  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    1/37

    W

    aterp

    roofin

    g

    Sika Services AG

    1

    H.J. Stich, CPE waterproofing / March 2013

    Waterproofing of tunnels

    with Sikaplansheetmembranes

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    2/37

    W

    aterp

    roofin

    g

    Sika Services AG

    2

    Sikas experience in tunnel

    waterproofing with sheet membranesis more than 45 years old!

    1968

    2006

    1981

    1999

    1970

    1985

    2004

    1978

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    3/37

    W

    aterp

    roofin

    g

    Sika Services AG

    3

    Why waterproofing of tunnels?

    cracks concrete humidity

    corrosion fire

    spalling

    chlorine/

    sulphate

    mineral

    sediment

    biological

    attack

    crystallize ice ice

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    4/37

    W

    aterp

    roofin

    g

    Sika Services AG

    4

    Tunnel waterproofing =Protection of structures against

    percolating water from the outside

    Railway tunnels

    Road tunnels

    Metro tunnels

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    5/37

    W

    aterp

    roofin

    g

    Sika Services AG

    5

    Stops water at

    external surfaces,

    structure is dry,

    joint treatment

    needed (tubbing)

    Waterproof

    concrete

    Stops water at

    external surfaces,structure is dry

    (membrane)

    Waterproofing with

    located outside thestructure

    EffectsMeasurements:

    How to make a tunnel waterproof?

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    6/37

    W

    aterp

    roofin

    g

    Sika Services AG

    6

    Class 1 Class 2 Class 3 Class 4

    Completely dry Dry to

    slightly moist

    Moist Moist to wet

    No moist parts on the

    dry part of the tunnel

    surface permitted

    Single failing parts

    permitted. No dropping

    water on the dry part of the

    tunnel surface permitted

    Partly limited moisty parts

    and single dropping parts

    on the dry part of the

    tunnel surface permitted

    Moisty parts and dropping

    parts permitted

    Clean air rooms

    Dry rooms

    Energy supply rooms

    Metro stations

    (presence of people)

    Road tunnels highway

    Road tunnels in frosty

    zones

    High speed train tunnels

    Parking areas

    Regional railways

    Metro lines

    sewage tunnels

    Water infiltration in l/sqm within 24h acc. STUVA

    0 0-0.1 0.1-0.5 0.5-1.0

    How to define watertightness?

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    7/37

    W

    aterp

    roofin

    g

    Sika Services AG

    7

    Percolation waterEvacuation of Mountain Water

    Pressure waterMountain Water Displacement

    requests permanent

    drainage system

    no drainage system

    requested(except temporary dewatering during

    construction works)

    Groundwater conditions

    Influences of water below ground

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    8/37

    W

    aterp

    roofin

    g

    Sika Services AG

    8

    Mining tunnels Cut and cover tunnels

    different membrane installation methods

    Influences of water below ground

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    9/37

    W

    aterp

    roofin

    g

    Sika Services AG

    9

    Watertight all-round seal

    pressure waters

    no drainage system

    required(except temporary dewatering during

    construction works)

    two step - membrane

    installation

    Partial waterproofing

    percolating waters

    drainage systems at

    lateral waterproofing

    terminations requiredone step - membrane

    installation

    Influences of water below ground

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    10/37

    W

    aterp

    roofin

    g

    Sika Services AG

    10

    Waterproofing systems with geomembrane

    Mining tunnels

    Partial waterproofing

    arch profile

    Enclosed waterproofing

    arch profile

    Partial waterproofingPartial waterproofing

    Enclosedwat

    erproofing

    Enclosed waterproofing

    (shafting)

    Cut and cover tunnels

    Umbrellasystem

    Influences of water below ground

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    11/37

    W

    aterp

    roofin

    g

    Sika Services AG

    11

    geostatical forces

    hydrostatical

    pressure

    aggressivewater

    sintering andclogging in

    drainage system

    dynamic forces

    settlement

    upheaving forcesaggressive waters:

    - soft water with low calcium content

    - thermal springs / sources

    - sulphate water

    - chloride water and sea water

    Ground conditions

    Other influences below ground

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    12/37

    W

    aterp

    roofin

    g

    Sika Services AG

    12

    The method of excavation defines the method of waterproofing

    -the method of excavation depends on thegeological, geomechanical and economic conditions

    the method of waterproofing depends on the excavation method

    FULL-PROFILE EXCAVATION PARTIAL EXCAVATION

    Tunnel Boring Machine (TBM): membrane waterproofing not

    required in all cases (tubbings of

    waterproof concrete with EPDM-joint

    profiles)

    Roadheading

    membrane waterproofing possible

    (NAT-Method)

    Conventional excavation (blasting):

    membrane waterproofing possible

    (NAT-Method)

    Small size Tunnel Boring Machine (TBM)for pilot gallery and excavation to full

    profile:

    membrane waterproofing possible

    (NAT-Method)

    Roadheader:

    membrane waterproofing possible(NAT-Method)

