10-optix bws 1600g v100r002 equipment operation and maintenance issue1.20
TRANSCRIPT
-
7/15/2019 10-Optix Bws 1600g v100r002 Equipment Operation and Maintenance Issue1.20
1/27
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved
www.huawei.com
Internal
OTC103205 OptiX BWS
1600G Equipment
Operation and Maintenance
ISSUE 1.20
-
7/15/2019 10-Optix Bws 1600g v100r002 Equipment Operation and Maintenance Issue1.20
2/27
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 1
Upon completion of this course, you will be able to:
Check the equipment running environment
List the Items of Routine Maintenance
Monitor and check the NE and card state
according the visual indicators and alarms
Replace the faulty boards
Implement on-site routine operation and
maintenance accord the Routine Maintenance
Records
-
7/15/2019 10-Optix Bws 1600g v100r002 Equipment Operation and Maintenance Issue1.20
3/27
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 2
Chapter 1 Basic Operations
Chapter 2 Routine Maintenance
-
7/15/2019 10-Optix Bws 1600g v100r002 Equipment Operation and Maintenance Issue1.20
4/27
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 3
Basic Operations
Alarm Muting Cleaning Fan Filter
Using Orderwire Phone
Analyzing and Testing Optical Spectrum
Plugging/Unplugging patch cord
Plugging/Unplugging and Replacing Board
Equipment Power on and Power Off
Resetting Board
Test of Receiving/Transmitting Optical Power
Bit Error Test
-
7/15/2019 10-Optix Bws 1600g v100r002 Equipment Operation and Maintenance Issue1.20
5/27
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 4
Alarm Muting
Step Operation
1 Check the MUTE switch on the cabinet, which shall be ON
normally. Set the switch to OFF and the alarm sound stops.
2 Check the ALC switch on SCC, which shall be ON normally.
After confirming an alarm, set the switch to OFF and the alarm
sound stops.
3 If alarms are connected externally to the centralized alarming
system, check if the switches and connection cables on the
centralized alarm system are normal.
-
7/15/2019 10-Optix Bws 1600g v100r002 Equipment Operation and Maintenance Issue1.20
6/27
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 5
Cleaning Fan Filter
Step Operation
1 Check whether there is FAN_FAIL
alarm on NM.
2 Check the running of six fans. The
six green indicators are on and the
red indicator is off when therunning is normal.
Step Operation
1 Draw out the air filter by the handle. Take the air
filter outdoors and wash it, then mop it and have
it blown to dry at a place with good ventilation.
2 After cleanup, insert the air filter back. Align the
air filter to the guide rail on the lower part of the
subrack, and push it in gently.
1. Fan (6 PCS) 2. Air filter 3. Handle
4. Fan running
indicator (6 PCS)
5.Alarm
indicator
6.
Connector
-
7/15/2019 10-Optix Bws 1600g v100r002 Equipment Operation and Maintenance Issue1.20
7/27HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 6
Using Orderwire Phone
Step Operation
1 When the orderwire phone rings, with thered indicator at back flashing, it indicates
there is an incoming call.
2 Off-hook the phone, press button TALK
and then the red indicator on upper right
is on, and the call is through
Step Operation
1 Set the ring switch of telephone to ON
2 Set the dial mode switch to T and select
dual-tone dialing
Step Operation
1 Off-hook the phone, press TALK on the
face and then the red indicator on upper
right is on, accompanied by dialing tone.
2 Dial the orderwire number of other NEs
Set the orderwire phone
Dial orderwire phoneAnswer an orderwire call
-
7/15/2019 10-Optix Bws 1600g v100r002 Equipment Operation and Maintenance Issue1.20
8/27
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 7
Analyzing and Testing Optical Spectrum
Step Operation
1 Connect the board at MPI-S/MPI-R with a spectrum
analyzer.
2 Set the spectrum analyzer to the WDM test mode.
3 Test the indices of each channel of signal and record the
result.
4 Compare the result with history or standard data, and
then analyze the exceptional data.
Spectrumanalyzer
RUN
ALM
OAU
MON
IN OUT TDCRDC
-
7/15/2019 10-Optix Bws 1600g v100r002 Equipment Operation and Maintenance Issue1.20
9/27
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 8
Plugging/Unplugging Patch Cord
Four kinds of optical interfaces:
SC/PC,LC/PC,FC/PC,E2000/APC
Plug/unplug SC/PC: use special tool
(such as fiber extractor)
Plug/unplug LC/PC: in the axial direction
without rotation
SC/PC fiber jumperLC/PC fiber jumper FC/PC fiber jumper
E2000/APC fiber jumper
-
7/15/2019 10-Optix Bws 1600g v100r002 Equipment Operation and Maintenance Issue1.20
10/27
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 9
A B
C
Plugging/Unplugging Card
No Fiber Connected
Plugging: ABC
D E
Unplugging :DE
-
7/15/2019 10-Optix Bws 1600g v100r002 Equipment Operation and Maintenance Issue1.20
11/27
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 10
Replacing Card
Handle bar
Board type ID SSE1OAU01
Card
Make sure the board to be replaced and the replacement
board are the same board type, especial for OTU cards.
