1 • Re-gas compressors to 2.20 Mpa - Me • New oil mist adsorbers in compressors at 20k hrs - Me • Service cold heads - Sumitomo • Replace broken insulating vac valve – Alan & Me • Service ITC503’s and MKS937’s? - Me • Service CCG’s - Me • Service turbos – Dave Hands ex DL Repairs and maintenance of cryostats and compressors before hall installation

Upload: dora-carr

Post on 18-Jan-2018

217 views

Category:

Documents


0 download

DESCRIPTION

Cable and fibre installation plans Ruggedised fibres from 3 PC’s in MLCR to 3x VME Crates in hall Slow controls crate in Tr1 rack holds both 1553, 10M cable to Tr2 VLSB readout crates in both Tr1&Tr2 racks Tracker1 rack already has 3 fibres laid in place Tracker2 needs doing Timing/triggering cables – Speak to Paul, uses few VME modules VLSB cables limited to 9.8 metres in length (AFE’s to VME crate) Get latest rack positions from Ian – needs minor update 3

TRANSCRIPT

Page 1: 1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs - Me Service cold heads - Sumitomo Replace broken insulating vac

1

• Re-gas compressors to 2.20 Mpa - Me• New oil mist adsorbers in compressors at 20k hrs - Me• Service cold heads - Sumitomo• Replace broken insulating vac valve – Alan & Me• Service ITC503’s and MKS937’s? - Me• Service CCG’s - Me• Service turbos – Dave Hands ex DL

Repairs and maintenance of cryostats and compressors before hall installation

Page 2: 1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs - Me Service cold heads - Sumitomo Replace broken insulating vac

Cryo, Electronics and other installation issues • Computers, interfaces & VME crate topology – Caen VME x2• Which computers in what racks • Another Vesda and commissioning – Fire suppression Ltd• New Dry pumps instead of oil based backing pumps –

Alan/Me• 4 x new Turbo controllers - Me• Magnetic shielding for turbos and ??? – Mike C.• Helium bottle & pipework for cassettes• Chilled water for compressors – sorted?• Rack smoke detectors like old system?

2

Page 3: 1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs - Me Service cold heads - Sumitomo Replace broken insulating vac

Cable and fibre installation plans

• Ruggedised fibres from 3 PC’s in MLCR to 3x VME Crates in hall • Slow controls crate in Tr1 rack holds both 1553, 10M cable to Tr2• VLSB readout crates in both Tr1&Tr2 racks • Tracker1 rack already has 3 fibres laid in place• Tracker2 needs doing

• Timing/triggering cables – Speak to Paul, uses few VME modules • VLSB cables limited to 9.8 metres in length (AFE’s to VME crate)• Get latest rack positions from Ian – needs minor update

3

Page 4: 1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs - Me Service cold heads - Sumitomo Replace broken insulating vac

4

Rack layout for ground floor by Q7,8,9,

Page 5: 1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs - Me Service cold heads - Sumitomo Replace broken insulating vac

5

Rack layout for North Mezz extension platform

Page 6: 1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs - Me Service cold heads - Sumitomo Replace broken insulating vac

6

Hall – Ground floor

Page 7: 1 Re-gas compressors to 2.20 Mpa - Me New oil mist adsorbers in compressors at 20k hrs - Me Service cold heads - Sumitomo Replace broken insulating vac

7

Hall – Mezz level