Work Package 3
The main objective of this WP is to improve the knowledge of NCPs in pre-screening FP7 environment proposals
The aim is to decrease the number of out of scope of the call proposals and to improve the quality of those which are submitted
Task 3.1: Preparation of training materials◦ D3.1: Training material on proposal pre-screening (M24)
Task 3.2: Developing a tool for pre-screening proposals◦ D3.2: Pre-screening tool (M12)
Task 3.3: Feedback of using the pre-screening tool and its updates ◦ D3.3: Questionnaire to evaluate the proposal pre-
screening tool (M12)◦ D3.4: Report of the evaluation of the pre-screening tool
(after calls 2010-2013)
Aim A complete set of training materials on proposal pre-
screening for use in the WP1 training courses. Presentations will be produced and will be backed up with exercises to provide practical experiences for the NCPs being trained.
Progress so far In collaboration with the Dutch NCP, the training was
delivered at the last partner meeting in Malta. A series of presentations and exercises were
developed based on the pre-screening tool. A summary handbook/guide has been developed and
is available on the website.
Provides a background and the structure of the advice and guidance given
Show the stages of the proposal the tool can be used for
Lists the documents you should use in conjunction with the tool
Introduction to the Pre-screening Tool
Pre-screening
Shows the different types of advice/guidance and how it is presented in the tool◦ Formal Guidance◦ Common Errors◦ Good Practice◦ What the Evaluator Looks For◦ Checklist◦ Model Answers
ENV-NCP-TogetherIntroduction to EU Research Funding 8
Formal Guidance Explain the concept of your project. What are the main ideas that led you to propose this work?
Describe in detail the S&T objectives. Show how they relate to the topics addressed by the call, which you should explicitly identify. The objectives should be those achievable within the project, not through subsequent development. They should be stated in a measurable and verifiable form, including through the milestones that will be indicated under section 1.3 below.
Training Fit to Call Demonstrates how to
breakdown a topic description into the core elements
Provides an example and an exercise with answers.
Training Milestones and
Deliverables Provides an explanation
and describes how they are used in proposals
Gives examples Includes an exercise on
identifying milestones and deliverables from a mixed list
Training Impact Emphasises the importance
of this (often neglected) section
Exercise involves writing a dissemination work package for a fictitious project
Provides guidance on the areas that need to be considered.
Aim To develop and support NCPs in the activity of pre-screening proposals through a tool for all projects in FP7
The pre-screening tool will be a handbook that will provide
◦ Comments on the different sections of a proposal◦ A model response◦ Checklists that can be used to ensure all aspects of the
proposal have been addressed.
3.2: Developing a Tool for Pre-screening proposals D3.2: Pre-screening tool
Progress so far A pre-screening tool has been developed for the following types of proposals
◦ Collaborative proposals – stage 1 new◦ Collaborative proposals – stage 2 updated ◦ Collaborative proposal –stage 2, short version ◦ Coordination and Support Actions◦ Coordination and Support Actions, short version v1◦ Management guidance
3.2: Developing a Tool for Pre-screening proposals D3.2: Pre-screening tool
Collaborative proposals – stage 1
3.2: Developing a Tool for Pre-screening proposals D3.2: Pre-screening tool
3.2: Developing a Tool for Pre-screening proposals D3.2: Pre-screening tool
Collaborative proposals – stage 2
Updates include: Examples of the A forms Restructure of the financial section General Checklist
ENV-NCP-TogetherIntroduction to EU Research Funding 16
Collaborative proposals – stage 2
ENV-NCP-TogetherIntroduction to EU Research Funding 17
Collaborative proposals – stage 2
3.3: Feedback of using the pre-screening tool & its updates
D3.3: Questionnaire to evaluate the proposal pre-screening toolAim To get feedback on the pre-screening tool using a
questionnaire after the call deadline.
D3.4: Report of the evaluation of the pre-screening toolAim A report will be generated based upon the questionnaire
responses that will contain recommendations for the improvement of the pre-screening tool. The tool will then be updated in line with the report’s recommendations.
c Beta Technology
3.3: Feedback of Using the Pre-screening Tool & its Updates NCPs were asked to review the pre-screening tool
following its use on proposals for the ENV2011 call
A questionnaire was circulated and we had 9 responses (plus 1 incomplete)
Lior Ben Artzi - Gershon – ISERD, Isreal Anabela Carvalho – GPPQ, Portugal
Katerina Kari – EIC, CyprusDetelin Markov – Technical University of Sofia, Bulgaria
Paola Materia – APRE, ItalyStefanie Pietsch – FZ Jülich, Germany
JF Renault – FZ Jülich, GermanyAlain Straus – FFG, Austria
Meltem Unlu Tokcaer – TÜBİTAK, Turkey
ENV-NCP-TogetherIntroduction to EU Research Funding 20
Based on the feedback received, a number of modifications have been made to the document. These changes include:
Inclusion of contingency planning Making the financial part less objective Development of a general check-list Development of a separate tool for the two-stage
proposal process, i.e. a tool specifically for first stage proposals.
3.3: Feedback of Using the Pre-screening Tool & its Updates
Feedback on both the full length version and the short version of the pre-screening tool indicated:In general, NCPs are happy with the tools and find them useful in helping to screen proposals prior to submissionNCPs felt that the tool had improved since the first review, being more complete, with more useful information in itThe inclusion of hyperlinks make the tool more user friendly
3.3: Feedback of Using the Pre-screening Tool & its Updates
A request for feedback on the pre-screening tool will be sent out in the next couple of weeks
Please tell us what you think and how it could be improved.
Link to the questionnaire will be sent via the Xtranet