1

Bridging the gap between business and IT

Introducing IT governance processes supported by SAP Solution Manager

Wim BorremansProgram Manager

Oliver BuyssensCompetence Lead SAP Solution Manager

SAPience.be Tech Day 2012

Page 2: 1. sa pience be_tech_day_2012_-_infrax

2

Expertum

Founded begin 2006

Team of 50 SAP Experts and Project Managers

Mission : Providing superior long-term customer and employee value

Offering expertise in following domains• Finance

• Supply Chain Management

• Business Intelligence

• Product Lifecycle Management

• Project Management

• SAP Solution Manager

• GRC and Security

• Netweaver

• Own SME Solution: Value4SME

SAP Service Partner, Channel Partner, Value Circle Partner

SAPience.be Partner

SAPience.be Tech Day 2012

Page 3: 1. sa pience be_tech_day_2012_-_infrax

3

Infrax

As multi-utility company, with strong local presence, it is our mission to deliver:• Trustworthy and safe utility networks at the lowest rates• A durable and innovative energy and water management• A qualitative and social service to our customers

SAPience.be Tech Day 2012

Page 4: 1. sa pience be_tech_day_2012_-_infrax

4

Context – Pro-FIT Program

Incident, Problem and Change Request Management

Release Management

Critical Success Factors

Concrete Results

SAPience.be Tech Day 2012

Page 5: 1. sa pience be_tech_day_2012_-_infrax

5

Context

Our IT organization has gone through a significant growth and many changes during the last few years as a consequence of multiple mergers:

• More complex organization• Bigger teams• Multiple locations• Collaboration internal / external resources• Big projects

SAPience.be Tech Day 2012

More structured way of working required

Page 6: 1. sa pience be_tech_day_2012_-_infrax

6

Pro-FIT Program

The Pro-FIT program has the objective to improve our IT services in a structural way, introducing:• More controlled and measureable IT processes• A knowledgeable, efficient and scalable IT organization• Better IT management tools

Following an end-to-end approach involving not only IT but also business:• Increased transparency between business and IT• Added value for Infrax as an organization

Implemented in an iterative way:• Full roadmap including 8 iterations• Small iterations of manageable size• Deliver value early and keep the momentum• Continuous improvement

SAPience.be Tech Day 2012

Page 7: 1. sa pience be_tech_day_2012_-_infrax

7

Key Benefits

ITClear roles and responsibilities

More focus

Realistic workload

Better tools

More scalable organisation

BusinessMore transparency and involvement

Better quality

Better planning

More cost awareness

SAPience.be Tech Day 2012

Page 8: 1. sa pience be_tech_day_2012_-_infrax

8

Pro-FIT Roadmap

Based on the COBIT framework• Objective evaluation of current maturity level• Short and long term targets based on business and IT objectives

SAPience.be Tech Day 2012

Page 9: 1. sa pience be_tech_day_2012_-_infrax

9

Context – Pro-FIT Program

Incident, Problem and Change Request Management

Release Management

Critical Success Factors

Concrete Results

SAPience.be Tech Day 2012

Page 10: 1. sa pience be_tech_day_2012_-_infrax

10

Categorisation

+2500 tickets per month are now categorized into incidents, service request, problems and change requestsThis leads to:• Better visibility – Tool reflects actual situation• More focus – Distinction between 1st / 2nd / 3rd line

SAPience.be Tech Day 2012

Page 11: 1. sa pience be_tech_day_2012_-_infrax

11

Dedicated Processes

Each category of tickets, triggers a specific processIntroducing• Ownership – Each process is end-to-end followed up by one

responsible• Clear roles and responsibilities – Everybody involved in

the process knows exactly what is expected from them

SAPience.be Tech Day 2012

Page 12: 1. sa pience be_tech_day_2012_-_infrax

12

Demo

SAPience.be Tech Day 2012

Incident and problem management in SAP Solution Manager

Page 13: 1. sa pience be_tech_day_2012_-_infrax

13

Agenda

Context – Pro-FIT Program

Incident, Problem and Change Request Management

Release Management

Critical Success Factors

Concrete Results

SAPience.be Tech Day 2012

Page 14: 1. sa pience be_tech_day_2012_-_infrax

14

Why Release Management?

