1 | p a g e - wrldc.orgwrldc.org/dsm/2017-18/july 2017/dsm_violation report for july 2017.pdf ·...

9
1 | Page

Upload: trankhue

Post on 07-Feb-2018

220 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: 1 | P a g e - wrldc.orgwrldc.org/DSM/2017-18/July 2017/DSM_Violation Report for July 2017.pdf · MIDC, Marol , Andheri ( East ... (O & M) ,Coastal Gujrat Power Limited, Tunda Bndh

1 | P a g e

Page 2: 1 | P a g e - wrldc.orgwrldc.org/DSM/2017-18/July 2017/DSM_Violation Report for July 2017.pdf · MIDC, Marol , Andheri ( East ... (O & M) ,Coastal Gujrat Power Limited, Tunda Bndh

2 | P a g e

DSM Violation Report of Western Region for July-2017

1.DSM Violation for WR Constituents:

1.1 DSM Violation Summery for WR Constituents:

*Deviation Limits for Renewable Rich States

S.No States having combined installed

capacity of Wind and Solar projects Deviation Limits (MW)-

"L" Name of State

1 1000 – 3000 MW 200 -

2 > 3000 MW 250 Maharashtra, Gujarat and MP

1.2 Violation Type-1 (Max no. of time blocks Violation in a month -31 Days*96Blocks=2976)

No of

Block

violated

Max.

O/D(MW)

No of Block

violated

Max.

U/D(MW)

A= (31 days x

96blocks)(B) (C) (D)=(B+C) (E)=(D*100/A)

(F)= (30days x

8 Violation)(G) (H)=(G*100/F)

Chhattisgarh 2976 730 406 452 -313 1182 40 248 59 24

Guajrat 2976 270 777 719 -818 989 33 248 37 15

Madhya Pradesh 2976 286 835 347 -757 633 21 248 33 13

Maharashtra 2976 685 790 358 -912 1043 35 248 37 15

Goa 2976 182 136 92 -132 274 9 248 67 27

Daman and Diu 2976 841 80 13 -142 854 29 248 191 77

Dadar Nagar Haveli 2976 0 0 18 -114 18 1 248 137 55

ESIL 2976 1086 277 612 -426 1698 57 248 9 4

Violation Type-1 Deviation in excess of (+/-)12% of Schedule or 150 MW whichever is less (*except Renewable Rich State)

Violation Type-2 Sustained deviation from schedule in one direction beyond 12 consecutive time block

DSM Violation for the Month of July 2017 for Constituents of Western Region

Constituents

Violation Type-1 Violation Type-2(ZCV)

Violation when O/D Violation when U/D

Total Time Block

No.of

Blocks

Violated

% of Non-

ComplianceMax Violation

No. of

Violations

% of Non-

Compliance,

Page 3: 1 | P a g e - wrldc.orgwrldc.org/DSM/2017-18/July 2017/DSM_Violation Report for July 2017.pdf · MIDC, Marol , Andheri ( East ... (O & M) ,Coastal Gujrat Power Limited, Tunda Bndh

3 | P a g e

1.3 Violation Type-2, Zero Crossing Violation ( Max Violation in a month -8*31 Days=248)

2.DSM Violation –WR Generating Stations(Regional Entities)

2.1 DSM Violation Summery for Generators:

No of Block

violated

Max.

O/I(MW)

No of Block

violated

Max.

U/I(MW)

A= (31 days x

96blocks)(B) (C) (D)=(B+C) (E)=(D*100/A)

(F)= (30days x 8

Violation)(G) (H)=(G*100/F)

KSTPS 2976 11 157 7 -1093 18 0.6 248 78 31.5

VSTPS I 2976 74 137 22 -192 96 3.2 248 25 10.1

VSTPS II 2976 28 138 40 -481 68 2.3 248 31 12.5

VSTPS III 2976 81 178 41 -467 122 4.1 248 45 18.1

Sipat2 2976 5 105 1 -114 6 0.2 248 24 9.7

Jindal 2976 203 199 19 -99 222 7.5 248 55 22.2

Kawas 2976 29 71 20 -102 49 1.6 248 3 1.2

Gandhar 2976 13 154 11 -88 24 0.8 248 7 2.8Lanco 2976 12 145 43 -274 55 1.8 248 162 65.3

