Page 1: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

1

The Replanting of Lochaber Hydro Power Station

by Andrew Thick

Page 2: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

2

Topics to be covered today

• Scheme modelling;

• Operating capability of Lochaber;

• Turbine selection;

• Penstock works.

Page 3: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

3

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows

Gravity Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 4: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

4

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows

Gravity Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 5: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

5

Spey Dam

Page 6: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

6

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows

Gravity Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 7: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

7

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows

Gravity Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 8: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

8

Laggan Dam

Page 9: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

9

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows

Gravity Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 10: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

10

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows

Gravity Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 11: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

11

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows

Gravity Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 12: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

12

Loch Treig and Dam

Page 13: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

13

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows

Gravity Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 14: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

14

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows

Gravity Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 15: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

15

Schematic of the Lochaber Scheme

Loch Laggan & reservoir

Loch Treig

SpillSpill

Gravity Inflows

Gravity Inflows

Power-house

Tailrace

Spill

Surge Chamber

LochLinnhe

Spey reservoir

Penstocks

tunneltunnel

tunnel

Page 16: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

16

Penstocks, Powerhouse and Smelter

Page 17: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

17

Simplified Lochaber Scheme Model

QTspill

QP/H

QTin

Laggan

QTin

QTunnel

Treig

QLspill

QLin

QLin

QLin

Qintakes

Qintakes

Gravity Intake Flows are combined with Reservoir Inflows

Page 18: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

18

Energy Modelling Results

Trial 1 2 3 4 5 6 7

Installed Cap. (MW) 65 80 60 70 80 90 100

Overall Efficiency (%) 75 87 87 87 87 87 87

Headloss Coeff. (k) 0.021 0.0172 0.0172 0.0172 0.0172 0.0172 0.0172

Operating rule Ext Ext Max E Max E Max E Max E Max E

Laggan Spill (mcm) 2,034 1,794 4,160 1,709 1,227 1,074 801

Treig Spill (mcm) 154 121 857 201 54 10 7

Ave. Energy (GWh/yr) 467 569 523 574 581 583 580

Page 19: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

19

Scheme Operating Capability Diagram

9.3 % Q90.7 % Q

Average Operation

0 % Q100 % Q

No Gravity Inflows

100 % Q0 % Q

Max. Gravity Inflows

Page 20: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

20

Operating Capability in terms of Loch Treig Level

Note: 90.7% of water from Loch Treig9.3% of water from gravity intakes

Page 21: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

21

Scheme Operating Capability Diagram

9.3 % Q90.7 % Q

Average Operation

0 % Q100 % Q

No Gravity Inflows

100 % Q0 % Q

Max. Gravity Inflows

Page 22: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

22

Operating Capability in terms of Surge Shaft Water Level

Penstock Limitation

Note: 90.7% of water from Loch Treig9.3% of water from gravity intakes

Page 23: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

23

Scheme Operating Capability Diagram

9.3 % Q90.7 % Q

Average Operation

0 % Q100 % Q

No Gravity Inflows

100 % Q0 % Q

Max. Gravity Inflows

Page 24: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

24

Note: All water from Loch Treig

Operating Capability in terms of Surge Shaft Water Level

Page 25: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

25

Scheme Operating Capability Diagram

9.3 % Q90.7 % Q

Average Operation

0 % Q100 % Q

No Gravity Inflows

100 % Q0 % Q

Max. Gravity Inflows

Page 26: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

26

Operating Capability in terms of Surge Shaft Water Level

Note: All water from gravity intakes

Page 27: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

27

Scheme Operating Capability Diagram

9.3 % Q90.7 % Q

Average Operation

0 % Q100 % Q

No Gravity Inflows

100 % Q0 % Q

Max. Gravity Inflows

Page 28: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

28

Example Operation exceeding Penstock Pressure Rise Limit

Page 29: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

29

Turbine Selection

The steps towards to turbine selection were:

• Analysis of historical data of scheme operation

• The number of generating units was selected – 5

• Analysis of operating data from scheme model

• Performance data from tendering suppliers was fed into the scheme model

Page 30: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

30

Scheme Operation Frequency Plot

Page 31: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

31

Turbine Selection

The steps towards to turbine selection were:

• Analysis of historical data of scheme operation

• The number of generating units was selected – 5

• Analysis of operating data from scheme model

• Performance data from tendering suppliers was fed into the scheme model

Page 32: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

32

Page 33: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

33

Turbine Selection

The steps towards to turbine selection were:

• Analysis of historical data of scheme operation

• The number of generating units was selected – 5

• Analysis of operating data from scheme model

• Performance data from tendering suppliers was fed into the scheme model

Page 34: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

34

Page 35: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

35

Turbine Selection

The steps towards to turbine selection were:

• Analysis of historical data of scheme operation

• The number of generating units was selected – 5

• Analysis of operating data from scheme model

• Performance data from tendering suppliers was fed into the scheme model

Page 36: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

36

Page 37: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

37

Penstock works

Key aspects of the penstock works were:

• Need to undertake the works minimising shutdown of generation.

• Existing penstock system was very complex.

• In order to maintain double isolation, the penstocks needed to be dewatered sequentially.

• The works were complex with poor access.

• Decision with RTA to laser scan the penstock system and create a 3-D model.

Page 38: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

38

Multiple buspipes

Numerous Valves

Bifurcations

Page 39: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

39

Penstock Area – difficult terrain!

Page 40: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

40

Penstock works

Key aspects of the penstock works were:

• Need to undertake the works minimising shutdown of generation.

• Existing penstock system was very complex.

• In order to maintain double isolation for the penstocks needed to be dewatered sequentially.

• The works were complex with poor access.

• Decision with RTA to laser scan the penstock system and create a 3-D model.

Page 41: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

41

Survey Point Cloud Data

Page 42: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

42

AutoCAD 3-D Model

Page 43: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

43

Project Summary

• The generating plant has been replaced to give 25+ years life extension.

• The water to wire efficiency has been improved from 75% to 90+%.

• Energy production increased from 460 GWh/yr to 600+ GWh/yr.

• The scheme’s capability is better understood and limitations identified.

• The scheme was completed ahead of schedule and is operating successfully with minimal disruption to Smelter operations during construction

Page 44: 1 The Replanting of Lochaber Hydro Power Station by Andrew Thick

Contact Details

Andrew Thick BEng CEng MIMechE

URS Infrastructure and Environment UK Limited

International House, Dover Place

Ashford

Kent TN23 1HU

United Kingdom

Tel: +44 (0) 1233 658200

[email protected]

Thank you for your kind attention