Page 1: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

4

Standardizing the

Water Main Disinfection Process

Page 2: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

Why?From the Forward to AWWA Standard C651 for

Disinfecting Water Mains:

“It must be remembered that the final water quality test is not the primary means for certifying the sanitary condition of a main……..”

Page 3: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

Why? (part 2)

We needed to achieve consistency between the methods used by our contractors and our own crews.

Page 4: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

Steps for Standardizing Water Main Disinfection

at Portland Water Bureau

Assess & Upgrade Equipment Write SOP Create Field Aids Institute Record-Keeping Train Maintenance & Construction,

Operations and Inspection Workers

Page 5: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

Steps for Standardizing Water Main Disinfection

at Portland Water Bureau

Assess & Upgrade Equipment Chlorine Dosing Device High Range Chlorine Test Kit

Write SOP Create Field Aids Institute Record-Keeping Train Maintenance & Construction,

Operations and Inspection Workers

Page 6: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

Chlorine Dosing Device

Continuous feed method described in the C651 Standard

Dosatron® flow driven proportional mixing device. Mechanics wanted a better device Problems with priming the suction line Problems maintaining the correct dose.

Page 7: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

Alternate Devices Evaluated

Pumping devices vs. water powered Trailer mounted vs. suitcase vs. non-

integrated devices.

Page 8: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

And the winner is …….Dosatron, again

Page 9: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

Replaced Old Dosatron Units with New Units

We add: Protective support cage Piping Flow meter

Page 10: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

Test Kits for High Chlorine Concentrations

Ordered 5 different test kits from various manufacturers

Tried them out within Water Quality group Wrote a field instruction sheet for each one Assembled a group of employees to try them

out on samples of chlorine spiked water Voted!

Page 11: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

And the winner is……..

Page 12: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

Steps for Standardizing Water Main Disinfectionat Portland Water Bureau

Assess & Upgrade Equipment Write SOP Create Field Aids Institute Record-Keeping Train Maintenance, Construction, Operations

and Inspection Workers

Page 13: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

SOP contents

Scope Rules that govern water main disinfection General flow chart of the process Detailed information on each step of process Contact information Revision History

Page 14: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

Steps for Standardizing Water Main Disinfectionat Portland Water Bureau

Assess & Upgrade Equipment Write SOP Create Field Aids Institute Record-Keeping Train Maintenance, Construction and

Inspection Workers

Page 15: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

Field Aids

Excel Spreadsheet to calculate volume of 12% hypochlorite needed for the job.

Work flow chart Dosatron set-up instructions High range chlorine tester – short instruction

sheet

Page 16: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field
Page 17: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

DosatronNew main

in

chlorine uptakebucket

out

2. The machine should be preset to 1:500 on the adjusting screws on the bottom of the Dosatron mixers.

3. Next you need to hook up your potable hoses from the hydrant to the inlet and from the outlet to your main.

4. …….

CHLORINATION MACHINE INSTRUCTIONS

1. The first thing you need to do is attach the pressure valve and flow meter to the inlet side of the machine.

Page 18: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

Steps for Standardizing Water Main Disinfectionat Portland Water Bureau

Assess & Upgrade Equipment Write SOP Create Field Aids Institute Record-Keeping Train Maintenance, Construction and

Inspection Workers

Page 19: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

Water Main Disinfection Record, 2-sided form Side 1 Measured chlorine concentration in superchlorinated

disinfectant charged to main

Time that charge was complete (Beginning of 24 hour hold time)

Measured chlorine concentration after 24 hours

End of hold time

Chlorine residuals – system water and water at end of flush

Side 2 – coliform sample data (chlorine residual and location for each sample)

Page 20: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

Review of Water Main Disinfection Records

Check for

Beginning chlorine residual is 25-50 mg/L

Ending chlorine residual is greater than 10 mg/L

Disinfectant hold time is at least 24 hours

Water flushed from main has similar chlorine residual as system water used for flushing

Page 21: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

Because disinfection record-keeping was a new step -

One-month grace period after training.

After that coliform samples for water main disinfections were rejected if brought in without a record. (First samples only).

Records have indicated consistent chlorine dosing and (mostly) successful disinfections.

Page 22: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

Steps for Standardizing Water Main Disinfectionat Portland Water Bureau

Assess & Upgrade Equipment Write SOP Create Field Aids Institute Record-Keeping Train Maintenance, Construction, Operations

and Inspection Workers

Page 23: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

Training, (and more training) Training included PPT presentation Handouts Coliform sampling demonstration Quiz!!!!

Obtained OSEAC accreditation to provide ceu’s for training.

Repeated yearly for entire Maintenance & Construction Group, less often for Engineering Inspectors.

Page 24: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

Training also included….

Laboratory Coordination procedures

Review of BMP’s for main breaks or reduced pressure events.

Lots of photos and diagrams

Page 25: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

28

Jug of 12.5% NaOCl [Concentrated Bleach!]

Page 26: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

29

Note ratio control adjustment on the Dosatron®.

Page 27: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

30

New Main Disinfection – Step 6

to sewer

6 Drain and flush until residual chlorine reaches same level as water supply to main.

Page 28: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

31

Oops! Minimize contact with concentrated chlorine (and do not wear your favorite pants)!

Page 29: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

32

What constitutes an “Obvious Risk of Contamination?”

Complete loss of pressure in water main.

0 psi!

Page 30: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

33

OR…

simultaneous damage to adjacent water & sewer lines.

W

S

OOPS.

Page 31: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

34

Fast Track Disinfection –Step 5

5 Flush the repaired main section at 2.5 feet per second minimum until chlorine residual matches that of source water.

Sample here

Sample here

to sewer

Page 32: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

35

Collect the correct amount of sample – 100 milliliters minimum

Do not rinse out the bact. sample bottle. It contains a pre-measured chlorine neutralizer.

Collect at least 100 mL of sample. Fill bottle to ABOVE the 100 mL mark and BELOW the bottle cap.

Page 33: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

36

WARNING: Do not deliver a “hot sample” (more than 8 ppm chlorine concentration) to the lab for bacteriological testing. Doing so will cause an immediate and explosive release of chlorine gas!!

Pop!

Page 34: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

Changes to Water Main Disinfection SOP in last 5 Years

Added a note to contact Water Quality Group if system water was less than 0.5 mg/L total chlorine in project area.

Removed instruction to collect a coliform sample from system whenever a project sample shows presence of coliform bacteria since these must be counted as TCR compliance samples.

Page 35: 1. Standarizing the Water Main Disinfection Process 1... · Steps for Standardizing Water Main Disinfection at Portland Water Bureau Assess & Upgrade Equipment Write SOP Create Field

Questions???