NSPCL 2976 19 62 15 -67 34 1.1 248 43 17.3

Korba7 2976 7 81 9 -190 16 0.5 248 16 6.5

Sipat1 2976 4 158 2 -154 6 0.2 248 29 11.7

RGPPL 2976 34 105 0 0 34 1.1 248 35 14.1

ACBIL 2976 16 244 27 -281 43 1.4 248 131 52.8

BALCO 2976 34 460 485 -241 519 17.4 248 77 31.0

CGPL 2976 4 314 27 -454 31 1.0 248 23 9.3

DCPP 2976 6 57 382 -137 388 13.0 248 75 30.2

VSTPS IV 2976 43 151 76 -249 119 4.0 248 34 13.7

Mauda 2976 22 220 27 -134 49 1.6 248 120 48.4

Emco 2976 8 96 11 -71 19 0.6 248 9 3.6

KSK 2976 16 116 3 -537 19 0.6 248 184 74.2

Essar Mahan 2976 13 114 25 -156 38 1.3 248 46 18.5

Sasan 2976 90 226 11 -627 101 3.4 248 87 35.1DB Power 2976 60 174 13 -516 73 2.5 248 22 8.9

GMR 2976 19 135 0 0 19 0.6 248 92 37.1

JP Nigrie 2976 33 217 43 -403 76 2.6 248 55 22.2

KWPCL 2976 0 0 0 0 0 0.0 248 218 87.9

Vandana 2976 0 0 0 0 0 0.0 248 0 0.0

MB Power 2976 52 236 29 -535 81 2.7 248 28 11.3

JPL-II 2976 0 0 1 -76 1 0.0 248 4 1.6

DGEN 2976 0 0 0 0 0 0.0 248 247 99.6

DHARIWAL 2976 5 3 2 -55 7 0.2 248 5 2.0

VSTPS V 2976 30 111 27 -250 57 1.9 248 31 12.5

RKM Power 2976 13 60 10 -160 23 0.8 248 149 60.1

Jhabua Power 2976 0 0 0 0 0 0.0 248 248 100.0TRN Energy 2976 13 56 28 -220 41 1.4 248 108 43.5

Mouda II 2976 0 0 0 0 0 0.0 248 246 99.2Violation Type-1 Deviation in excess of (+/-)12% of Schedule or 150 MW whichever is less/ 48MW if schedule <= 400MW

Violation Type-2 Sustained deviation from schedule in one direction beyond 12 consecutive time block

DSM Violation for the Month of July 2017 for Generators(Regional Entities) of Western Region

Constituents

Violation Type-1 Violation Type-2(ZCV)

Violation when O/I Violation when U/I% of Non-

Compliance

Total Time

Block Max Violation

No. of

Violations

% of Non-

Compliance

No.of Blocks

Violated

Page 4: 1 | P a g e - wrldc.orgwrldc.org/DSM/2017-18/July 2017/DSM_Violation Report for July 2017.pdf · MIDC, Marol , Andheri ( East ... (O & M) ,Coastal Gujrat Power Limited, Tunda Bndh

4 | P a g e

2.2 Violation Type-1 (Max no. of Violation in a month -31Days*96Blocks=2976):

Page 5: 1 | P a g e - wrldc.orgwrldc.org/DSM/2017-18/July 2017/DSM_Violation Report for July 2017.pdf · MIDC, Marol , Andheri ( East ... (O & M) ,Coastal Gujrat Power Limited, Tunda Bndh

5 | P a g e

Page 6: 1 | P a g e - wrldc.orgwrldc.org/DSM/2017-18/July 2017/DSM_Violation Report for July 2017.pdf · MIDC, Marol , Andheri ( East ... (O & M) ,Coastal Gujrat Power Limited, Tunda Bndh