For example: SSE1OAU01
-
7/15/2019 10-Optix Bws 1600g v100r002 Equipment Operation and Maintenance Issue1.20
12/27
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 11
Replacing SCC/SCE board
Replacing Card
On SCC/SCE, there are NE ID, nesoft, configuration data, so pay
special attention:
Before replacement, configure the ID
After replacement, resend the configuration data to NE from NMS
-
7/15/2019 10-Optix Bws 1600g v100r002 Equipment Operation and Maintenance Issue1.20
13/27
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 12
Before replacement
During replacement
After replacement
Check board version
(Especially for OTU)
Detailed information can be
obtained from the bar code.
Skilled at the operation methods in
General precautions.
The setting of board jumpers and DIP
switches;
Input optical power range of optical
interface board;
Remove the optical fiber from the frontpanel;
Width of the front panel.
Wear an ESD wrist strap. Correctly
swap the board. Avoid short-circuit
of the board.
Prevent eyes from being hurt by the
laser.
Check whether the board
is working normally, and
upload configuration on
the NM again.
If you replace the SCC board, you should
upload the original SCC configuration data
to the NM, and then download them from
the NM to the new SCC.
Pay attention to NE user configuration.
Replacing Card
-
7/15/2019 10-Optix Bws 1600g v100r002 Equipment Operation and Maintenance Issue1.20
14/27
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 13
Classification ofboards
Board name Remarks
Opticaltransponder unit
OTU For new OTU:a. The type is identical with the original one.
b. The wavelength, optical module is identical with that of theoriginal one.
Optical amplifierunit
OA a. Prevent the over-high input optical power from damaging opticalcomponents.
b. Keep the operating band of the new optical amplifier unitidentical with that of the original one.
c. Do not stare into the output optical interface, since the outputoptical power of OA is very high.
Opticalmultiplexing/demultiplexing &
add/dropmultiplexing unit
MUX/DEMUX
a. Prevent the over-high input optical power from damaging opticalcomponents.
b. Keep the operating band of the new optical amplifier unit
identical with that of the original one.c. Keep the type of the substitute board identical with that of theoriginal one.
Optical supervisorychannel unit
SC1, SC2
TC1, TC2
a. The type of the substitute board is identical with that of theoriginal one and whether it supports LHP system application.
b. The input optical power
Classification of Board Replacement
-
7/15/2019 10-Optix Bws 1600g v100r002 Equipment Operation and Maintenance Issue1.20
15/27
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 14
Power on and Power off
Sequence of power on: PWR1&PWR2SW1&&SW4
Sequence of power off: SW1&&SW4PWR1&PWR2
-
7/15/2019 10-Optix Bws 1600g v100r002 Equipment Operation and Maintenance Issue1.20
16/27
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 15
RUN
ALM
SCC
ETN
RUN
ALC
RST
Resetting Board
Methods:
RST Button
Plugging/Unplugging Board
NMS hot reset
NMS cold reset
-
7/15/2019 10-Optix Bws 1600g v100r002 Equipment Operation and Maintenance Issue1.20
17/27
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 16
Test Optical Power
POWER METER
DISPLAY
CONTROL
OPTICAL INTERFACE BOARD
TEST INTERFACE
POWER
BOARD
OUT/Tx
MON
Offline test
Connect power meter to OUT/Tx port
Online test Connect power meter to MON port
-
7/15/2019 10-Optix Bws 1600g v100r002 Equipment Operation and Maintenance Issue1.20
18/27
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 17
Bit Error Test
Step Operation
1 Set the BER tester and connect it to perform the BER test.
Multiple OTU (Optical Transponder Unit) boards can be cascaded
for BER test. The dot line may represent multiple OTUs (including
the OTU of the opposite end), or the optical path consisting of the
multiplexer unit, demultiplexing unit and the amplifier unit.2 Start 24h BER test, the error should be 0 normally.
3 If any bit error occurs within 24 hours, locating the fault by
analyzing the B1 value of the OTU through the NM. Conduct the
test again after the fault is removed.
