1 the italian “national rural network” workshop on successful work of managing authorities...
DESCRIPTION
3 Italian Programming system Need for strategy and governance Regions RDP programming within national strategy (NSP) In some Regions: Provinces are entitled to set some programming choices (delegation of competences) within Regional strategy (RDP) Subsidiarity in the implementation How RDP measures have to be implemented ? Starting from the administrative level closer to the farmer (21 Regions; in some cases Provinces) The use of T.A (human resources and training) supports such approachTRANSCRIPT
![Page 1: 1 The Italian “National Rural Network” Workshop on Successful Work of Managing Authorities Budapest – 15th April 2008 Riccardo Passero](https://reader035.vdocuments.mx/reader035/viewer/2022081521/5a4d1b3d7f8b9ab05999f311/html5/thumbnails/1.jpg)
1
The Italian “National Rural Network”
Workshop on Successful Work of Managing Authorities
Budapest – 15th April 2008
Riccardo Passero
![Page 2: 1 The Italian “National Rural Network” Workshop on Successful Work of Managing Authorities Budapest – 15th April 2008 Riccardo Passero](https://reader035.vdocuments.mx/reader035/viewer/2022081521/5a4d1b3d7f8b9ab05999f311/html5/thumbnails/2.jpg)
2
In this presentation:
2007 – 2013 programming period
The role of Italian National Rural Network (financed within 4 % Technical Assistance; art 66 EC Reg. 1698/2005)
![Page 3: 1 The Italian “National Rural Network” Workshop on Successful Work of Managing Authorities Budapest – 15th April 2008 Riccardo Passero](https://reader035.vdocuments.mx/reader035/viewer/2022081521/5a4d1b3d7f8b9ab05999f311/html5/thumbnails/3.jpg)
3
Italian Programming system
Need for strategy and governance
Regions RDP programming within national strategy (NSP)
In some Regions: Provinces are entitled to set some programming choices (delegation of competences) within Regional strategy (RDP)
Subsidiarity in the implementation
How RDP measures have to be implemented ?
Starting from the administrative level closer to the farmer (21 Regions; in some cases Provinces) The use of T.A (human resources and training) supports such approach
![Page 4: 1 The Italian “National Rural Network” Workshop on Successful Work of Managing Authorities Budapest – 15th April 2008 Riccardo Passero](https://reader035.vdocuments.mx/reader035/viewer/2022081521/5a4d1b3d7f8b9ab05999f311/html5/thumbnails/4.jpg)
4
Italian Programming system 1 national strategy (Ministry) NSP 21 RDPs managed by
Regions
Further decentralization in some Regions, i.e: Tuscany Emilia Romagna Lombardy Campania
Involvement of local authorities (Provinces; Mountain Communities)
RDP programming possibility to add “second class” priorities to Regional “first class priorities” set in RDPs
Implementation of some RDP measures (depending from delegated competences at Regional level)
• Concerning 2000-2006 RDPs management, Italy experienced 100% financial efficiency on resources allocated on whole programming period (4.624 Billions of Euro).
