10 operations decisions 1. how the 10 operations decisions below are applied in mango? goods &...

13
10 Operations Decisions 1

Upload: willow-mathews

Post on 31-Mar-2015

216 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 10 Operations Decisions 1. How the 10 operations decisions below are applied in Mango? Goods & service design Quality Process & capacity design Location

10 Operations Decisions

1

Page 2: 10 Operations Decisions 1. How the 10 operations decisions below are applied in Mango? Goods & service design Quality Process & capacity design Location

How the 10 operations decisions below are applied in Mango?

• Goods & service design • Quality • Process & capacity design• Location selection• Layout design• Human resource and job design• Supply-chain management• Inventory• Scheduling• Maintenance

2

Page 3: 10 Operations Decisions 1. How the 10 operations decisions below are applied in Mango? Goods & service design Quality Process & capacity design Location

Goods & service design• All of the garments and accessories are

designed around the idea of collections and matching items

• Production and distribution is an essential part of the process, together with high standards of quality at all stages, from controls at source to the final point of sale

• Their garments and accessories are high-to-medium quality and always seek to maintain the same manufacturing standard (a constant level of quality, the same characteristics, etc.)

3

Page 4: 10 Operations Decisions 1. How the 10 operations decisions below are applied in Mango? Goods & service design Quality Process & capacity design Location

Quality• The possible presence of hazardous substances in their

garments and accessories is a risk inherent to the manufacturing sector– the instructions to their suppliers and the continual

monitoring of the same by specialised laboratories means that this risk is controlled in a reasonable way at all times

• Exhaustive quality control at all stages of the production chain ensures that their garments and accessories are suitable for any occasion

4

Page 5: 10 Operations Decisions 1. How the 10 operations decisions below are applied in Mango? Goods & service design Quality Process & capacity design Location

Process & capacity design• Mango doesn’t have any factories and all of its designs are

subcontracted to extern suppliers who are responsible of the manufacture process.

• Their suppliers generally cover the entire production process (cutting, producing, ironing, packaging, etc)

• The nature of their products and their production system largely determine the characteristics of their manufacturers and production workshops, and the relationship they have with these in certain aspects, such as: manufacturing time, price of garments, technology, capacity, quality, organisation, professionalism, international experience, etc.

5

Page 6: 10 Operations Decisions 1. How the 10 operations decisions below are applied in Mango? Goods & service design Quality Process & capacity design Location

Location selection

The franchise system is used in countries where the cultural and administrative characteristics are different to ours and it is therefore more appropriate that people in their own country manage the stores.

At 2007 the group had over 313 own stores and 682 franchises.

6

Page 7: 10 Operations Decisions 1. How the 10 operations decisions below are applied in Mango? Goods & service design Quality Process & capacity design Location

Layout designMANGO is characterised by offering fashion for the young, modern

and urban woman. It has its own design which adopts the latest fashion tendences and is presented in 3 differentiated lines: Casual Sport Suit Jeans

Furthermore, all the lines in MANGO collection can be combined with different accessories like shoes, bags, belts, costume jewellery and other products which are made by MANGO

7

Page 8: 10 Operations Decisions 1. How the 10 operations decisions below are applied in Mango? Goods & service design Quality Process & capacity design Location

Layout design: logo

2005

20062007

8

Page 9: 10 Operations Decisions 1. How the 10 operations decisions below are applied in Mango? Goods & service design Quality Process & capacity design Location

Human resource and job design

• Conscious that Mango’s greatest asset is its people

• They want their professionals to develop within the company and to take on increasing responsibility with time – they achieve greater professional and personal satisfaction as

well as greater motivation in day-to-day work

• MANGO has over 6.500 employees, 1.650 of which work at the company’s central offices in Palau-Solità i Plegamans (Barcelona)

• They have young and enthusiastic team with an average age of 30 and which is 82% female

9

Page 10: 10 Operations Decisions 1. How the 10 operations decisions below are applied in Mango? Goods & service design Quality Process & capacity design Location

Supply-chain management

• The relationship with their suppliers is a long-term one based on a system of joint planning and implementation

• Provide them with direct technical support in their manufacturing plants in every country in which Mango manufactures

• We also have permanent channels of communication with Mango’s customers through our stores and a department

• On a periodic basis suppliers visit their central offices, which enables them to maintain more direct and personal contact with each on

• Their company has specialised departments to provide support to franchisees in all management areas. – Furthermore, a team made up of our supervisors and coordinators visit

their stores on a continual basis, offering them advice on all necessary aspects.

“At the MANGO organisation we have always tried to meet the expectations of our interest

groups, by taking their concerns and initiatives on board and working together with

them.”

10

Page 11: 10 Operations Decisions 1. How the 10 operations decisions below are applied in Mango? Goods & service design Quality Process & capacity design Location

Inventory• Their main goal is that each shop have what it’s necessary in each

moment having the minimum stock.

• Everyday, information is processed and then they replace clothes or make goods trades between their shops.

• Mango’s main tool is an informatic software that makes possible to manage the difficult design, purchase, manufacture, sale and post sale processes automatically ArchiCAD

11

Page 12: 10 Operations Decisions 1. How the 10 operations decisions below are applied in Mango? Goods & service design Quality Process & capacity design Location

Scheduling

• Before each season, they plan what will be sent to each store and order production based on this criterion. – If finally there is a difference with the sales forecast, the

regulation of the deliveries or exchanges between stores is carried out from our warehouse and central services.

• If there are surpluses in stores at the end of a season, these are sold with discounts and promotions.

12

Page 13: 10 Operations Decisions 1. How the 10 operations decisions below are applied in Mango? Goods & service design Quality Process & capacity design Location

Maintenance

They want to develop and implement this set of values in all of our fields of influence, both internal and external, because they believe that their responsibility extends to their entire supply chain.

Therefore, they have steadily developed instructions, policies, and action codes related to social, work and environmental aspects, all with the desire to improve and move forward.

13