BER tester
out
in
OTUOTU
Attenuator
AttenuatorAttenuator
-
7/15/2019 10-Optix Bws 1600g v100r002 Equipment Operation and Maintenance Issue1.20
19/27
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 18
Precautions for System Operation
Dustproof
Moisture proof
Attenuation
Safety of your eyes Implement anti-electrostatic measure
Be careful when plugging/unplugging board
Do not plug/unplug board with fiber connected
Pay attention to the difference of OTU when replacing it
Strictly prohibit to install and remove power wire with power on
-
7/15/2019 10-Optix Bws 1600g v100r002 Equipment Operation and Maintenance Issue1.20
20/27
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 19
Chapter 1 Basic Operations
Chapter 2 Routine Maintenance
-
7/15/2019 10-Optix Bws 1600g v100r002 Equipment Operation and Maintenance Issue1.20
21/27
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 20
Routine Maintenance ItemsCycle Maintenance item
Daily Check the power supply in equipment room
Check the temperature and humidity of equipment room
Check the cleanness of equipment room
Observe the cabinet indicators
Observe the board indicators
Check the audio alarm of the equipment
Monthly Check the fan tray assembly and clean the air filter
Check the orderwire phone
Test bit error rate (BER)
QuarterlyTest optical signal-to-noise ratio (OSNR) at main path
interface at the receiver (MPI-R)
Test OSNR at main path interface at the transmitter (MPI-S)
Check the cleanness of cabinet
Yearly Check grounding cable and power cable
-
7/15/2019 10-Optix Bws 1600g v100r002 Equipment Operation and Maintenance Issue1.20
22/27
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 21
Environment
Power - 48V (-38.4 ~ -57.6V )
Reliable Grounding
Requirements for Temperature and Humidity
Equipment name Temperature Relative humidity
Long-termrunning
Short-termrunning
Long-termrunning
Short-termrunning
OptiX BWS
1600G
0C 40C -5C 45C 10% 90% 5% 95%
Note: The temperature and humidity are measured at 1.5 m above the floor
and 0.4 m in front of the equipment. Short term means that the successiveworking time does not exceed 72 hours and the accumulated time every
year does not exceed 15 days.
-
7/15/2019 10-Optix Bws 1600g v100r002 Equipment Operation and Maintenance Issue1.20
23/27
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 22
Observe the Cabinet Indicators
Indicator Name Status
On Off
Red
Indicator
Critical
alarm
indicator
The equipment
has a critical alarm,
which is accompanied
by the audio alarm
The equipment
does not have any
critical alarm
Yellow
Indicator
Major alarm
indicator
The equipment has
a major alarm
The equipment
does not have any
major alarm
Green
indicator
Power
Indicator
Current power
supply of equipment
is normal
Power supply of
equipment is
interrupted currently
-
7/15/2019 10-Optix Bws 1600g v100r002 Equipment Operation and Maintenance Issue1.20
24/27
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 23
Observe the Board Indicators (SCC/SCE)
Indicator Status Description
Green
(Running
indicator)
Off The equipment is not powered on
On for 0.5 s and then off for 0.5 s Wait to load programs
On for 100 ms and then off for 100 ms Loading programs
On for 1 s and then off for 1 s Running normally
Red
(Alarm
indicator)
Off No alarm
Flashing once every other second Minor alarm
Flashing twice every other second Major alarm
Flashing three times every other second Critical alarm
Flashing quickly and continuously (not
applicable for SCE)
Called by an orderwire phone
On The board is damaged
Yellow
(Ethernet
indicator)
Off Communication between NE and NM is
abnormal or interrupted
On Communication between NE and NM is
normal
Flashing Data is being transmitted between NE and
NM
-
7/15/2019 10-Optix Bws 1600g v100r002 Equipment Operation and Maintenance Issue1.20
25/27
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 24
Observe the Board Indicators (other cards)
Indicator Status Description
Green
(Running
indicator)
Flashing five times every second Not running
Flashing once every other second Running normally
On for two seconds and then off
for two seconds
The communication with SCC
unit is interrupted, and theequipment is in off-line workingstate
Red
(Alarmindicator)
Off No alarm
Flashing three times every othersecond
Critical alarm
Flashing twice every othersecond Major alarm
Flashing once every other second Minor alarm
On Self-check failed due to faultyhardware
-
7/15/2019 10-Optix Bws 1600g v100r002 Equipment Operation and Maintenance Issue1.20
26/27
HUAWEI TECHNOLOGIES CO., LTD. All rights reserved Page 25
Summary Basic operations
Precautions for system operation
Routine Maintenance
-
7/15/2019 10-Optix Bws 1600g v100r002 Equipment Operation and Maintenance Issue1.20
27/27
www.huawei.com
Thank You