![Page 5: 1 The Italian “National Rural Network” Workshop on Successful Work of Managing Authorities Budapest – 15th April 2008 Riccardo Passero](https://reader035.vdocuments.mx/reader035/viewer/2022081521/5a4d1b3d7f8b9ab05999f311/html5/thumbnails/5.jpg)
5
2121 Rural Development Rural Development Programmes Programmes 11 National Programme RURAL NETWORKNational Programme RURAL NETWORK
1616 RDP « Competitiveness»: 4,110RDP « Competitiveness»: 4,110 Billions of €Billions of € 55 PSR « Convergence »:PSR « Convergence »: 4,141 4,141 Billions of €Billions of € 11 National Rural Network: 0,041 Billions of €National Rural Network: 0,041 Billions of €
______________________________Total EAFRD quotaTotal EAFRD quota 8,2928,292 Billions of €Billions of €
National Resources National Resources 8,3958,395 Billions of € Billions of € (*)(*)
______________________________ Total resources 16,68716,687 Billions of €Billions of €
(*)(*) of which 1,487 of which 1,487 Billions ofBillions of € (8,9% of the total) come € (8,9% of the total) come from REGIONAL RESOURCESfrom REGIONAL RESOURCES
The 2007 – 2013 scenarioThe 2007 – 2013 scenario
CompetitivenessCompetitiveness
ConvergenceConvergence
Phasing outPhasing out
Phasing inPhasing in
NATIONAL balance among axis (21 RDPs)
Axis 1: 39,0% Axis 2: 43,2% Axis 3: 14,7% Leader 6,7% Technical Assistance: 3,1% (of which National Network 0,5%)
![Page 6: 1 The Italian “National Rural Network” Workshop on Successful Work of Managing Authorities Budapest – 15th April 2008 Riccardo Passero](https://reader035.vdocuments.mx/reader035/viewer/2022081521/5a4d1b3d7f8b9ab05999f311/html5/thumbnails/6.jpg)
6
Resources allocation per axis in Italian RDPs
![Page 7: 1 The Italian “National Rural Network” Workshop on Successful Work of Managing Authorities Budapest – 15th April 2008 Riccardo Passero](https://reader035.vdocuments.mx/reader035/viewer/2022081521/5a4d1b3d7f8b9ab05999f311/html5/thumbnails/7.jpg)
7
NATIONAL RURAL NETWORK 2007 - 2013
• Art 67 EC Reg. 1698/2005 establishes the European Rural Network • Art 68 EC Reg. 1698/2005 establishes National Rural Networks • Art 66 (3 par) : MS with regionalized programming system NRN as
a single Programme
ITALIAN NATIONAL RURAL NETWORK good timing
Decision of Approval C(2007) n. 3824, 14th August 2007
BEFORE ALL ITALIAN RDPs ability to start activities in 2008
FIRST “NRN Programme” approval in EU
BUDGET 83 millions of EURO (50% EAFRD)
![Page 8: 1 The Italian “National Rural Network” Workshop on Successful Work of Managing Authorities Budapest – 15th April 2008 Riccardo Passero](https://reader035.vdocuments.mx/reader035/viewer/2022081521/5a4d1b3d7f8b9ab05999f311/html5/thumbnails/8.jpg)
8
NATIONAL RURAL NETWORK 2007 - 2013
• Programme (Decision of Approval C(2007) n. 3824, 14th August 2007)
• Action Plan (implementing document for 2007 – 2013) approved by Monitoring Committee on March 2008
• Annual Plans (list of activities for the year; related organization, implementation and costs)
![Page 9: 1 The Italian “National Rural Network” Workshop on Successful Work of Managing Authorities Budapest – 15th April 2008 Riccardo Passero](https://reader035.vdocuments.mx/reader035/viewer/2022081521/5a4d1b3d7f8b9ab05999f311/html5/thumbnails/9.jpg)
9
NATIONAL RURAL NETWORK 2007 - 2013• NRN Key element of national policy defined in NATIONAL STRATEGIC
PLAN (NSP)
MAIN CHALLENGES
• Widening the participation in Rural development Policies (RDPs address and NRN activities)
• Overcoming national differences ( human resources’ skills, RDP management, procedures, monitoring & evaluation)
• International dimension (exchange of experiences, good practises, innovations)
NRN ADDED VALUE
TO ENHANCE NSP and RDP : PERFORMACES, IMPACTS, FINANCIAL EFFICIENCY (N+2) rule, INTEGRATION AMONG POLICIES
Better Knowledge and Visibility of Rural Development Policies’ role and
impacts
![Page 10: 1 The Italian “National Rural Network” Workshop on Successful Work of Managing Authorities Budapest – 15th April 2008 Riccardo Passero](https://reader035.vdocuments.mx/reader035/viewer/2022081521/5a4d1b3d7f8b9ab05999f311/html5/thumbnails/10.jpg)
10
NATIONAL RURAL NETWORK 2007 - 2013WHICH MEMBERS ?
