP - Template Xlsx

215 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page215of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

Page 216: 1029 MP PH II Risk Assessment ERP - Template Xlsx

216 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page216of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

Page 217: 1029 MP PH II Risk Assessment ERP - Template Xlsx

217 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page217of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

Page 218: 1029 MP PH II Risk Assessment ERP - Template Xlsx

218 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page218of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

Page 219: 1029 MP PH II Risk Assessment ERP - Template Xlsx

219 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page219of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

Page 220: 1029 MP PH II Risk Assessment ERP - Template Xlsx

220 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page220of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

Page 221: 1029 MP PH II Risk Assessment ERP - Template Xlsx

221 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page221of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

Page 222: 1029 MP PH II Risk Assessment ERP - Template Xlsx

222 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page222of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

Page 223: 1029 MP PH II Risk Assessment ERP - Template Xlsx

223 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page223of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

Page 224: 1029 MP PH II Risk Assessment ERP - Template Xlsx

224 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page224of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

Page 225: 1029 MP PH II Risk Assessment ERP - Template Xlsx

225 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page225of271

ADDITIONAL CONTROLS

RISK ASSESS

L S RV

Page 226: 1029 MP PH II Risk Assessment ERP - Template Xlsx

226 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page226of271

Scope of work - MW Installation

Page 227: 1029 MP PH II Risk Assessment ERP - Template Xlsx

227 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page227of271

I herby confirm that I have read the below requirements and risk assessment and shall strictly follow and implement, and in case of conflicts or doubts I shall consult with company H&S Manager to use the dynamic risk assessment, and I am fully

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

Page 228: 1029 MP PH II Risk Assessment ERP - Template Xlsx

228 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page228of271

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

Page 229: 1029 MP PH II Risk Assessment ERP - Template Xlsx

229 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page229of271

Team leader will check for any leakage or spillage on site before start of any activity. If found team leader must report it to project management immediately.Two meters ladder will be used by riggers to work on cable tray Rigger will use double lanyard to climb on the tower for access to the AntennasRigger's fall arrester will be connected to tower safety wire while climbingEnsure that AC and DC Power must be locked-out and tagged-out.Only the certified and competent electrician will do the isolation of power.Ensure the grounding is connected to the bus bar. Use only insulated tools.1. Any Activity Must be suspended when it gets dark2. All working at height activities and crane operations are prohibited between sunset and sunrise (from 6:30 PM - 5:40 AM)3. Do not access site without the required mandatory PPE (Helmet, Safety Shoes and VIS Jacket) and do not remove them when inside the site.4. Other job based PPE requirements are stated in the below risk assessment based on the required activity5. Do not access the site without having valid safety passport6. Follow the heat stress guidelines7. Monitor wind speed regularly8. Pre-Task Briefing Must be done before any work on site, and must include all team members.9. Warning Tape and H&S Signs are to be used where required (as mentioned in the below risk assessment)

Additional Controls / Clear from photosAdditional Controls / Clear from photos

Abnormal Situation of Site (Photos)Abnormal Situation of Site (Photos)

Page 230: 1029 MP PH II Risk Assessment ERP - Template Xlsx

230 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page230of271

Additional Controls / Clear from photosAdditional Controls / Clear from photos

Abnormal Situation of Site (Photos)Abnormal Situation of Site (Photos)