    Conventional excavation (drill and blast):

    membrane waterproofing possible

    (NAT-Method)

    Method of sheet membrane

    installation system

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    13/37

    W

    aterp

    roofin

    g

    Sika Services AG

    13

    FULL-PROFILE EXCAVATION with TBMs

    Tunnel Boring Machine (TBM):

    Outer lining with Tubbings or Shotcrete

    Methods of tunnel excavation

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    14/37

    W

    aterp

    roofin

    g

    Sika Services AG

    14

    Excavation with Roadheader

    Methods of tunnel excavation

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    15/37

    W

    aterp

    roofin

    g

    Sika Services AG

    15

    Conventional Excavation (Drill and Blast)

    Methods of tunnel excavation

    16

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    16/37

    W

    aterp

    roofin

    g

    Sika Services AG

    16

    Drainage Drainage

    Build-up of layersRockShotcreteCushion layerSikaplanWP/WTwaterproofing membraneInner lining

    reinforced concrete

    Partial waterproofing with

    Sikaplansheet membranes (NATM)

    (NATM: New Austrian Tunnel Method)

    Method of sheet membrane

    installation system

    17

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    17/37

    W

    aterp

    roofin

    g

    Sika Services AG

    17

    Partial waterproofing with

    Sikaplan

    sheet membranes (NATM)

    concrete liningrock

    Sikaplan WP / WT

    sheet membrane

    cushion layer

    shotcrete

    lateral drainage

    (NATM: New Austrian Tunnel Method)

    Method of sheet membrane

    installation system

    18

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    18/37

    W

    aterp

    roofin

    g

    Sika Services AG

    18

    Partial waterproofing withSikaplansheet membranes (NATM)

    rock

    shotcrete

    cushion / drainage layer

    Sikaplan WP / WT sheet membrane

    concrete lining

    lateral drainage

    Method of sheet membrane

    installation system

    19

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    19/37

    W

    aterp

    roofin

    g

    Sika Services AG

    19

    For:

    -Pression galleries

    -Tunnels below groundwater

    -Vertical shaftsBuild-up of layers

    Rock

    Shotcrete

    Cushion layer

    SikaplanWP/WT waterproofing

    membrane, mechanically fixed

    Inner lining

    reinforced concrete

    Fully enclosed waterproofing with

    Sikaplansheet membranes (NATM)

    Method of sheet membrane

    installation system

    20

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    20/37

    W

    aterp

    roofin

    g

    Sika Services AG

    20

    concrete lining

    rock

    compartment with

    Sika waterbar

    control- / injection pipes

    Sikaplan WP / WT

    sheet membrane

    cushion layer

    shotcrete / gap filler

    temporary drainage

    Fully enclosed waterproofing with

    Sikaplan

    sheet membranes (NATM)

    Method of sheet membrane

    installation system

    21

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    21/37

    W

    aterp

    roofin

    g

    Sika Services AG

    21

    concrete lining

    rock

    compartment with

    waterbars and membraneSikaplanWT, embossed

    SikaplanWP / WT

    sheet membrane

    cushion layer

    shotcrete / gap filler

    temporary drainage

    Fully enclosed waterproofing with

    Sikaplan

    sheet membranes (NATM)

    Method of sheet membrane

    installation system

    22

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    22/37

    W

    aterp

    roofin

    g

    Sika Services AG

    22

    concrete lining

    rock

    Sikaplan WP / WT

    sheet membrane

    cushion layer

    shotcrete / gap filler

    temporary drainage

    Fully enclosed waterproofing with

    Sikaplan

    sheet membranes (NATM)

    Method of sheet membrane

    installation system

    23

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    23/37

    W

    aterp

    roofin

    g

    Sika Services AG

    23

    concrete lining

    rock

    compartment with

    Sika waterbar

    control- / injection pipes

    Sikaplan WP / WT

    sheet membrane

    cushion layer

    shotcrete / gap filler

    Fully enclosed waterproofing with

    Sikaplan

    sheet membranes (NATM)

    Method of sheet membrane

    installation system

    24

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    24/37

    W

    aterp

    roofin

    g

    Sika Services AG

    24

    rock

    shotcrete / gap filler

    concrete lining

    compartment with

    waterbars and membraneSikaplanWT, embossed

    SikaplanWP / WT

    sheet membrane

    control- / injection pipe

    geomat spacer

    cushion layer

    Fully enclosed waterproofing with

    Sikaplan

    sheet membranes (NATM)

    Method of sheet membrane

    installation system

    25

    f

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    25/37

    W

    aterp

    roofin

    g

    Sika Services AG

    round shaped rectangular shaped

    low overburdenhigh overburden

    Cut and cover tunnels

    different membrane installation methods

    Method of sheet membrane

    installation system

    26

    M h d f h b

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    26/37

    W

    aterp

    roofin

    g

    Sika Services AG

    Tunnels in open excavation

    Tunnels in open cut shafting

    Tunnels in open cut tanking

    Tunnels in shafting / mining

    Cut and cover tunnels

    Method of sheet membrane

    installation system

    27

    M th d f h t b

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    27/37

    W

    aterp

    roofin

    g

    Sika Services AG

    Drainage Drainage

    Build-up of layers:BackfillingProtection layersCushion layersSikaplanWP/WT membranes