SAPience.be Tech Day 2012

Objectives How to realize?

• Better prioritization of projects and change requests

• Involve PMO and business in the prioritization of projects / change requests and the definition of the release scope

• Realistic workload • Synergies in development and testing• Better capacity planning• More focus

• Stable production environment • Test on a representative and qualitative test environment

• Deploy release in a controlled way in production based on a tested and at release level defined cut-over plan

• Respect of scope and planning • Well defined and controlled release scope• Release planning with clear intermediate

milestones and go-live date

Page 15: 1. sa pience be_tech_day_2012_-_infrax

15

Release Management Process

SAPience.be Tech Day 2012

Wijziging

Analyseren& inschatten Toestaan Plannen Implementeren Afsluiten

Project

Registreren

Beheer van releases (Applicatie)

Wijziging

Analyseren& inschatten Toestaan Plannen Implementeren Deployen AfsluitenRegistreren Valideren

Standaard

Build(D)

Integratie(U)

Productie(P)

Acceptatie(T)

Project

CorrectiefEvolutief

Preventief

Valideren

Onderhoud

Project

Technisch

Urgent

Beheer van releases (Infrastructuur)

AfsluitenPlannen

Deployen

Page 16: 1. sa pience be_tech_day_2012_-_infrax

16

Data Model

SAPience.be Tech Day 2012

Change Request

Standard

Corrective

Preventive

Evolutive

ProjectMaintenance

Implementation

Change Document

General

SAP Normal

SAP Standard

SAP Urgent

Defect Correction

Transport

Transport Task

Incident

Problem

Page 17: 1. sa pience be_tech_day_2012_-_infrax

17

End-to-End Integrated Solution

SAPience.be Tech Day 2012

SAP CRM

SAP ERPSAP Solution Manager

Project

CharmQuality Gate Management

IMG Project

IMG ProjectChange Request

Change Document Transport

Transport Task

Transport

Transport Task

Ticket

Problem

Page 18: 1. sa pience be_tech_day_2012_-_infrax

18

Demo

SAPience.be Tech Day 2012

Change request and release management in SAP Solution Manager

Page 19: 1. sa pience be_tech_day_2012_-_infrax

19

Agenda

Context – Pro-FIT Program

Incident, Problem and Change Request Management

Release Management

Critical Success Factors

Concrete Results

SAPience.be Tech Day 2012

Page 20: 1. sa pience be_tech_day_2012_-_infrax

20

Critical Success Factors

SAPience.be Tech Day 2012

Process Organization Tools• First define the process and align the organization

• SAP Solution Manager only introduced in a second phase

Standard SAP Solution Manager implementation• Standard SAP solution as starting point

• Proper analysis phase – aiming for zero-gap implementation

Successful and intense collaboration between different partners• Infrax process owners

• Entrust-it – Project management, process definition, change management in organization

• Expertum – SAP Solution Manager implementation

Page 21: 1. sa pience be_tech_day_2012_-_infrax

21

Agenda

Context – Pro-FIT Program

Incident, Problem and Change Request Management

Release Management

Critical Success Factors

Concrete Results

SAPience.be Tech Day 2012

Page 22: 1. sa pience be_tech_day_2012_-_infrax

22

Concrete Results

SAPience.be Tech Day 2012

Implementation SAP Solution Manager• Project duration – 4 months

• Total effort – 250 man days

Application maintenance cost reduced by 30%

Some statistics (as of July 2012 to date)• +19.000 incidents / service requests

• +100 problems

• +1.200 change requests and +1.100 change documents

• 25 projects

Page 23: 1. sa pience be_tech_day_2012_-_infrax

23

Contact Details

SAPience.be Tech Day 2012

Wim Borremans

entrust-it - Managing Partner

E   [email protected]

W  http://www.entrust-it.be

M  +32 477 59 72 76

Oliver Buyssens

Expertum - CL

E   [email protected]

W  http://www.expertum.net

M  +32 471 60 95 00

Page 24: 1. sa pience be_tech_day_2012_-_infrax

Thank you!

24SAPience.be Tech Day 2012