Soil Contamination From Lead Crystal Glass Manufacture and Acid Polishing

Tim Glews

Dudley M.B.C.

2

IntroductionMany processes operate from the same

site for a considerable periodMay have been previous industrial usesDischarge to land was common practiceMany traditional `heavy` industries have

gone, leaving large brownfield sitesDeveloper pressure to build houses on

the vacant brownfield sites

3

Royal Brierley Crystal

4

Dudley M.B.Five sites of interest

Edinburgh Crystal (Thomas Webb) Tudor Crystal Royal Doulton Crystal Royal Brierley Crystal Stuart and Sons (Waterford Crystal)

5

Contamination Sources Manufacturing

Heavy Metals (Lead and Arsenic) Particulate Matter

Acid Polishing Hydrofluoric and Sulphuric Acid Hydrogen Fluoride Deposition

6

Effect Of Contamination Heavy Metals

Lead – inhalation / ingestion

toxicity to mammals / photo toxicArsenic – inhalation / ingestion / dermis

toxic carcinogen / photo toxic - airborne / liquid discharge /solid deposit

Acid Waste - inhalation / ingestion / dermis

- toxicity to mammals / photo toxic - may enter water courses / aquifers

7

Acid Damage to steel support

8

Acid damage to steel support

9

Re-development ProcessDecommissioning the processPlanning Permission for developmentDemolition of existing buildingsSite survey and sampling procedureRemedial Work

SOURCE - PATHWAY - RECEPTOR

10

Site SurveyDesk study of site / previous usesPlan for examination and site surveyExploratory and detailed investigationAnalysis of samples for contaminantsCompare to guidance levels Review best practicable options

11

Remedial Work Options

Provide top cover Use of in ground barriers Excavation and disposal Other Options

Biological remediation Physical treatments Chemical treatments Solidification Thermal treatment

12

Case Study 1Edinburgh Crystal Plan

13

Case Study 1 Dennis Hall

14

Case Study 1 Site History and Background

1885 – 1995, L.C.G. manufacture2.3 hectares, some steep levels

Adjacent foundry,landfill site, coal mining

Demolition

Site survey details and Geology

Soil analysis and landfill gas

Site remediation

15

Case Study 2 Tudor Crystal Site

16

Case Study 2Tudor Crystal Plan

17

Case Study 2Tudor Crystal Photograph

18

Case Study 2 Site History and Background

Bounded by the Stourbridge canal

adjacent landfill site(built on)

Demolition

Site survey details and geology

Soil analysis and landfill gas

Site remediation

19

Legislation and GuidanceE.U. Directive 84/ 360/ E.E.C.

The Environmental Protection Act 1990 Part 2(a) “Waste on Land”

E.U. Directive 96/ 61/ E.C. Pollution Prevention and Control Act 1999 Pollution Prevention and Control Reg 2000

20

ConclusionsConsider current discharges to landConsider previous uses of siteCarefully examine the siteConsider commissioning full site surveyProduce a remediation planMake financial provisions to remediate

21