Page 1: 10 project communications

ENG. OMER ALSAYED OMER

MBA, PMP, B.SC.(CIVIL ENG.)

: PMO MANAGER @EWU-DIU

[email protected] facebook.com/2t-pm +249123494587

Page 2: 10 project communications

א א א ﴿١٨﴾

﴿١٩

OSO OCT 2013

Page 3: 10 project communications

Project Communications Managementincludes the processes that are required to ensure timely and appropriate :

OSO OCT 2013

planning,  collection,  creation,  distribution,  storage, 

retrieval,  management,  control,  Monitoring ultimate disposition

of project information.

Page 4: 10 project communications

Project Communications Processes

OSO OCT 2013

10.2 Manage Communications10.1 Plan Communications M 10.3 Control Communications

Page 5: 10 project communications

Communication potential dimensions 

OSO OCT 2013

Page 6: 10 project communications

Project Management Process Group and Knowledge Area Mapping

Knowledge Area Initiating Planning Executing M& C Closing

4. Project Integration Management 4DevelopProject Charter

4.2 Develop ProjectManagement Plan

4.3 Direct & Manage Project Work

4.4 Monitor & Control Project Work4.5 Perform Integrated Change Control

4.6 Close Projector Phase

5. Project Scope Management

5Plan Scope Management5.2 Collect Requirements5.3 Define Scope5.4 Create WBS

5.5 Validate Scope5.6 Control Scope

6. Project Time Management

6Plan Schedule Management6.2 Define Activities6.3 Sequence Activities6.4 Estimate Activity Resources6.5 Estimate Activity Durations6.6 Develop Schedule

6.7 Control Schedule

7. Project Cost Management7Plan Cost Management7.2 Estimate Costs7.3 Determine Budget

7.4 Control Costs

8. Project Quality Management 8Plan Quality Management 8.2 Perform Quality Assurance 8.3 Control Quality

9. Project Human Resource Management

9.1 Plan Human ResourceManagement

9.2 Acquire Project Team9.3 Develop Project Team9.4 Manage Project Team

10. Project Communications Management 10Plan Communications Management 10.2 Manage Communications 10.3 Control Communications

11. Project Risk Management

11Plan Risk Management11.2 Identify Risks11.3 Perform Qualitative Risk Analysis11.4 Perform Quantitative Risk Analysis11.5 Plan Risk Responses

11.6 Control Risks

12. Project Procurement Management 12Plan Procurement Management 12.2 Conduct Procurements 12.3 Control Procurements 12.4 Close 

Procurements

13. Project Stakeholder Management

13IdentifyStakeholders

13.2 Plan StakeholderManagement

13.3 Manage StakeholderEngagement

13.4 Control StakeholderEngagement

OSO OCT 2013

Page 7: 10 project communications

communication skills

Listening Questioning Educating Fact‐finding Setting expectations

Persuading Motivating Coaching Negotiating Resolving conflict

Summarizing

OSO OCT 2013

55% of communications is non-verbal 90% of Project Manager's time is communicating

Page 8: 10 project communications

Effective Listening

OSO OCT 2013

the most important skills for a PM1. Face the speaker and maintain EYE contact.

2. Be attentive, but relaxed.

3. Keep an open mind.

4. Listen  & PICTURE what is saying

5. Don’t INTERRUPT or impose your “solutions.”

9 Give the speaker regular FEEDBACK

8 Try to FEEL what the speaker is feeling

7 Ask questions only to ENSURE understanding

6 Wait for the speaker to pause to ask CLARIFYING questions.

10 Pay attention to what ISN’T said—to nonverbal cues

Page 9: 10 project communications

!

OSO OCT 2013

Face the speaker and maintain EYE contact

10 Pay attention to what ISN’T said—to nonverbal cues

Don’t INTERRUPT or impose your “solutions.”

Page 10: 10 project communications

10.1 Plan Communications Management

developing an appropriate APPROACH and plan for project communications based on.

OSO OCT 2013

Inputs

Project management planStakeholder registerEnterprise environmental factorsOrganizational process assets

T&T

Communication requirements analysisCommunication technologyCommunication modelsCommunication methodsMeetings

Outputs

Communications management planProject documents updates

identifies and documents the approach to communicate most EFFECTIVELY and EFFICIENTLY with stakeholders.

stakeholder’s information

needs

requirements

available

organizational assets

Page 11: 10 project communications

4 Integration 5 Scope 6 Time 7 Cost 8 Quality 9 H. Resource 10 Commn. 11 Risk 12 Procurement 13 S/holders

EEF

OPA

Enterprise/ Organization10.1 Plan 

CommunicationsManagement

10.1.1

10.1.3

10.1.4Communications management  plan

10.2 ManageCommunications

Communication requirements analysis

Communication technology

Communication models

Communication methods

Meetings

10.1 Plan Communications Management Data flow diagram

OSO

OC

T 20

13

4.2 Develop Project M Plan

Project M Plan

13.1 IdentifyStakeholders

S/H Register

10.1.2

13.3 ManageStakeholderEngagement

ProjectDocuments

ProjectDocuments (U)

Schedule

S/H REGISTER

Page 12: 10 project communications

10.1 Plan CommunicationsImportant considerations :

OSO OCT 2013

Who :•needs /authorized;

When •need

Where •stored;

What •format

How •retrieved

Whether •barriers

Page 13: 10 project communications

10.1 Plan Communications

OSO OCT 2013

information is provided

in the RIGHTformat

at the RIGHTtime

To the RIGHT

audiencewith the RIGHTimpact. 

providing ONLY the information that is NEEDED..

