1 space coast loop trail – 55 miles coast to coast connector st. johns river to sea loop east...

12
1 SPACE COAST LOOP TRAIL – 55 MILES Coast to Coast Connector St. Johns River to Sea Loop East Coast Greenway U.S. Department of Interior America’s Great Outdoors Indian River National Scenic Byway America’s Transportation Awards Top 10 Transportation Project 2010 Merritt Island National Wildlife Refuge Space Coast Loop Trail - Brevard County

Upload: homer-mosley

Post on 18-Dec-2015

214 views

Category:

Documents


0 download

TRANSCRIPT

1

SPACE COAST LOOP TRAIL – 55 MILES• Coast to Coast Connector• St. Johns River to Sea Loop• East Coast Greenway• U.S. Department of Interior

America’s Great Outdoors• Indian River National Scenic Byway• America’s Transportation Awards Top 10

Transportation Project 2010• Merritt Island National Wildlife Refuge• Canaveral National Seashore• NASA/Kennedy Space Center

Space Coast Loop Trail - Brevard County

2

Space Coast Loop Trail - Brevard County

St. Johns River-to-Sea Loop

3

Coast to Coast Connector - Brevard County

4

Kennedy Space Center Gap – C2C Brevard Segment 2

KENNEDY SPACE CENTER GAPPHASE: Feasibility Study complete Next phase – PD&E following federal NEPA guidelines BUDGET REQUEST: $450,000

Budgeted in 2016 work program

FEATURES: Proposed off road routeand rail with trail through

• Merritt Island National Wildlife Refuge, • Canaveral National Seashore, and • Kennedy Space Center

ISSUES: Federal funding

5

Space Coast Loop Trail – Max Brewer Bridge

MAX BREWER BRIDGE

PHASE: COMPLETEFEATURES: Connections to two regional parks

Bike/ped facilities on two sides

6

Space Coast Gap – Segment 1

DOWNTOWN CONNECTORLENGTH: 1.9 miles

PHASE: FDOT PD&EFunded FY 2014/15

BUDGET: $100,000 C2C State $

FEATURES: Connections to downtown, two regional parks, and future train station

ISSUES: Right of way constraints

7

East Central Florida Regional Rail Trail – Titusville Segment

TITUSVILLE CROSSOVER SEGMENTLENGTH: 0.6 miles

PHASE: Titusville Design/Build Funded FY 2014/15

Design 2015Construction 2016

FEATURES: Pedestrian bridge across SR 406/Garden Street

BUDGET: $3,631,000FDOT work program/Federal $

8

East Central Florida Regional Rail Trail – Titusville Segment

DRAA PARK SEGMENT

LENGTH: 1.4 miles

PHASE: COMPLETE

FEATURES: Neighborhood trail connected to

future city park with full service trailhead

9

East Central Florida Regional Rail Trail

BREVARD COUNTY RURAL/SUBURBAN SEGMENT

LENGTH: 12.8 miles

PHASE: FDOT Design/BuildFunded FY 2014/15Design 2015Construction 2016

COST: $14.3MState and Federal funding

10

East Central Florida Regional Rail Trail – Suburban Segment

SUBURBAN SEGMENTLENGTH: 7.3 miles

FEATURES:Neighborhood trailParallel but off road

CHALLENGES:Road/driveway crossingsSignage

BUDGET: $6,946,602FDOT work program/Federal $

11

East Central Florida Regional Rail Trail – Rural Segment

RURAL SEGMENTLENGTH: 5.5 miles FEATURES:Rural/wilderness trailWetlands/ecosystemsEquestrian/trailheadCHALLENGES:Emergency responseBridges/mitigationMaintenanceBUDGET: $7,356,000 C2C State $

12

Coast to Coast Connector - Brevard County

Leigh HoltMulti Modal Program ManagerCell: 321-302-5848

Katrina MorrellMulti Modal Communications Specialist

Steven BostelTransportation Analyst

Space Coast TPO2725 Judge Fran Jamieson Way, Bldg. BMelbourne, FL 32940Office: 321-690-6890www.spacecoasttpo.com

Roads to Rockets…The Sky is NOT the Limit