1. RM wastage during the month - see 1 RM WIP is provided
15
1. RM wastage during the month - see 1 RM WIP is provided , this + backflush can help in generating Waste reports 2. energy consumption (cost/kw of mseb and diesel and cost/kg of material injected) - see 2