Efficient communication 

Page 14: 10 project communications

10.1.2.1 Communication Requirements Analysis

information needs  type and format  value of information.

OSO OCT 2013

Organizational charts;

Project organization & stakeholder responsibility relationships;

Disciplines, departments, and specialties

Logistics of how many / at which locations;

Internal information needs (within organizations);

External information needs (media, public, or contractors)

Stakeholder information (stakeholder register)

1 Plan Communications Management

Sources of information to identify /define project communication requirements:

Page 15: 10 project communications

number of potential communication channels 

OSO OCT 2013

PCC

n(n – 1)/2

Page 16: 10 project communications

10.1.2 Plan Communications Management: Tools and Techniques

10.1.2.2 Communication TechnologyThe methods used to transfer information 

OSO OCT 2013

2 Plan Communications Management

Factors that can affect the choice of communication technology :

Page 17: 10 project communications

10.1.2 Plan Communications Management: Tools and Techniques

10.1.2.3 Communication Models

OSO OCT 2013

3 Plan Communications Management

Encode

Decode

Decode

Encode

receiver

Transmit Message Noise 

Noise 

Feedback Message

Acknowledge Message

medium

Page 18: 10 project communications

10.1.2 Plan Communications Management: Tools and Techniques

10.1.2.3 Communication Models

Encode• Thoughts/ideas translated  into language.

Transmit Message.• information through communication channel (medium).

NOISE :• various factors compromised message.

Decode. • message translated back into meaningful thoughts or ideas.

Acknowledge• signal receipt of the message

Feedback/Response• transmits message to the original sender.

OSO OCT 2013

3 Plan Communications Management

Page 19: 10 project communications

10.1.2 Plan Communications Management: Tools and Techniques

10.1.2.4 Communication methodsseveral communication methods that are used to share information among project stakeholders.

OSO OCT 2013

4 Plan Communications Management

• 2+• Multi‐dir• Efficient

•meetings, phone calls, instant messaging, video conferencing

Interactive 

distributed understood ?letters, memos, reports, emails, 

press releases, etc.

Push 

large volumes intranet sites, e‐learning, lessons learned databases, 

knowledge repositories, etc.

Pull 

Page 20: 10 project communications

10.1.2 Plan Communications Management: Tools and Techniques

10.1.2.5 Meetingsto determine the most APPROPRIATE way to update and communicateproject information, and to respond to requests from various stakeholders for that information

OSO OCT 2013

4 Plan Communications Management

Page 21: 10 project communications

10.1.3 Plan Communications Management: outputs

10.1.3.1 Communications Management PlanStakeholder 

communication requirements;

Information to be communicated, 

Reason for the distribution of that 

information;

Time frame and frequency 

Person responsible for communicating the 

information;

Person responsible for authorizing release of 

confidential information;

Person or groups who will receive the information;

Methods or technologies 

Resources  Escalation process 

Method for updating and refining the communications management plan 

Glossary of common terminology;

Flow charts of the information flow 

Communication constraints 

OSO OCT 2013

1 Plan Communications Management

Page 22: 10 project communications

10.2 Manage Communications

creating, collecting, distributing, storing, retrieving, and the ultimate disposition of project information in accordance to the communications management plan. 

OSO OCT 2013

Inputs

Communications management planWork performance reportsEnterprise environmental factorsOrganizational process assets

T&T

Communication technologyCommunication modelsCommunication methodsInformation management systemsPerformance reporting

Outputs

Project communicationsProject management plan updatesProject documents updatesOrganizational process assets updates

enables an EFFICIENT & EFFECTIVEcommunications flow between project stakeholders.