OPEN and INCLUSIVE approach
• According to art. 68 (1) National Partners:
– ALL administrations engaged in RD (national, regional, GAL, etc.)
– ALL organizations engaged in RD (professional, environmental, technical, cultural, chambers of industry-commerce, cooperatives, other networks; NGO’s)
• European Rural Network and every relevant international partners (international organizations, Think Thanks, NGO’s, other NRN)
• LIST of 15 Networks having a role to play in rural areas (i.e Consumers, Universities, Euro Info Centres, National contact points of VI-
VII° EU Research Programme, European Business and Innovations Centres (BIC), Interact, EUROPE DIRECT centres, etc…. )
![Page 11: 1 The Italian “National Rural Network” Workshop on Successful Work of Managing Authorities Budapest – 15th April 2008 Riccardo Passero](https://reader035.vdocuments.mx/reader035/viewer/2022081521/5a4d1b3d7f8b9ab05999f311/html5/thumbnails/11.jpg)
11
HOW TO MAKE NRN? INCLUDING “Key actors” as NRN MEMBERS and organizing the
competences they can give participation to NRN activities through THEMATIC TASK FORCES
THEMATIC WORKING GROUPS set by Italian NRN: LEADER Approach, MONITORING and EVALUATION FARM COMPETITIVENESS ENVIRONMENT and CROSS COMPLIANCE (soil, water resources, climatic
changes, agro-energies, biodiversity) FORESTS LANDSCAPE CHANGE, INTEGRATED PROGRAMMING (among measures, food chains) INTEGRATION among RD and OTHER POLICIES YOUNG FARMERS and equal opportunities
INTEGRATING NRN with other NETWORKS (national / international; official and not) IN ORDER TO EXPAND NRN activity results
![Page 12: 1 The Italian “National Rural Network” Workshop on Successful Work of Managing Authorities Budapest – 15th April 2008 Riccardo Passero](https://reader035.vdocuments.mx/reader035/viewer/2022081521/5a4d1b3d7f8b9ab05999f311/html5/thumbnails/12.jpg)
12
NRN members: formal institution
Art. 41 (4) EC Reg. 1974/2006 : 31/12/2008 deadline for establishing the Network
National procedure: through NATIONAL STANDING FORUM (action 1.2.1) formal Ministry Act (related publicity)
Possibility to widen this list at Regional Level (Regions can formally identify further members, relevant at regional level, by 31/12/2008)
Open approach: other / further members can be part of NRN
“Ministry” ad “National Unit for Animation and Coordination” classify such members in thematic tasks forces in order to provide bestefficiency in action implementation
![Page 13: 1 The Italian “National Rural Network” Workshop on Successful Work of Managing Authorities Budapest – 15th April 2008 Riccardo Passero](https://reader035.vdocuments.mx/reader035/viewer/2022081521/5a4d1b3d7f8b9ab05999f311/html5/thumbnails/13.jpg)
13
Italian NRN organization
Strutture della Rete Rurale Europea e della Rete rurale nazionale
EU Rural NetworkCoordinationCommittee
LeaderSub-committee
Evaluation expertcommittee
Thematic workinggroup
EU Rural NetworkCoordinationCommittee
LeaderSub-committee
Evaluation expertcommittee
Thematic workinggroup
Gestione & CoordinamentoUNAC
Task forcetematiche
Task forceRete Leader
Task forceMonit&Valutazione
Gestione & CoordinamentoUNAC
Task forcetematiche
Task forceRete Leader
Task forceMonit&Valutazione
![Page 14: 1 The Italian “National Rural Network” Workshop on Successful Work of Managing Authorities Budapest – 15th April 2008 Riccardo Passero](https://reader035.vdocuments.mx/reader035/viewer/2022081521/5a4d1b3d7f8b9ab05999f311/html5/thumbnails/14.jpg)
14
Italian NRN organization
Unità di Gestione & Coordinamento
TFTTemi strategici
& Supporto ai PSR
Ambiente &Condizionalità
Unità di supporto orizzontale
Task forceRete Leader
Task forceMonitoraggio & Valutazione
Segreteria tecnica del“Tavolo permanente di partenariato” e