Page 231: 1029 MP PH II Risk Assessment ERP - Template Xlsx

231 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page231of271

RISK ASSESS

Risk Level Action required

Page 232: 1029 MP PH II Risk Assessment ERP - Template Xlsx

232 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page232of271

RISK ASSESS

Risk Level Action required

low Review at next opportunity

Page 233: 1029 MP PH II Risk Assessment ERP - Template Xlsx

233 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page233of271

RISK ASSESS

Risk Level Action required

Low

Review at next opportunity

Page 234: 1029 MP PH II Risk Assessment ERP - Template Xlsx

234 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page234of271

RISK ASSESS

Risk Level Action required

Low

Monitoring required

Page 235: 1029 MP PH II Risk Assessment ERP - Template Xlsx

235 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page235of271

RISK ASSESS

Risk Level Action required

Low

Review at next opportunity

Page 236: 1029 MP PH II Risk Assessment ERP - Template Xlsx

236 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page236of271

RISK ASSESS

Risk Level Action required

Low

Continuous monitoring is requried

Page 237: 1029 MP PH II Risk Assessment ERP - Template Xlsx

237 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page237of271

RISK ASSESS

Risk Level Action required

Low

Continuous monitoring is requried

Page 238: 1029 MP PH II Risk Assessment ERP - Template Xlsx

238 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page238of271

RISK ASSESS

Risk Level Action required

Low

Review at next opportunity

Page 239: 1029 MP PH II Risk Assessment ERP - Template Xlsx

239 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page239of271

RISK ASSESS

Risk Level Action required

Low

Continuous monitoring is requried

Page 240: 1029 MP PH II Risk Assessment ERP - Template Xlsx

240 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page240of271

RISK ASSESS

Risk Level Action required

Low

Continuous monitoring is requried

Page 241: 1029 MP PH II Risk Assessment ERP - Template Xlsx

241 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page241of271

RISK ASSESS

Risk Level Action required

Low

Review at next opportunity

Page 242: 1029 MP PH II Risk Assessment ERP - Template Xlsx

242 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page242of271

RISK ASSESS

Risk Level Action required

Low

Review at next opportunity

Page 243: 1029 MP PH II Risk Assessment ERP - Template Xlsx

243 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page243of271

RISK ASSESS

Risk Level Action required

Low

Review at next opportunity

Page 244: 1029 MP PH II Risk Assessment ERP - Template Xlsx

244 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page244of271

RISK ASSESS

Risk Level Action required

Page 245: 1029 MP PH II Risk Assessment ERP - Template Xlsx

245 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page245of271

RISK ASSESS

Risk Level Action required

Page 246: 1029 MP PH II Risk Assessment ERP - Template Xlsx

246 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page246of271

RISK ASSESS

Risk Level Action required

Page 247: 1029 MP PH II Risk Assessment ERP - Template Xlsx

247 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page247of271

RISK ASSESS

Risk Level Action required

Page 248: 1029 MP PH II Risk Assessment ERP - Template Xlsx

248 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page248of271

RISK ASSESS

Risk Level Action required

Page 249: 1029 MP PH II Risk Assessment ERP - Template Xlsx

249 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page249of271

RISK ASSESS

Risk Level Action required

Page 250: 1029 MP PH II Risk Assessment ERP - Template Xlsx

250 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page250of271

RISK ASSESS

Risk Level Action required

Page 251: 1029 MP PH II Risk Assessment ERP - Template Xlsx

251 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page251of271

RISK ASSESS

Risk Level Action required

Page 252: 1029 MP PH II Risk Assessment ERP - Template Xlsx

252 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page252of271

RISK ASSESS

Risk Level Action required

Page 253: 1029 MP PH II Risk Assessment ERP - Template Xlsx

253 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page253of271

RISK ASSESS

Risk Level Action required

Page 254: 1029 MP PH II Risk Assessment ERP - Template Xlsx

254 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page254of271

RISK ASSESS

Risk Level Action required

Page 255: 1029 MP PH II Risk Assessment ERP - Template Xlsx

255 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page255of271

RISK ASSESS

Risk Level Action required

Page 256: 1029 MP PH II Risk Assessment ERP - Template Xlsx

256 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page256of271

RISK ASSESS

Risk Level Action required

Page 257: 1029 MP PH II Risk Assessment ERP - Template Xlsx

257 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page257of271

RISK ASSESS

Risk Level Action required

Page 258: 1029 MP PH II Risk Assessment ERP - Template Xlsx

258 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page258of271

RISK ASSESS

Risk Level Action required

Page 259: 1029 MP PH II Risk Assessment ERP - Template Xlsx

259 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page259of271

RISK ASSESS

Risk Level Action required

Page 260: 1029 MP PH II Risk Assessment ERP - Template Xlsx

260 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page260of271

RISK ASSESS

Risk Level Action required

Page 261: 1029 MP PH II Risk Assessment ERP - Template Xlsx

261 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page261of271

RISK ASSESS

Risk Level Action required

Page 262: 1029 MP PH II Risk Assessment ERP - Template Xlsx

262 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page262of271

RISK ASSESS

Risk Level Action required

Page 263: 1029 MP PH II Risk Assessment ERP - Template Xlsx

263 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page263of271

RISK ASSESS

Risk Level Action required

Page 264: 1029 MP PH II Risk Assessment ERP - Template Xlsx

264 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page264of271

RISK ASSESS

Risk Level Action required

Page 265: 1029 MP PH II Risk Assessment ERP - Template Xlsx

265 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page265of271

RISK ASSESS

Risk Level Action required

Page 266: 1029 MP PH II Risk Assessment ERP - Template Xlsx

266 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page266of271

RISK ASSESS

Risk Level Action required

Page 267: 1029 MP PH II Risk Assessment ERP - Template Xlsx

267 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page267of271

RISK ASSESS

Risk Level Action required

Page 268: 1029 MP PH II Risk Assessment ERP - Template Xlsx

268 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page268of271

RISK ASSESS

Risk Level Action required

Page 269: 1029 MP PH II Risk Assessment ERP - Template Xlsx

269 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page269of271

RISK ASSESS

Risk Level Action required

Page 270: 1029 MP PH II Risk Assessment ERP - Template Xlsx

270 of 271Sie Specific Risk

Assemssent

02/26/2016 - Risk Assessment HUAWEI Confidential Page270of271

RISK ASSESS

Risk Level Action required

Page 271: 1029 MP PH II Risk Assessment ERP - Template Xlsx

Site Emergency Response

HUAWEI - Qatar - Internal Proprietary – Use pursuant to Company instruction Page 1 of 1

# Emergency Response Steps

1 Site Manager (Always In charge)

2 Fire Emergency

3 First Aid Emergency

4 Major Injury / Severe Emergencies 999

5 Falling From Height

6 Site Evacuation

7 Others

Comments:

S. Supervisor: NameS.P Number: Number

Rescuer: NameS.P Number: Number

Rescuer: NameS.P Number: Number

Rescuer: NameS.P Number: Number

Describe evacuation from site: (R.T and IBS)

E.R. PlanE.R. Plan Site ID - Site ID - Scope of work - Date - Date -