Page 23: 10 project communications

4 Integration 5 Scope 6 Time 7 Cost 8 Quality 9 H. Resource 10 Commn. 11 Risk 12 Procurement 13 S/holders

EEF

OPA

Enterprise/ Organization10.1 Plan 

CommunicationsManagement

Communications management  

plan

10.2 ManageCommunications

Communication technology

Communication models

Communication methods

Information management systems

Performance reporting

10.2 Manage CommunicationsData flow diagram

OSO

OC

T 20

13

ProjectDocuments

4.4 Monitor & control P. works

Workperformance 

reports

Project Communications

ProjectDocuments (U)

OPA(U)

10.3 CONTROLCommunications

Issue logProject schedule, andProject funding requirements

Page 24: 10 project communications

Information management systems

letters, memos, reports, 

Hard‐copy document management

e‐mail, fax, voice mail, telephone, video and web conferencing, 

websites, and web publishing; and

Electroniccommunications management

web interfaces to scheduling and 

project management software,

EPMT Electronic project management tools

OSO OCT 2013

4 10.2 Manage Communications

Page 25: 10 project communications

Performance reportingAnalysis of past performance,

Analysis of project forecasts

Current status of risks and issues,

Work completed during the period,

Work to be completed in the next period,

Summary of changes approved in the period, and

Other relevant information, which is reviewed and discussed.

OSO OCT 2013

5 10.2 Manage Communications

collecting and distributing performance information, including:

Page 26: 10 project communications

Performance reporting•where the project now standsStatus Report 

•what has been accomplished.Progress Report 

• if performance is improving or deterioratingTrend Report 

• future project status and performance.Forecasting Report 

OSO OCT 2013

5 10.2 Manage Communications

Daily weekly MonthlyREPORT

Daily weekly MonthlyREPORT

Page 27: 10 project communications

OSO OCT 2013

Page 28: 10 project communications

10.2.3.1 Project CommunicationsProject communications may include but are not limited to:

OSO OCT 2013

1 10.2 Manage Communications

the urgency and impact

method of delivery, 

level of confidentiality.

factors influence Project communications

performance reports, 

deliverables status, 

schedule progress, 

cost incurred. 

Page 29: 10 project communications

10.2.3.1 Project Documents Updates10.2.3.4 Organizational Process Assets Updates

OSO OCT 2013

1 10.2 Manage Communications

Project Documents Updates

Issue log, Project schedule

Project funding requirements.

Organizational Process Assets Updates

Stakeholder notifications.

Project reports

Project presentations

Project records.

Feedback from stakeholders

Lessons learned documentation

Page 30: 10 project communications

10.3 Control Communications

to ensure the information NEEDS of the project stakeholders are met. 

OSO OCT 2013

Inputs

Project management planProject communicationsIssue logWork performance dataOrganizational process assets

T&T

Information management systemsExpert judgmentMeetings

Outputs

Work Performance informationChange requestsProject management plan updatesProject documents updatesOrganizational process assets updates

it ensures an OPTIMALinformation flowamong all communication participants, at any moment in time

Page 31: 10 project communications

10.3 Control Communications Data Flow Diagram

OSO OCT 2013

10.2 Manage

Communications

Project communications

4.2 Develop

PMP Project 

management plan

10.3 Control

Communications

4.3 D&M project works

13.3 Manage SH engagement

Enterprise / Organization

Project documents

4.4 M&C project works

4.5 Perform ICC

Project management 

plan (u)

Work performance data

Issue log

OPA

Project documents updates

Work Performance information

Change requests

Page 32: 10 project communications

10.3.1.1 Project management plan

OSO OCT 2013

1 10.3 Control Communications

Page 33: 10 project communications

10.3.1.3 Issue log

OSO OCT 2013

3 10.3 Control Communications

document and monitor the resolution of issues

Page 34: 10 project communications

10.3.1.5 Organizational process assets

OSO OCT 2013

5 10.3 Control Communications

Page 35: 10 project communications

10.3.2.1 Information Management Systems

OSO OCT 2013

1 10.3 Control Communications

Distribute costs, schedule progress, and performanceinformation to stakeholders

table reporting, spreadsheet analysis, and presentations

Page 36: 10 project communications

10.3.3.1 Work Performance Information

•performance data. 

•performance data. 

organizes and summarizes

• information • information 

provides status and progress •

stakeholders.•stakeholders.

communicated to

OSO OCT 2013

OUTPUTS

3 10.3 Control Communications

Page 37: 10 project communications

EXAMPLE (COST)

WP AC PV %

EW 125 100 100%

CW 180 250 80%

OSO OCT 2013

OUTPUTS

3 10.3 Control Communications

WP AC EV CPI

EW 125 100 0.80

CW 180 200 1.11

WP PV CPI FC

EW 100 0.80 125

CW 250 1.11 225

EW

CW

ALL

AC PV EV FC

125 100 100 125

180250

200 225

305 350300

350

PROJECT COST PERFORMANCEEW CW ALL

Page 38: 10 project communications

Other outputs :example (cost)From previous example what will happened?

OSO OCT 2013

OUTPUTS

3 10.3 Control Communications

E…

A…

AC PV EV FC

125 100 100 125

180

250200 225

305350

300350

PROJECT COST PERFORMANCEEW CWALL• Change Requests ?10.3.3.2

• Project Management Plan Updates?10.3.3.3

• Project Documents Updates?10.3.3.4

• Organizational Process Assets Updates?10.3.3.5

Page 39: 10 project communications