dello “Osservatorio interregionalesull’evoluzione delle zone rurali”
Staff Comunicazione ed organizzazione Eventi
StaffLegale
StaffSegreteria
Staff Traduzioni & interpretariato
Foreste
Paesaggio
Integrazione fraSR e altre politiche
Giovani
Pari opportunità
Progettazione Integrata e di filiera
Competitività
Risorse idriche
Suolo
Cambiamenti climatici
Bioenergie
Biodiversità
StaffSistemi informativi
TFTCooperazione
TFTBuone pratiche& Innovazioni
Unità di Gestione & Coordinamento
TFTTemi strategici
& Supporto ai PSR
Ambiente &Condizionalità
Unità di supporto orizzontale
Task forceRete Leader
Task forceMonitoraggio & Valutazione
Segreteria tecnica del“Tavolo permanente di partenariato” e
dello “Osservatorio interregionalesull’evoluzione delle zone rurali”
Staff Comunicazione ed organizzazione Eventi
StaffLegale
StaffSegreteria
Staff Traduzioni & interpretariato
Foreste
Paesaggio
Integrazione fraSR e altre politiche
Giovani
Pari opportunità
Progettazione Integrata e di filiera
Competitività
Risorse idriche
Suolo
Cambiamenti climatici
Bioenergie
Biodiversità
StaffSistemi informativi
TFTCooperazione
TFTBuone pratiche& Innovazioni
Organizzazione UNAC – Rete rurale nazionale
![Page 15: 1 The Italian “National Rural Network” Workshop on Successful Work of Managing Authorities Budapest – 15th April 2008 Riccardo Passero](https://reader035.vdocuments.mx/reader035/viewer/2022081521/5a4d1b3d7f8b9ab05999f311/html5/thumbnails/15.jpg)
15
Italian NRN organization
![Page 16: 1 The Italian “National Rural Network” Workshop on Successful Work of Managing Authorities Budapest – 15th April 2008 Riccardo Passero](https://reader035.vdocuments.mx/reader035/viewer/2022081521/5a4d1b3d7f8b9ab05999f311/html5/thumbnails/16.jpg)
16
Italian NRN organization The Regional Sites
Independence and demarcation from proper RDP Technical Assistance (concerning activities and human resources) BUT strong coordination with RDP Managing Authorities
Regional Sites have to implement at least art 68 mandatory actions and national strategic actions (targeting NSP objectives)
Free choice in implementing actions at requests (R) Bilateral agreements Ministry – Regions on Regional sites organization in terms of human resources and structures involved (3 options: full; partial; minimal implementation of Regional Sites)
![Page 17: 1 The Italian “National Rural Network” Workshop on Successful Work of Managing Authorities Budapest – 15th April 2008 Riccardo Passero](https://reader035.vdocuments.mx/reader035/viewer/2022081521/5a4d1b3d7f8b9ab05999f311/html5/thumbnails/17.jpg)
17
Human resources involved in NRN activities
• Ministry and Regional officials: involved in specific activities (TTF)
• Human resources coming from Ministry’s Technical Assistance Institutes
• For specific know-how further national and international human resources
• Outsourcing of some actions or activities (calls) : when special support is needed
![Page 18: 1 The Italian “National Rural Network” Workshop on Successful Work of Managing Authorities Budapest – 15th April 2008 Riccardo Passero](https://reader035.vdocuments.mx/reader035/viewer/2022081521/5a4d1b3d7f8b9ab05999f311/html5/thumbnails/18.jpg)
18
NATIONAL RURAL NETWORK 2007 - 2013 Art. 68 EC Reg. 1698/2005 + Art 41 EC Reg. 1974/2006
Mandatory elements of the Network(a) structures needed to run the network (max. 25% art 41 EC Reg. 1974/2006);(b) action plan containing at least : • identification and analysis of good transferable practices and the provision of
information about them, • network management, • the organisation of exchanges of experience and know-how, • the preparation of training programmes for local action groups in the process of
formation, • technical assistance for inter-territorial and transnational cooperation.