6 | P a g e

2.3 Violation Type-2, Zero Crossing Violation (Out of Max Violation - 8*31Days=248):

Page 7: 1 | P a g e - wrldc.orgwrldc.org/DSM/2017-18/July 2017/DSM_Violation Report for July 2017.pdf · MIDC, Marol , Andheri ( East ... (O & M) ,Coastal Gujrat Power Limited, Tunda Bndh

7 | P a g e

Page 8: 1 | P a g e - wrldc.orgwrldc.org/DSM/2017-18/July 2017/DSM_Violation Report for July 2017.pdf · MIDC, Marol , Andheri ( East ... (O & M) ,Coastal Gujrat Power Limited, Tunda Bndh

8 | P a g e

Observation-

KWPCL, Jhabua Power, Mouda II and DGEN were having ZERO schedule and drawing the power from the grid.

Vandana Vidyut was having ZERO schedule and Zero drawl from the grid. BALCO was having highest violation type-1 in the Month-17.4%

3.Monthly Deviation Summery of Constituents:

ConstituentsSchedule

In MU

Actual In

MU

Total OD

In MU

Total UD

In MU

No of

Block OD

No of

Block UD

Total OD In

MUTotal UD In MU

No of Block

OD

No of

Block UD

Total

OD In

MU

No of

Block

OD

Total UD

In MU

No of

Block UD

Chhattisgarh 521 538 37 -21 1721 1255 13 -5 730 442 0.00 0 -0.15 10

Gujarat 1547 1485 45 -107 1049 1927 8 -26 270 710 0.00 0 -0.64 9

Madhya Pradesh 2521 2514 57 -64 1402 1574 8 -8 286 333 0.00 0 -0.44 14

Maharashtra 3381 3422 98 -57 1793 1183 21 -12 685 352 0.00 0 -0.24 6

Goa 249 252 8 -5 1667 1309 1 0 182 84 0.00 0 -0.04 8

DD 192 207 16 -1 2542 434 4 -0.129 841 10 0.00 0 -0.008 3

DNH 502 502 7 -7 1340 1636 0 -0.05 0 11 0.00 0 -0.02 7

ESIL 294 308 31 -18 1751 1225 14 -7 1086 605 0.00 0 -0.08 7

Deviation Monthly Summery -for July 2017

Deviation

Deviation in Excess of (+/-) 12% of Schedule or

150MW whichever is less when frequency is in the

band(>=49.7Hz &<50.1Hz)

Deviation

when grid

frequency is

below 49.7 Hz.

Deviation when

grid frequency is

50.1 Hz. and

above

Page 9: 1 | P a g e - wrldc.orgwrldc.org/DSM/2017-18/July 2017/DSM_Violation Report for July 2017.pdf · MIDC, Marol , Andheri ( East ... (O & M) ,Coastal Gujrat Power Limited, Tunda Bndh

9 | P a g e

Distribution List- 1. Chief Engineer(LD), Maharashtra State Electricity Transmission Co.Ltd., State Load Despatch

Centre,Kalwa, Thane-Belapur Road, Airoli, Navi Mumbai 400 708.

2. Chief Engineer (LD), State Load Despatch Centre, Getco, Gotri , Vadodara-390021.

3. Chief Engineer (Comml.), M.P. Power Management Co. Ltd., Shakti Bhavan, Rampur, Jabalpur-482008

4. Chief Engineer (Commercial),C.S. Power Distribution Company Ltd., Danganiya, Raipur- 492013

5. Chief Engineer,Electricity Department, Division-III, Curti, Ponda, Goa 403401

6. Executive Engineer,Electricity Department, Daman & Diu, Oidc, Corporate Office,Plot No. 35,

Somnath,Daman-396210

7. Executive Engineer, Electricity Department, Dadra Nagar Haveli, 66kv Amli Road, Silvassa-396230

8. Vice President-Power Infrastructure Plant- B MRSS, Essar Steel Ltd 27th KM, Surat Hazira Road,Surat-

394270 Gujarat.

9. General Manager (Comml.), NTPC, Samruddhi Trade Complex,2nd Floor, Midc, Marol, Andheri (E),

Mumbai-400 093.

