1 september 2007 tango meeting a.buteau icaleps 2005 status report soleil september 2007
DESCRIPTION
3 September 2007 – Tango Meeting – A.Buteau ICALEPS 2005 274h 40; 55% 11h 57; 2% 178h 08; 36% 33h 41; 7% Machine Physics Machine+BL time Beamline RadioProtection Beam statistics during July RunTRANSCRIPT
ICALEPS 20051September 2007 – Tango Meeting – A.Buteau
Status reportSOLEIL
September 2007
ICALEPS 20052September 2007 – Tango Meeting – A.Buteau
Accelerator status
• Accelerator is now in routine operation• Beam is now mainly produced for
beamlines• There is only 2 day/week for
Machine tests since last spring• We also have to face short periods of
time (about 1 week) for maintenance between runs
ICALEPS 20053September 2007 – Tango Meeting – A.Buteau
274h 40; 55% 11h 57; 2%
178h 08; 36%
33h 41; 7%
Machine Physics
Machine+BL time
Beamline
RadioProtection
Beam statistics during July Run
ICALEPS 20054September 2007 – Tango Meeting – A.Buteau
BEAMLINES; 02h 28
UTILITIES; 02h 00
OTHER; 01h 59
VACCUUM; 03h 14
LINAC; 00h 18
ID; 00h 21
PS; 00:41RF; 00:55
RFPSuppliesLINACInsertionsVaccuumBeamlinesUTILITIESOTHER
Statistics of failures during July Run
Tango is not in the statistics !!
ICALEPS 20055September 2007 – Tango Meeting – A.Buteau
Accelerator status : Control facts
• Software development are still significant for :• Insertions devices installation and commissioning• Slow and feedforward feedbacks
• Major Machine operation requests are focused on : • Enhancements and bug fixes on DeviceServers,
ATK, Archiving systems, starter, statical database, global supervision of Control system
• Remote access a few applications (MAMBO for instance) through WEB interfaces
• New Linux Servers have to be installed to support the increase of monitoring applications (trends,alarms,etc.)
ICALEPS 20056September 2007 – Tango Meeting – A.Buteau
Accelerators : next steps
Recovery procedures are to be written for many systems
Architecture for Oracle Database must be extended for HDB and TDB new
requirementsMore attributes to be stored Extension of retention period of attributes for TDB
New diagnostics, insertions, and operation tools are still to be developped
ICALEPS 20057September 2007 – Tango Meeting – A.Buteau
Tango facts
Last meeting, in March Now in september
ICALEPS 20058September 2007 – Tango Meeting – A.Buteau
Beamlines status
10 beamlines are now beeing commissionedDIFFABSTEMPOODESAMBADESIRSCASSIOPEEPROXIMASWINGSMISMARS
First beam on the MARS beamline
ICALEPS 20059September 2007 – Tango Meeting – A.Buteau
Tango facts on beamlines
SWING beamline
PROXIMA beamline
12 Tango Control System in operationMore than 3000 devices
ICALEPS 200510September 2007 – Tango Meeting – A.Buteau
Next steps on beamlines
On the major part of the beamlines software installation (i.e DeviceServers, java
applications) for « Expert Users » is almost finished
First sequence acquisitions have been done We are now preparing the « Regular operation
phase » :GUI acquisition application developmentHigh level process DeviceServers development
Still a difficult period