ITALIAN NRN ACTION PLAN
MANDATORY ACTIONS + further ACTIONS necessary for fully reaching the 3 global objectives and National Strategic Plan targets
Some actions are at Regional Request (R)
![Page 19: 1 The Italian “National Rural Network” Workshop on Successful Work of Managing Authorities Budapest – 15th April 2008 Riccardo Passero](https://reader035.vdocuments.mx/reader035/viewer/2022081521/5a4d1b3d7f8b9ab05999f311/html5/thumbnails/19.jpg)
19
NATIONAL RURAL NETWORK 2007 - 2013
3 GLOBAL OBJECTIVES
1) IMPROVEMENT OF GOVERNANCE 2) STRENGTHENING OF THE MANAGERIAL
AND PLANNING CAPACITIES3) DIFFUSION OF GOOD PRACTISES AND
KNOWLEDGE
![Page 20: 1 The Italian “National Rural Network” Workshop on Successful Work of Managing Authorities Budapest – 15th April 2008 Riccardo Passero](https://reader035.vdocuments.mx/reader035/viewer/2022081521/5a4d1b3d7f8b9ab05999f311/html5/thumbnails/20.jpg)
20
NRN ACTIONS
1) IMPROVEMENT OF GOVERNANCE
1.1.1 Horizontal support to Administrations engaged in the Rural Development Programme implementation
1.1.2 Support to the establishment of the “National monitoring and evaluation system”
1.2.1 A national standing forum on partnership
1.2.2 Inter-regional workshops for development (R)
![Page 21: 1 The Italian “National Rural Network” Workshop on Successful Work of Managing Authorities Budapest – 15th April 2008 Riccardo Passero](https://reader035.vdocuments.mx/reader035/viewer/2022081521/5a4d1b3d7f8b9ab05999f311/html5/thumbnails/21.jpg)
21
NRN ACTIONS2) STRENGTHENING OF THE MANAGERIAL AND
PLANNING CAPACITIES
2.1.1 Preparation of training programmes for Local Action Groups in the process of formation
2.1.2 Organisation of exchanges of experience and know-how
2.1.3 Workshops on pilot ideas and integrated projects (R)
2.2.1 Technical assistance to inter-territorial and trans-national cooperation
2.2.2 Technical assistance to cooperation among institutions (R)
![Page 22: 1 The Italian “National Rural Network” Workshop on Successful Work of Managing Authorities Budapest – 15th April 2008 Riccardo Passero](https://reader035.vdocuments.mx/reader035/viewer/2022081521/5a4d1b3d7f8b9ab05999f311/html5/thumbnails/22.jpg)
22
NRN ACTIONS3) DIFFUSION OF GOOD PRACTISES AND KNOWLEDGE
3.1.1 Identification and analysis of transferable good practices/innovations and relevant information
3.1.2 Transfer of good practices and innovations and relevant placement into different contexts (R)
3.2.1 Supporting the promotion of services in favour of farmers (some actions R)
3.2.2 Information on contents and results achieved by CAP and Rural Development Policies
![Page 23: 1 The Italian “National Rural Network” Workshop on Successful Work of Managing Authorities Budapest – 15th April 2008 Riccardo Passero](https://reader035.vdocuments.mx/reader035/viewer/2022081521/5a4d1b3d7f8b9ab05999f311/html5/thumbnails/23.jpg)
23
NRN ACTIONSNETWORK MANAGEMENT (12,6%)
4.1.1 Implementation, management and operation of Network’s structures