    Reinforced concrete

    loose laid

    Cushion layers

    Partial waterproofing with

    Sikaplansheet membranes (cut-and cover)

    Method of sheet membrane

    installation system

    28

    M th d f h t b

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    28/37

    W

    aterp

    roofin

    g

    Sika Services AG

    Drainage

    Protection layer Geotextiles

    500g/m2

    Sikaplan

    waterproofing

    membrane,

    loosely laid

    Concrete structureGeotextiles

    500g/m2

    Backfilling

    Sikaplan

    waterproofing membrane

    protection strip

    Sikaplan

    waterproofing membrane

    protection strip

    Partial waterproofing with

    Sikaplansheet membranes (cut-and cover)

    Method of sheet membrane

    installation system

    29

    M th d f h t b

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    29/37

    W

    aterp

    roofin

    g

    Sika Services AG

    Prov. fixing

    Protection-/levelling mortar screedLean concrete

    Build-up of layers (walls and roof):BackfillingProtection layers

    Reinforced concretemembrane loose laid

    Cushion layerSikaplanwaterproofing

    Build-up of layers (bottom slab):Reinforced concreteProtection layersCushion layer

    membrane loose laidSikaplanwaterproofing

    Cushion layer

    Fully enclosed waterproofing with

    Sikaplan

    sheet membranes (cut-and cover)

    Method of sheet membrane

    installation system

    30

    M th d f h t b

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    30/37

    W

    aterp

    roofin

    g

    Sika Services AG

    Fully enclosed waterproofing with

    Sikaplansheet membranes (cut-and cover)

    Method of sheet membrane

    installation system

    31

    M th d f h t b

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    31/37

    Waterp

    roofin

    g

    Sika Services AG

    Protection layerGeotextiles500g/m2

    Geotextile 500g/m2

    Sikaplan

    waterproofing membrane,

    loosely laid Concrete structure

    Protection-,levelling

    mortar 5 - 10cm

    Lean concrete

    Fully enclosed waterproofing with

    Sikaplansheet membranes (cut-and cover)

    Method of sheet membrane

    installation system

    32

    M th d f h t b

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    32/37

    Waterp

    roofin

    g

    Sika Services AG

    Partial waterproofing with

    Sikaplan

    sheet membranes for cut- & cover tunnels

    Method of sheet membrane

    installation system

    33

    M th d f h t b

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    33/37

    Waterp

    roofin

    g

    Sika Services AG

    Drainage Drainage

    Build-up of layers:BackfillingProtection layersCushion layersSikaplanwaterproofing

    Reinforced concrete

    membrane, loosely laidCushion layers

    Partial enclosed waterproofing with

    Sikaplansheet membranes (cut-and cover)

    Method of sheet membrane

    installation system

    34

    M th d f h t b

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    34/37

    Waterp

    roofin

    g

    Sika Services AG

    Drainage

    Backfilling

    Protection layer Geotextiles

    500g/m2

    Sikaplan

    waterproofing

    membrane,

    loosely laid

    Concrete structureGeotextiles

    500g/m2

    Partial waterproofing with

    Sikaplansheet membranes (cut-and cover)

    Method of sheet membrane

    installation system

    35

    Method of sheet membrane

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    35/37

    Waterp

    roofin

    g

    Sika Services AG

    Fully enclosed waterproofing with

    Sikaplan

    sheet membranes (cut-and cover)

    Method of sheet membrane

    installation system

    36

    Method of sheet membrane

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    36/37

    Waterp

    roofin

    g

    Sika Services AG

    Prayer seam

    Build-up of layers:BackfillingProtection layerCushion layerSikaplanwaterproofing

    Reinforced concrete

    membrane, loosely laidCushion layer

    Build-up of layers: bottom slab:Protection levelling mortar screedCushion layer

    Sikaplan

    waterproofing

    Reinforced concrete

    membrane, loosely laidProtection layer

    Prayer seam

    Fully enclosed waterproofing with

    Sikaplansheet membranes (cut-and cover)

    Method of sheet membrane

    installation system

    37

    Method of sheet membrane

  • 7/23/2019 1-Waterproofing Membrane-system Tunnel MS March2013

    37/37

    Waterp

    roofin

    g

    Sik S i AG

    Prayer seam

    Protection layer

    Geotextiles 500g/m2

    Sikaplan

    waterproofing membrane,

    loosely laid

    Geotextiles 500g/m2

    Concrete structure

    Protection layer

    Ev. geotextile 500g/m2Sikaplan waterproofing

    membranes, loosely laidEv. geotextile 500g/m2

    Protection layerLean concrete

    Backfilling

    Fully enclosed waterproofing with

    Sikaplansheet membranes (cut-and cover)

    Method of sheet membrane

    installation system