10. Chief Power Controller,Jindal Power Limited, O.P. Jindal Superthermal Power Plant ,Village & Po :

Tamnar, Tehsil :Gharghoda,Dist: Raigarh (Chhattisgarh ) 496107.

11. General Manager (Comml), Lanco Amarkantak Power Private Ltd., Gurgaon – 122 016

12. General Manager (Com. & CP), NTPC Sail Power Co. Pvt. Ltd., New Delhi -110 066

13. Dy. General Manager (Comml), Ratnagiri Gas & Power Pvt. Ltd., 5th Floor , Samrudhi Venture Park

MIDC, Marol, Andheri ( East), Mumbai – 400093.

14. Vice President (Powe CG) Acb India Ltd., 2*135 Mw Kasaipali Power Project, Kasaipali, P.O.- Jawali,

Tehsil-Katghora, Korba –Chhatisgarh-495445

15. GM (O&M)Bharat Aluminium Co. Ltd (BALCO), P.O. Balco Nagar, Distt. Korba -495684 Chhattisgarh

16. Head (O & M) ,Coastal Gujrat Power Limited, Tunda Bndh Road, Tunda Village,Mundra, Kutch, Gujarat-

370435

17. AGM(F&A), DCPP JSPL, Dongamahua Captive Power Plant(4*135 Mw), Dhaurabhata(PO) Raigarh-

496107 (CG)

18. Plant Head,GMR EMCO Energy Ltd. B1, MIDC, Growth Centre, Warora-Post Chandrapur- Dist,

Mahrashtra-442907

19. KSK Mahanadi Power Co. Ltd, 8-2-293/82/A/431/A, Road No 22, Jubilee Hills, Hyderabad-500033

20. Sr. Vice President (EPMPL), Essar Power Mp Limited, Thana Road, Near Chunkumari Stadium,

Waidhan, Dist. Singrauli (MP)-486886

21. Sasan Power Limited, Dhirubahi Ambani Knowledge City, 1 Block, 2nd Floor, North Wing, Thane

Belapur Road, Navi Mumbai-400710

22. MS. D B Power Ltd., 3rd Floor, Naman Corporate Link, C-31, G-Block, Bkc Bandra East,Mumbai-

400051

23. M/S. GMR Energy Trading Limited, New Udaan Bhawan, Terminal-3, Opp. Ats Complex, International

Terminal, Indira Gandhi International Airport, New Delhi- 110037

24. Jaypee Nigrie Super Thermal Power Project( A Unit Of Jaiprakash Power Ventures Limited )Vill- Nigrie,

Tehsil- Saraidistt.- Singrauli, Mp-486669

25. Korba West Power Co. Limited, Village Chhotte Bhandar, P.O. Babe Bhandar,Tehsil Pussore Dist.

Raigarh, Chhattisgarh-496001

26. Vice President(Comml.), Vandana Vidhut Ltd., Vandana Bhavan, M.G. Road, Raipur-492001-Cg

27. GM (Operations)MB Power (Madhya Pradesh) Limited, hotel Govindam, Kotma Road,Anuppur, Madhya

Pradesh – 484224

28. Torrent Energy Limited, DGEN Mega Power Project, Plot No Z-9, Dahej SEZ Area(Eastern Side),Taluka

Vagra Distt Bharuch-392130, Gujrat.

29. GM-Coordination, Dhariwal Infrastruture Ltd,CESC House, Chowringheesquare, Kolkata-700001

30. Chief General Manager, RKM Powergen Pvt Ltd, Village Uchpinda, PO Dhurkot, Via Chandrapur,

Tehsil- Dabra, Janjgir-Champa Dist, Chhattisgarh-495692

31. Head-Business Development , Jhabua Power Ltd.,6th Floor,Vatika City Point M.G.Road Gurgaon-122002

32. Sr. VP Power, TRN Energy Pvt ltd, 18, Vasant enclave, Rao tula ram marg,New delhi-110057