4.1.2 Network’s Communication Plan and publicity of interventions
4.1.3 Monitoring and evaluation of the Network
![Page 24: 1 The Italian “National Rural Network” Workshop on Successful Work of Managing Authorities Budapest – 15th April 2008 Riccardo Passero](https://reader035.vdocuments.mx/reader035/viewer/2022081521/5a4d1b3d7f8b9ab05999f311/html5/thumbnails/24.jpg)
24
NRN FINANCIAL PLAN
anno 2007 anno 2008 anno 2009 anno 2010 anno 2011 anno 2012 anno 2013 Totale2007 - 2013 %
I linea di intervento 1 7.052.867,55 7.014.312,25 6.803.443,35 6.909.606,17 6.841.423,17 6.815.605,31 6.764.002,15 48.201.259,95 58,13II linea di intervento 2 1.514.188,66 1.505.911,18 1.460.639,48 1.483.431,71 1.468.793,41 1.463.250,55 1.452.171,80 10.348.386,79 12,48III linea di intervento 3 2.033.477,72 2.022.361,49 1.961.563,92 1.992.172,71 1.972.514,23 1.965.070,45 1.950.192,26 13.897.352,78 16,76IV linea di intervento 4 1.532.388,04 1.524.011,07 1.478.195,24 1.501.261,41 1.486.447,18 1.480.837,69 1.469.625,79 10.472.766,42 12,63
12.132.921,97 12.066.595,99 11.703.841,99 11.886.472,00 11.769.177,99 11.724.764,00 11.635.992,00 82.919.765,94 100,00 6.066.460,99 6.033.298,00 5.851.921,00 5.943.236,00 5.884.589,00 5.862.382,00 5.817.996,00 41.459.882,97 50,00
5.265.688,13 5.236.902,66 5.079.467,42 5.158.728,85 5.107.823,25 5.088.547,58 5.050.020,53 35.987.178,42 43,40
Linee di intervento
Totale parziale di cui FEASR
di cui obiettivoConvergenza
![Page 25: 1 The Italian “National Rural Network” Workshop on Successful Work of Managing Authorities Budapest – 15th April 2008 Riccardo Passero](https://reader035.vdocuments.mx/reader035/viewer/2022081521/5a4d1b3d7f8b9ab05999f311/html5/thumbnails/25.jpg)
25
NATIONAL RURAL NETWORK 2007 - 2013
EU RURAL DEVELOPMENT POLICY
• MAKING EUROPEAN AGRICULTURE MORE COMPETITIVE
• SUSTAINABLE DEVELOPMENT • More DIVERSIFICATION & better QUALITY of LIFE
Interaction among National Rural Networks tool for Enhancing Rural Development Policy performances and impacts
![Page 26: 1 The Italian “National Rural Network” Workshop on Successful Work of Managing Authorities Budapest – 15th April 2008 Riccardo Passero](https://reader035.vdocuments.mx/reader035/viewer/2022081521/5a4d1b3d7f8b9ab05999f311/html5/thumbnails/26.jpg)
26
NATIONAL RURAL NETWORK 2007 - 2013WHAT THE ITALIAN RURAL MODEL CAN OFFER ?
• 21 administrative models from which it is possible to get several administrative and managing solutions;
• RDPs implementation in a wide range of “agricultural and environmental systems” possibility to transfer experiences in other contexts
• Agriculture based on “quality products”, “diversification”, “organic and integrated agriculture”, “strong cooperative association of farmers”
CONCERNING THE NETWORK (use of Technical Assistance)
“More NRN action plans in the Member States will be similar and compatible, bigger will be the effects and results of the networking activity; this will allow to create synergies for tackling common problems and improving public policies effectiveness”